Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Completion of Five Health Centers Renovation near Awassa Project in the communities of Arsi Negele, Batu, Durame, Gimbichu, and Waka
Solicitation number
SOL-663-15-000028
Issued by

About this file

Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
CLIN_-_003_RFI_00008_GalvStlWaterSvcPiping.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gimbichu

Engineer's QA Punch List - Electrical Work Items
Location:GIMBICHU HEALTH CENTERDate of Visit:20-Apr-15
Must be completed immediately for substantial completion
Already completed
whiteMust be completed within warranty period
NOTE:Uninstalled parts may need connections in ceilings and must be finished before start of waranty period due to safety reason. Any new installation and new material supplies need 1 year waranty after handing over.
Detailed Punch List Items:Clean-Up
Location/RoomPunch List CommentsRatingComments
I) OPD
1Verandah1.1Label the neutral line, neutral bus and the ground bus in LPP-A
2Sample Room2.11 socket outlet is not installed
3Ceiling3.1Conduits are unfinished to light fixtures and junction boxes.
3.2Different size RNC conduits are used, only 16mm diam should be used
3.3Additional conduit supports are required
3.4Junction boxes are over filled, cable glands of junction boxes are not used
II) Delivery Block:
1Delivery1.1Type 4.1 Emergency light fixtures are not installedInstall UPS for these 4.1 lights + (3x1.5) mm sq electric power cable from UPS to light points, multi-core copper conductor, PVC/PVC, colorcoded, in PVC conduit diameter 32 mm with conduit supports. Include new 100A battery. Install new, 11 watt CFL light bulbs instead of the fluorescent tubes.
2Outdoor, front and back side2.1Light switch is not weather proof
3Postnatal3.1Type 4.1 Emergency light fixtures are not installedInstall UPS for these 4.1 lights + (3x1.5) mm sq electric power cable from UPS to light points, multi-core copper conductor, PVC/PVC, colorcoded, in PVC conduit diameter 32 mm with conduit supports. Include new 100A battery. Install new, 11 watt CFL light bulbs instead of the fluorescent tubes.
4Toilet4.1Light switches is not water proof type
4.2Water heater socket needs switch
5Labor5.1Type 4.1 Emergency light fixtures are not installed,Install UPS for these 4.1 lights + (3x1.5) mm sq electric power cable from UPS to light points, multi-core copper conductor, PVC/PVC, colorcoded, in PVC conduit diameter 32 mm with conduit supports. Include new 100A battery. Install new, 11 watt CFL light bulbs instead of the fluorescent tubes.
6Toilet6.1Light switches is not water proof type
6.2Water heater socket needs switch
6.3Lamp holder has loose connection
7Ceiling7.1Conduits are unfinished to light fixtures
7.2Two types of RNC conduits are being used, 32 and 16mm diams, only 16mm should be used
7.3Conduits are not well organized to the building structure
7.4Junction boxes should be sealed by bushings
7.5Additional conduit supports are required-/30cm from fixture and junction boxes and at max spacing of 2 meters/
III) Registration Block:
1Verandah1.1Tele terminal box is not installed, connection to each room outlet is not done in the terminal box.
2Finance2.1One socket outlet is not installed.
3TB clinic3.1Install water proof wiring device for the mirror socket outlet
3.2Verandah light switch is not weather proof
4Passage/Verandah4.1Conduits are unfinished to light fixtures
5Dispensary5.1Water heater socket needs switch
6Ceiling6.1Junction boxes are over filled
6.2Cable glands are missed from junction boxes
6.3Additional junction boxes are required
6.4Conduiting is not organized to the building structure
6.5Conduits are unfinished to lighting fixtures
6.6Additional supports are required
IV) ART Block:
1LPP-B1.1Make jumping wires 6mm2
1.2Label main neutral line, neutral bus and ground bus
2Ceiling4.1Cable glands are missed from junction boxes
4.2Conduiting is not organized to the building structure
4.3Conduits are unfinished to lighting fixtures
4.4Additional supports are required
V) Pit Latrine Block:
1Verandah1.11 Light switch and 1 light fixture are not installed, conduits and wires are done
1.24-Type 5 light fixtures are not installed, conduits and wires are done
VI) General Site Work
1Site Work1.1New 3 phase power supply from EEPCO is connected and measured to be 180 V during daylight hours. The old electric meter has been relocated to the new meter location.
1.2New electrical manhole is not installed
1.3Tele supply cable is pulled but is not connected.
1.4Testing should be done to all blocks' electrical worksMDB failed megger testing to EEPCO power source. Short was also detected on breaker #2 on LPP-C. Many light fixtures in ART, OPD, Delivery, Registration Blocks do not work when Block panel powered on. Sources of electrical errors must beidentified and corrected.
1.5Load distributions in boards should be per schedules
1.6Label the neutral and ground cables in all distribution boards
1.8Solar powered compound light fixtures are not installed
Attachments:
Comments and observations are provided in this report for the use of the Client. Nothing in this report should be taken by the Contractor as a directive to modify the plans, specifications or completed work unless appropriate documentation is provided by the Client.
Bizuayehu Tessema
---End of Report---