CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf

PDF 95 KB Posted

Attached to
Completion of Five Health Centers Renovation near Awassa Project in the communities of Arsi Negele, Batu, Durame, Gimbichu, and Waka
Solicitation number
SOL-663-15-000028
Issued by

About this file

CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
CLIN_-_003_RFI_00008_GalvStlWaterSvcPiping.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

Batu 00007

5-Mar-14 1 On the Site Utilities Plan (SN - 001), water supply lines and sewer lines pass behind Delivery Block. But the space behind Delivery Block is narrow and impossible to maintain the minimum 3 m horizontal distance between the water lines and sewer lines as stated in SN - 000 (please refer to attached pictures). Please clarify.

Water supply lines at the back of the Delivery Block can be changed to surface mounted. Surface mount to wall in galvanized steel pipe attached with galvanized steel brackets every 1M. 11-Mar-14

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

TK International Building No.2 5th Floor Addis Ababa, PROJECT: TO-14-00003(TO#8)Batu Renovation

TO: USAID/ET

US Embassy Addis Ababa, ATTN: Roger Sydney

WE ARE SENDING:

0 Shop Drawings

D Letter

0 Prints

D Change Order

D Plans

D Samples

D Specifications

Iif Other: Request for Information

ITEM PACKAGE REV.

RFI

Remarks:

cc: IRD Document Control

P.O. Box 6005

SUBMITTED FOR:

D Approval

D Your Use

D As Requested

~ Review and Comment

SENT VIA:

!if Attached

D Separate Cover Via: Mail

COPIES DATE

3/4/2014 www.ird.org

TRANSMITTAL

No. 00017

DATE: Wednesday, March 05, 2014

REF: Request for Information

ACTION TAKEN:

D Approved as Submitted

D Approved as Noted

D Returned A fier Loan

D Resubmit llif Submit

0 Returned

D Returned for Corrections

D Due Date:

DESCRIPTION STATUS

Water Supply Lines OPN

Signed: .::::j==~r-!l-~JI-----

Tel.: +251-016-630023

International Relief & Development

TK International Building No.2

5th Floor

Addis Ababa

TITLE: Water Supply Lines

PROJECT: TO-14-00003(TO#8) Batu Renovation

TO: USAID/ET

Addis Ababa

ATTN: Roger Sydney

QUESTION:

REQUEST FOR INFORMATION

No. 00007

DATE: Wednesday, March 05, 2014

Contract No.: TO#8

US Embassy

On the Site Utilities Plan (SN - 001), water supply lines and sewer lines pass behind Delivery Block. But the space behind Delivery Block is narrow and impossible to maintain the minimum 3 m horizontal distance between the water lines and sewer lines as stated in SN - 000 (please refer to attached pictures). Please clarify.

Requested _- Signed: .d.==4-~~~----

P.O. Box 6005 www.ird.org Tel.: +251-0116-630023

TO#8

File details come from the government source that posted it. Updated .