About this file

CLIN_-_004_RFI-00009_Various

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
CLIN_-_003_RFI_00008_GalvStlWaterSvcPiping.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

1 In OPD Block ANC room, the drawing shows an existing HWB (AR - 004).

However, the HWB shown does not exist on site. Please clarify.

Please see attached revised drawing AR-004 for revised dimensions at ANC room, and for other minor changes at OPD Block.

2 In OPD Block in the same room (former Registration room), the actual dimensions are different from the given dimensions (AR - 004). The door opening direction is also different to what is shown (please refer to attached drawing* of the actual dimensions). Please clarify.

* Please note that the HWB shown in the attached drawing does not exist as stated in Q.l

Please see attached revised drawing AR-004 and SN-003 for minor changes at OPD Block.

3 In the Site Utilities Plan (SN - 001), the diameter sizes of the sewer pipes going from manhole to manhole are not shown. Please clarify.

Diameter size of sewer pipes is to be 160mm.

12-Mar-14

27-Feb-14Gimbichu 00009

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

REGISTRATION

ROOM

PVC tiles 26.14m² remove door and frame remove window and frame

20 579 20 20 578 20 demolish walls and remove all sanitary fittings remove HWB

TB CLINIC

PVC tiles 12m²

NURSE STATION

terrazzo tiles 5.42m²

NURSE

STATION

PVC tiles 12m²

DRUGSTORE

PVC tiles 26.14m² salvage water heater existing steps to be demolished and existing trench partially demolished remove window and frame

8011718511780

9810511782 door to remain windowr to remainno new opening new laboratory cabinet new HCB infill

ANC & FAMILY

PLANNING

PVC tiles 12m²

EPI/UNDERFIVE

PVC tiles 12m²

OPD 1

PVC tiles 12m²

OPD 2

PVC tiles 12m²

OPD 3

PVC tiles 12m²

LABORATORY

polyurethane cement floor system 19.8m²

SAMPLE ROOM

polyurethane cement floor system

4.75m² new HCB infill

20 280 20 271 20 275 20 578 20 new HWB

D11 new HWB new HWB

X 98.56

X 98.26

X 97.96

REFER TO C-005

new HCB wall new ceramic threshold new ceramic threshold

G4G4

Handrail

New trench around new ramp

AR-004 C-003

new PVC downpipe,Typical

D11

D11 new HCB wall

80 83 117 80

2604085193

D2

AR-006 AR-009

82 90 door to remain windowr to remain

WH

OPD BLOCK: PLANS

AR-004

EXISTING CONDITIONS AND DEMOLITION PLAN

O

PD

B

LO

C K

: P

LA

N S

RENOVATION PLAN

0 5m1 2 3 41

Scale 1:50

BM

TE

TR

A

T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

G S

D

ES

IG

N

ED

B

Y

D W

N B

Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

DA

TE

AP

R

SY

MB

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(Gimbichu) Site # 208

G

IM

B

IC

H U

H E A

LT

H

C E N

T E R

R E N

O V

A T

IO

N

S

IT

E N

O

/0

5/

0%

D es ig n

D ev el op m en t D ra w in gs

BM

ENTRANCE

KINDERGARTEN

NEW SINGLE STORY HOSPITAL PROJECT SITE

(UNDER CONSTRUCTION)

HIGH SCHOOL

ROAD

NOTES:

1. Fill and patch openings from demolished elements,plaster and paint all hcb work to match adjacent existing or new

2. Refinish doors and windows per AR-020

3. Refer to AR-021 FINISHING SCHEDULE

4. Refer to AR-010 Renovation schedule and Civil, Electrical and Sanitary drawings for additional work this block

/1

2/

RF

I-0 laboratory sink

Fro m w ate r su pply lin e

+2.60

+0.90

Laboratory sink

50 ltr.

W.H

To drain

+0.40

Ø8

To m anhole

±0.00 ±0.00

+0.90

Ø8

Ø25

Ø

Ø

+0.90

Laboratory sink

Ø25

Ø

WH

To MH

From Water Supply Line

Ø m m

Ø m m

Ø25mm

NEW LAB SINK

50mm vent pipe

To Existing Manhole

From existing water supply

Ø25

Ø110

Ø80

Ø110

NEW WC

NEW HWB

handwash

Vent cap

ROOF

Fro m w ate r su pply lin e

+0.90

HWB

Ø50

Ø1

To exist ing m anhole

±0.00

±0.00

+0.90

Ø1 from wc wc

Ø2

Ø2 5 Ø2

Ø

Ø1

Ø80 Ø80

BM

TE

TR

A

T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

G S

D

ES

IG

N

ED

B

Y

D W

N B

Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

DA

TE

AP

R

SY

MB

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(Gimbichu) Site # 208

G

IM

B

IC

H U

H E A

LT

H

C E N

T E R

R E N

O V

A T

IO

N

S

IT

E N

O

/0

5/

0%

D es ig n

D ev el op m en t D ra w in gs

BM

SN-003

O

PD

A N

D R

EG

IS

TR

A

TIO

N

B

LO

C

KS

A N

D R

IS

ER

D

IA

G

RA

M S

OPD AND REGISTRATION BLOCKS :

SANITARY PLANS AND RISER DIAGRAMS

LABORATORY SANITARY PLAN

WASTE WATER HOT AND COLD WATER SUPPLY

LABORATORY RISER DIAGRAM

ENTRANCE

KINDERGARTEN

NEW SINGLE STORY HOSPITAL PROJECT SITE

(UNDER CONSTRUCTION)

HIGH SCHOOL

ROAD

INFECTIOUS DISEASE

SANITARY PLAN

WASTE WATER WATER SUPPLY

INFECTIOUS DISEASE TOILET RISER DIAGRAM

UNO, ALL DIMS ARE IN MM AND ELEVATIONS ARE IN M

RF

I 0

/1 2/

International Rdi<f 8i; Ot:vdopm<Dt

TK International Building No.2 5th Floor Addis Ababa, TRANSMITTAL

No. 00018

PROJECT: TO-14-00003(TO#8)Gimbichu Renovation DATE: Thursday, February 27,2014

TO:

ATTN:

Prints

Chan e Order

Plans

Sam les

ITEM

RFI

Remarks:

USAIDIET

US Embassy Addis Ababa, Roger Sydney

"REV.

cc: IRD Document Control

P.O. Box 6005

COPIES

REF: Request for Information

A roved as Submitted

Submit

Returned

Returned for Corrections

Mail Due Date:

DATE DESCRIPTION

2/26/2014 Different Issues - 4 OPN

Signed: ......;==-~~4,-----www.ird.org Tel.: +251-016-630023

International Relief &: Development /mp"",;ng Liz"". Building Livelih""ds.

TK International Building No.2

5th Floor

Addis Ababa

TITLE: Different Issues - 4

PROJECT: TO-14-00003(TO#8) Gimbichu Renovation

TO: USAIDIET

Addis Ababa

ATTN: Roger Sydney

QUESTION:

REQUEST FOR INFORMATION

No. 00009

DATE: Thursday, February 27, 2014

Contract No.: TO#8

US Embassy

TO#8

1. In OPD Block ANC room, the drawing shows an existing HWB (AR - 004). However, the HWB shown does not exist on site. Please clarify.

2. In OPD Block in the same room (former Registration room), the actual dimensions are different from the given dimensions (AR - 004). The door opening direction is also different to what is shown (please refer to attached drawing* of the actual dimensions). Please clarify.

* Please note that the HWB shown in the attached drawing does not exist as stated in Q.l

3. In the Site Utilities Plan (SN - 001), the diameter sizes of the sewer pipes going from manhole to manhole are not shown. Please clarify.

i nal Relief and Development

Signed: --~"""' ___ IfII=----

P.O. Box 6005 www.ird.org Tel.: +251-0116-630023

O

PD block registration room

File details come from the government source that posted it. Updated .