USAID/EHIP
New Health Center Construction
Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251
Gimbichu Site 208 Arsi Negele Site 277
Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up
Gimbichu
00029
4-Nov-14 1 Water supply lines are to be installed as shown in Site Utilities Plan (SN
— 001). However, control valves are only shown at entrance to blocks.
Do we need valves elsewhere as well?. There is also no water supply line shown to be installed for Pit Latrine. Please clarify.
1. Water supply control valves shall be at entrance to blocks.
2. Pit latrine will get water supply. The cost will be covered by omitting the water line loop between Registration and OPD Blocks and using credit to supply to Pit latrine. See attached revised Sheet SN-001.
1. Concerning control valves please proceed as per the drawings.
2. Concerning pit latrine water supply please refer to SN-010 for installation detail.
11/12/2014
11/17/14
P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED
REGISTRATION BLOCK
FFL 97.42
OPD BLOCK
FFL 98.56
ART BLOCK
FFL 98.00
DELIVERY BLOCK
FFL 98.14
PIT
LATRINE
NEW WASTEWATER LINE AND MANHOLE, TYP.
EXST WATER RESERVOIR
NEW WATER DISTRIBUTION LINE.TYP
EXST. WATER METER
MDB
(3PHASE)
EP
EP
X 98.99X 99.08X 98.70
X 98.47X 98.45
X 98.03X 97.88X 97.78
X 99.69
X 99.61
X 99.47
X 99.57X 99.55
X 98.97X 97.947
X 99.650
X 97.947
X 99.18 X 99.34
X 98.96X 98.91
X 99.06X 98.947X 98.99X 98.95
X 97.20
X 95.62 X 95.61
X 97.21 X 97.14X 96.96
X 96.61 X 96.25X 96.36
X 99.00
X 98.45
X 97.98
X 98.70
X 98.45 X 98.36
X 97.997
X 98.90
X 98.53
X 98.85
X 98.43
X 97.557
X 97.17
X 96.90
X 96.47
X 96.78 X 96.67X 96.61
X 95.70X 96.37X 96.29
X 95.90X 96.06
X 97.61
X 97.59
X 96.86
X 96.14
MDB
from EEPCo Power Line to Kilowatt Hour Meter
Manhole 600x600x600mm
Manhole 600x600x600mm
KWH
MH1
MH6
MH21 MH20 MH19
MH18
MH9
MH10
MH7
MH4 MH5
MH2
MH3
MH 8
MH22
MH23
NEW SEPTIC TANK
PER1/CX-135
11.523.354.97
7.445.82
2.
6.
7.
5.
3.56
2.
6.6
1.
4.22 4.
6.00SOAK AWAY PIT
PER 4/CX-135
2.00
3.00
0.00 5.35 4.90 3.07 5.32
1.
1.00
5.
BM
TE
TR
A
T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(Gimbichu) Site # 208
G
IM
B
IC
H U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
/0
5/
0%
D es ig n
D ev el op m en t D ra w in gs
BM
SN-001
S
IT
E U
TI
LI
TI
ES
P
LA
N
SITE UTILITES PLAN
-5m 0 10m
Scale 1:150
20m
NOTE:
1. Top elevation of sewer manholes shall be set by
Contractor minimum 6cm above finished grade.
2. Finished grade over installed pipelines shall provide minimum 40 cm cover of suitable soil.
3. Shutoff valves shall be placed within 1m of all service points.
4. All water services shall be minimum Ø25mm PVC with shutoff valves & transition to interior pipe sizes shown on plumbing drawing.
5. Replace sewer lines and manholes to connect to existing Holding tank
6. Install new water distribution lines
7. All sanitary sewer lines going from manhole to manhole shall be Ø160mm
8. Refer to Invert Elevation schedule
9. All invert elevations are to be confirmed on site 10.Establish single reference bench mark at health science dormitory block finished floor elevation at 100.00meters