CLIN_-_004_RFI_00029-WaterSupplyLines

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
CLIN_-_003_RFI_00008_GalvStlWaterSvcPiping.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction

Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251

Gimbichu Site 208 Arsi Negele Site 277

Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

Gimbichu

00029

4-Nov-14 1 Water supply lines are to be installed as shown in Site Utilities Plan (SN

— 001). However, control valves are only shown at entrance to blocks.

Do we need valves elsewhere as well?. There is also no water supply line shown to be installed for Pit Latrine. Please clarify.

1. Water supply control valves shall be at entrance to blocks.

2. Pit latrine will get water supply. The cost will be covered by omitting the water line loop between Registration and OPD Blocks and using credit to supply to Pit latrine. See attached revised Sheet SN-001.

1. Concerning control valves please proceed as per the drawings.

2. Concerning pit latrine water supply please refer to SN-010 for installation detail.

11/12/2014

11/17/14

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

REGISTRATION BLOCK

FFL 97.42

OPD BLOCK

FFL 98.56

ART BLOCK

FFL 98.00

DELIVERY BLOCK

FFL 98.14

PIT

LATRINE

NEW WASTEWATER LINE AND MANHOLE, TYP.

EXST WATER RESERVOIR

NEW WATER DISTRIBUTION LINE.TYP

EXST. WATER METER

MDB

(3PHASE)

EP

EP

X 98.99X 99.08X 98.70

X 98.47X 98.45

X 98.03X 97.88X 97.78

X 99.69

X 99.61

X 99.47

X 99.57X 99.55

X 98.97X 97.947

X 99.650

X 97.947

X 99.18 X 99.34

X 98.96X 98.91

X 99.06X 98.947X 98.99X 98.95

X 97.20

X 95.62 X 95.61

X 97.21 X 97.14X 96.96

X 96.61 X 96.25X 96.36

X 99.00

X 98.45

X 97.98

X 98.70

X 98.45 X 98.36

X 97.997

X 98.90

X 98.53

X 98.85

X 98.43

X 97.557

X 97.17

X 96.90

X 96.47

X 96.78 X 96.67X 96.61

X 95.70X 96.37X 96.29

X 95.90X 96.06

X 97.61

X 97.59

X 96.86

X 96.14

MDB

from EEPCo Power Line to Kilowatt Hour Meter

Manhole 600x600x600mm

Manhole 600x600x600mm

KWH

MH1

MH6

MH21 MH20 MH19

MH18

MH9

MH10

MH7

MH4 MH5

MH2

MH3

MH 8

MH22

MH23

NEW SEPTIC TANK

PER1/CX-135

11.523.354.97

7.445.82

2.

6.

7.

5.

3.56

2.

6.6

1.

4.22 4.

6.00SOAK AWAY PIT

PER 4/CX-135

2.00

3.00

0.00 5.35 4.90 3.07 5.32

1.

1.00

5.

BM

TE

TR

A

T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

G S

D

ES

IG

N

ED

B

Y

D W

N B

Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

DA

TE

AP

R

SY

MB

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(Gimbichu) Site # 208

G

IM

B

IC

H U

H E A

LT

H

C E N

T E R

R E N

O V

A T

IO

N

S

IT

E N

O

/0

5/

0%

D es ig n

D ev el op m en t D ra w in gs

BM

SN-001

S

IT

E U

TI

LI

TI

ES

P

LA

N

SITE UTILITES PLAN

-5m 0 10m

Scale 1:150

20m

NOTE:

1. Top elevation of sewer manholes shall be set by

Contractor minimum 6cm above finished grade.

2. Finished grade over installed pipelines shall provide minimum 40 cm cover of suitable soil.

3. Shutoff valves shall be placed within 1m of all service points.

4. All water services shall be minimum Ø25mm PVC with shutoff valves & transition to interior pipe sizes shown on plumbing drawing.

5. Replace sewer lines and manholes to connect to existing Holding tank

6. Install new water distribution lines

7. All sanitary sewer lines going from manhole to manhole shall be Ø160mm

8. Refer to Invert Elevation schedule

9. All invert elevations are to be confirmed on site 10.Establish single reference bench mark at health science dormitory block finished floor elevation at 100.00meters