CLIN_-_004_RFI_00013_-_RampCurbAnchBolts.pdf

PDF 81 KB Posted

Attached to
Completion of Five Health Centers Renovation near Awassa Project in the communities of Arsi Negele, Batu, Durame, Gimbichu, and Waka
Solicitation number
SOL-663-15-000028
Issued by

About this file

CLIN_-_004_RFI_00013_-_RampCurbAnchBolts

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

Gimbichu 00013 Meki 00008

24-Mar-14 1 The anehor bolts to be used on the ramp curb were not unfortunately cast with the concrete as per the plan (C-005). We request your approval to drill holes and install expansion anchor bolts.

Construct as per the drawings.

26-Mar-14

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

International Relief It Development h"f'M~ film. };1I.iit/ittf,l,mdibaM."

TK International Building No.2 5th Floor Addis Ababa, -

TRANSMITTAL

No. 00023

PROJECT: TO-14-00003 (TO#8) HC Renovations DATE: Monday, March 24, 2014

TO: USAID/ET

US Embassy Addis Ababa, ATTN: Roger Sydney

WE ARESENDING:

ID Shop Drawings

D Letter

D Prints

D Change Order

D Plans

D Samples

D Specifications

[if Other: Request for Jnforrnation

ITEM PAC~GE REV.

RPI

Remarks:

ee: IRD Document Control

P.O. Box 6005

REF: Request for Information

SUBMITTED.FO:R:i .......... ACTIONTAKEN:

D Approval D Approved as Submitted

D YourUse D Approved as Noted

D As Requested D Retumed After Loan

IIif Review and Comment D Resubmit

[if Submit

SJtNTVIA: D Retumed

I [il! Attached D Retumed for Corrections

D Separate Cover Via: Mail D Due Date:

DATE DESCRIP'l'ION. STATUS

3/24/2014 Ramp Curb Anchor Bolts OPN

Signed: _::t:.=~J::.q..-= __ _ www.ird.org Tel.: +251·016·630023

International Relief Bc Development Iml'fO'l1in.g l';:I)es. JJl/.iMing LivtlihoOlb.

TK International Building No.2 5th Floor

Addis Ababa

TITLE: Ramp Curb Anehor Bolts

PROJECT: TO-14-00003 TO#8 HC Renovations

TO: USAID/ET

Addis Ababa

ATTN: Roger Sydney

QUES'T" 1",0' , 'N"" '" ,:;;j~i r!/'~:''',;:,,< ':' "<", ,,', " , :.i:.:;J'·~~'';>:~;.~''5;~;J»t/~.>;:,· ''', "'." 0;',"1,; .>:,,·,"0r/<;";:, REQUEST FOR INFORMATION

GIMBICHU No. 00013

MEKI No. 00008

DATE: Monday, Mareh24, 2014

Contract No.:

US Embassy

The anehor bolts to be used on the ramp eurb were not unfortunately east with the eonerete as per the plan (e - 005). We request your approval to drill holes and install expansion anehor bolts.

Note: IRD has not assessed the fulJ impaet of this issue in terms of additional eost and extension of time. IRD reserYes the right to submit a claim as provided in Contraet Seetion I.

Signed: --==:::!:!I:4~~,L-----