USAID/EHIP
New Health Center Construction Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up
Arsi Negele 00011
5-Jun-14 1 The Main Distribution Board Schedule (EL - 001) shows power to be supplied to the pump control panel at the existing elevated water tank behind Delivery Block. However, there is no detail shown in the Site Electrical Plan (EL - 007). Please clarify.
Power lines will not be brought to the pump at the elevated water tank.
However, leave the circuit breaker for the pump on the Main Distribution Board as designed.
12-Jun-14
P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED