Completion of Five Health Centers Renovation near Awassa Project in the communities of Arsi Negele, Batu, Durame, Gimbichu, and Waka
Solicitation number
SOL-663-15-000028
Issued by

About this file

CLIN_-_001_RFI_00002_fixing_PVCCeiling

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
CLIN_-_003_RFI_00008_GalvStlWaterSvcPiping.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow‐up Arsi Negele 00002 26‐Dec‐13 1 The Drawing calls for the provision of PVC ceiling without dismantling the existing Steel T Bar frames but there is no detail given on how to fix the pvc ceiling on the frames, Please clarify.

Please see the attached drawing.

26‐Dec‐13

P:\01298\127‐01298‐11002\Construction\RFIs\TO#8 ‐ Combined RFI's\RFI Log TO#8 COMBINED.xlsx

X-XX

VARIABLE

200 185 185 185 185 185

VAR

E X

S T

I N

G

D

I M

EXST STEEL T-FRAME

NEW PVC CEILING PANEL

20CM WIDTH AND LENGTH VARIABLE

EXST STEEL T-FRAME

NEW PVC CEILING PANEL

20CM WIDTH AND LENGTH VARIABLE

EXST CLAMP TO BE FOLDED

AND USED TO FIX NEW PVC PANEL

VARIABLE

CUT END PIECE

WITH AMPLE RESTING SPACE

PVC CLG PANEL

PVC CLG PANEL

TYP REFLECTED CEILING PLAN

SCALE: 1:5

T Y

P I C

A L

C

E I L

I N

G

P

A N

O N

N E

C T

I O

N

D

E T

A I L

S

RFI-00002

SECTION 12

SCALE: 1:5

BM BM

TE

TR

A

T

EC

H

/1

4/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

KBD

ES

IG

N

ED

B

Y

D W

N B

Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

DA

TE

AP

R

SY

MB

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(ARSI NEGELE)

A R

S I N

E G

E

LE

H E A

LT

H

C E N

T E R

R E N

O V

A T

IO

N

S

IT

E N

O

T Y

P I C

A

I L

I N

G

D

E T

A I L

S

NOTE:

START WITH FULL PIECE AT ONE END, AND MAKE SURE EACH PANEL IS FIRMLY CONNECTED TO THE NEXT PIECE WITH THE

CORRECT TONGUE AND GROOVE CONNECTION

TYPICAL T& G PANEL CONNECTION DETAIL3

SCALE: 1:2

TK International Building No.2 5th Floor Addis Ababa, TRANSMITTAL

No. 00005

PROJECT: TO-14-00003(TO#8)Arsi Negele Renovat DATE: Thursday, December 26,2013

TO:

ATTN:

USAID/ET

US Embassy Addis Ababa, Roger Sydney

WE ARE SENDING:

0 Shop Drawings

0 Letter

D Prints

D Change Order

D Plans

D Samples

D Specifications

Ig Other: Request for Information

ITEM PACKAGE REV.

RFI

Remarks: RFI, 00002-Fixing the pvc ceiling

CC: IRD Document Control

P.O. Box 6005

REF: Request for Information

SUBMITTED FOR: ACTION TAKEN:

0 Approval 0 Approved as Submitted o Your Use 0 Approved as Noted

D As Requested D Returned After Loan

I ~ Review and Comment D Resubmit

D Submit

SENT VIA: 0 Returned

~ Attached 0 Returned for Corrections

D Separate Cover Via: Mail D Due Date:

COPIES DATE DESCRIPTION STATUS

12/26/2013 Fixing the pvc ceiling OPN

Signed: =t~ G~ Dejan Bratuljevic ,IRD COP www.ird.org Tel.: +251-016-630023

International Relief & Development

TK International Building No.2 5th Floor Addis Ababa

TITLE: Fixing the pvc ceiling

PROJECT: TO-14-00003(TO#8)Arsi Negele Renovat

TO: USAIDIET

ATTN:

Addis Ababa

US Embassy

Roger Sydney

QUESTION:

REQUEST FOR INFORMATION

No. 00002

DATE: Thursday, December 26, 2013

Contract No.: TO#8

The Drawing calls for the provision of PVC ceiling without dismantling the existing Steel T Bar frames but there is no detail given on how to fix the pvc ceiling on the frames, Please clarify.

Signed: _ ...... ~~:;;....._--,.-.. __ ("' 1'SL- Dejan Bratuljevic

P.O. Box 6005 www.ird.org

L-_____________________________________________________ ..

Tel.: +251-0116-630023

TO#8

File details come from the government source that posted it. Updated .