USAID/EHIP
New Health Center Construction Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up
1 In OPD Block ANC room, the drawing shows an existing HWB (AR - 004).
However, the HWB shown does not exist on site. Please clarify.
Please see attached revised drawing AR-004 for revised dimensions at ANC room, and for other minor changes at OPD Block.
2 In OPD Block in the same room (former Registration room), the actual dimensions are different from the given dimensions (AR - 004). The door opening direction is also different to what is shown (please refer to attached drawing* of the actual dimensions). Please clarify.
* Please note that the HWB shown in the attached drawing does not exist as stated in Q.l
Please see attached revised drawing AR-004 and SN-003 for minor changes at OPD Block.
3 In the Site Utilities Plan (SN - 001), the diameter sizes of the sewer pipes going from manhole to manhole are not shown. Please clarify.
Diameter size of sewer pipes is to be 160mm.
12-Mar-14
27-Feb-14Gimbichu 00009
P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED
REGISTRATION
ROOM
PVC tiles 26.14m² remove door and frame remove window and frame
20 579 20 20 578 20 demolish walls and remove all sanitary fittings remove HWB
TB CLINIC
PVC tiles 12m²
NURSE STATION
terrazzo tiles 5.42m²
NURSE
STATION
PVC tiles 12m²
DRUGSTORE
PVC tiles 26.14m² salvage water heater existing steps to be demolished and existing trench partially demolished remove window and frame
8011718511780
9810511782 door to remain windowr to remainno new opening new laboratory cabinet new HCB infill
ANC & FAMILY
PLANNING
PVC tiles 12m²
EPI/UNDERFIVE
PVC tiles 12m²
OPD 1
PVC tiles 12m²
OPD 2
PVC tiles 12m²
OPD 3
PVC tiles 12m²
LABORATORY
polyurethane cement floor system 19.8m²
SAMPLE ROOM
polyurethane cement floor system
4.75m² new HCB infill
20 280 20 271 20 275 20 578 20 new HWB
D11 new HWB new HWB
X 98.56
X 98.26
X 97.96
REFER TO C-005
new HCB wall new ceramic threshold new ceramic threshold
G4G4
Handrail
New trench around new ramp
AR-004 C-003
new PVC downpipe,Typical
D11
D11 new HCB wall
80 83 117 80
2604085193
D2
AR-006 AR-009
82 90 door to remain windowr to remain
WH
OPD BLOCK: PLANS
AR-004
EXISTING CONDITIONS AND DEMOLITION PLAN
O
PD
B
LO
C K
: P
LA
N S
RENOVATION PLAN
0 5m1 2 3 41
Scale 1:50
BM
TE
TR
A
T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(Gimbichu) Site # 208
G
IM
B
IC
H U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
/0
5/
0%
D es ig n
D ev el op m en t D ra w in gs
BM
ENTRANCE
KINDERGARTEN
NEW SINGLE STORY HOSPITAL PROJECT SITE
(UNDER CONSTRUCTION)
HIGH SCHOOL
ROAD
NOTES:
1. Fill and patch openings from demolished elements,plaster and paint all hcb work to match adjacent existing or new
2. Refinish doors and windows per AR-020
3. Refer to AR-021 FINISHING SCHEDULE
4. Refer to AR-010 Renovation schedule and Civil, Electrical and Sanitary drawings for additional work this block
/1
2/
RF
I-0 laboratory sink
Fro m w ate r su pply lin e
+2.60
+0.90
Laboratory sink
50 ltr.
W.H
To drain
+0.40
Ø8
To m anhole
±0.00 ±0.00
+0.90
Ø8
Ø25
Ø
Ø
+0.90
Laboratory sink
Ø25
Ø
WH
To MH
From Water Supply Line
Ø m m
Ø m m
Ø25mm
NEW LAB SINK
50mm vent pipe
To Existing Manhole
From existing water supply
Ø25
Ø110
Ø80
Ø110
NEW WC
NEW HWB
handwash
Vent cap
ROOF
Fro m w ate r su pply lin e
+0.90
HWB
Ø50
Ø1
To exist ing m anhole
±0.00
±0.00
+0.90
Ø1 from wc wc
Ø2
Ø2 5 Ø2
Ø
Ø1
Ø80 Ø80
BM
TE
TR
A
T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(Gimbichu) Site # 208
G
IM
B
IC
H U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
/0
5/
0%
D es ig n
D ev el op m en t D ra w in gs
BM
SN-003
O
PD
A N
D R
EG
IS
TR
A
TIO
N
B
LO
C
KS
A N
D R
IS
ER
D
IA
G
RA
M S
OPD AND REGISTRATION BLOCKS :
SANITARY PLANS AND RISER DIAGRAMS
LABORATORY SANITARY PLAN
WASTE WATER HOT AND COLD WATER SUPPLY
LABORATORY RISER DIAGRAM
ENTRANCE
KINDERGARTEN
NEW SINGLE STORY HOSPITAL PROJECT SITE
(UNDER CONSTRUCTION)
HIGH SCHOOL
ROAD
INFECTIOUS DISEASE
SANITARY PLAN
WASTE WATER WATER SUPPLY
INFECTIOUS DISEASE TOILET RISER DIAGRAM
UNO, ALL DIMS ARE IN MM AND ELEVATIONS ARE IN M
RF
I 0
/1 2/
International Rdi<f 8i; Ot:vdopm<Dt
TK International Building No.2 5th Floor Addis Ababa, TRANSMITTAL
No. 00018
PROJECT: TO-14-00003(TO#8)Gimbichu Renovation DATE: Thursday, February 27,2014
TO:
ATTN:
Prints
Chan e Order
Plans
Sam les
ITEM
RFI
Remarks:
USAIDIET
US Embassy Addis Ababa, Roger Sydney
"REV.
cc: IRD Document Control
P.O. Box 6005
COPIES
REF: Request for Information
A roved as Submitted
Submit
Returned
Returned for Corrections
Mail Due Date:
DATE DESCRIPTION
2/26/2014 Different Issues - 4 OPN
Signed: ......;==-~~4,-----www.ird.org Tel.: +251-016-630023
International Relief &: Development /mp"",;ng Liz"". Building Livelih""ds.
TK International Building No.2
5th Floor
Addis Ababa
TITLE: Different Issues - 4
PROJECT: TO-14-00003(TO#8) Gimbichu Renovation
TO: USAIDIET
Addis Ababa
ATTN: Roger Sydney
QUESTION:
REQUEST FOR INFORMATION
No. 00009
DATE: Thursday, February 27, 2014
Contract No.: TO#8
US Embassy
TO#8
1. In OPD Block ANC room, the drawing shows an existing HWB (AR - 004). However, the HWB shown does not exist on site. Please clarify.
2. In OPD Block in the same room (former Registration room), the actual dimensions are different from the given dimensions (AR - 004). The door opening direction is also different to what is shown (please refer to attached drawing* of the actual dimensions). Please clarify.
* Please note that the HWB shown in the attached drawing does not exist as stated in Q.l
3. In the Site Utilities Plan (SN - 001), the diameter sizes of the sewer pipes going from manhole to manhole are not shown. Please clarify.
i nal Relief and Development
Signed: --~"""' ___ IfII=----
P.O. Box 6005 www.ird.org Tel.: +251-0116-630023
O
PD block registration room