USAID/EHIP
New Health Center Construction Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up
1 Door type D9 on Door Schedule (AR - 019) has size 0.90x2.60 but Door Detail (AR - 017) shows D9 with size 1.20x2.60. Please clarify.
Sheet AR-019 was included in the set of updated sheets for this project issued on May 17, 2013. The list of updated sheets dated May 17, 2013, that the contractor should have is as follows:
C-008; AR-004; AR-005; AR-010; AR-019; AR-020; ST-076. 23-Jan-14
2 Door type D 12 on Door Schedule (AR - 019) has LTZ frame and metal sheet panel material with size 0.90x2.60 but Door Detail (AR - 017) shows D12 with wooden frame and panel material and size 0.80x2.60. Please clarify.
Door type D12 should be a 80cm wide wooden door. See attached revised Sheet AR-019.
23-Jan-14
3 After demolishing the HCB wall on the right side of Registration Block to make opening for W 4A (AR -011), it was observed that the top tie beam is not in safe condition to bear the load and the reinforcement bars are exposed and visible at the bottom part (Drawing is attached). Please clarify.
Change window type at this location to W2A, and install a precast concrete lintel above the window and below the ring beam. Lintel should be 20cm deep, 20cm wide, and extend 40cm both sides of the window for a total of 240cm in length. 23-Jan-14
4 On the response for RFI 00003 No. 5, a revised drawing (AR - 011) was attached showing the wall between W 11 and the existing door removed.
The existing door is KASI but W 11 is LTZ and is not possible to fix the window adjacently with the existing door. TT was on site and has identified this problem as well. Please clarify.
See attached revised Sheets AR-011 and AR-018 for adjusted location and size of windows and grills at Dispensary and Registration.
Sheet AR-018 has also been adjusted for the direction of opening of window types W2, W2A, and W4A. 23-Jan-14
5 The clear height between the FFL and the top tie beam is 2.48m in the Registration Block and 2.46m in the Delivery Block but all the door heights for the two blocks are 2.6m. It impossible to fix the new doors.
Please clarify.
New doors at Registration Block shall have a clear opening height of 2.48m, and new doors at Delivery block shall have a clear opening height of 2.46m per existing top tie beam dimension from FFL.
23-Jan-14
Gimbichu 00005
17-Jan-14
P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED
ROOMNO.
DOOR
TYPE FRAME MATERIAL QTY WIDTH HEIGHT THK GLAZING
SIZE
DOOR SCHEDULE
REMARKS
ROOM
WINDOW
TYPE FRAME MATERIAL QTY WIDTH HEIGHT THK GLAZING
WINDOW SCHEDULE
REMARKSSIZE
SCRUB
TOILET
DELIVERY
LABOR
SLUICE
LABORATORY SAMPLE TOILET
INFECTIOUS DISEASE CLINIC
D14 WOODEN 1 80 260 4 5mm thick clear glass
D14 WOODEN 1 80 260 4
D8 WOODEN 1 120 260 4 5mm thick clear glass
W2 1 80 70 5mm thick frosted glass3.8LTZ
W2A 1 160 70 5mm thick clear glass3.8LTZ
D8 WOODEN 1 120 260 4
D11 LTZ 1 90 260 4
PANEL MATERIAL
WOODEN
WOODEN
WOODEN
SHEET METAL
WOODEN
5mm thick clear glass
5mm thick clear glass
5mm thick clear glass
Open to Inside
Open to Inside
LABORATORY
WAITING D9 LTZ 1 120 260 4SHEET METAL 5mm thick clear glass
W4A 1 308 70 5mm thick clear glass3.8LTZ Open to Inside
D12 WOODEN 1 80 260 4WOODEN 5mm thick clear glass
D11 LTZ 1 90 260 4SHEET METAL 5mm thick clear glass
D8 WOODEN 1 120 260 4WOODEN 5mm thick clear glassPOSTNATAL
EPI+UNDERFIVE D11 LTZ 1 90 260 4SHEET METAL 5mm thick clear glass
3 REGISTRATION ROOM W11 2 120 140 5mm thick clear glass3.8LTZ Open to Inside
D12 WOODEN 1 80 260 4WOODEN 5mm thick clear glassTB CLINC TOILET
4 INFECTIOUS DISEASE TOILET W2 1 80 70 5mm thick clear glass3.8LTZ Open to Inside
5 DISPENSARY W11 1 120 140 5mm thick clear glass3.8LTZ Open to Inside
6 CASHIER W11 1 120 140 5mm thick clear glass3.8LTZ Open to Inside
11 D11 LTZ 1 90 260 4SHEET METAL 5mm thick clear glassANTENATAL
DOOR &WINDOW SCHEDULE
AR-019
D O
O R
W
IN
D
O W
S C
HE
D
UL
E
BM
TE
TR
A
T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(Gimbichu) Site # 208
G
IM
B
IC
H U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
/0
5/
0%
D es ig n
D ev el op m en t D ra w in gs
BM
/2
3/
RF
I-0
RFI-00005, 23 JAN 2014
LABORATORY
ff cement tile to remain 11.82m²
20 275
LABORATORY
ff cement tile to remain 11.82m²
UNDERFIVE OPD
ff cement tile to remain 11.82m²
DISPENSARY
ff cement tile to remain 11.82m²
CASHIER
ff cement tile to remain 11.82m²
ADULT OPD
ff cement tile to remain 11.82m²
EMERGENCY
ff cement tile to remain 11.82m² remove sink remove HWB demolish wall remove window frame and demolish wall for passageremove door and frame remove steps cut wall up to existing halfwall height cut opening for window cut opening for window remove door and window and demolish wall for passage remove door and frame remove sink remove door and frame remove window and frame widen opening
WH
existing downpipe cut opening for window
20 275
HC HEAD
ff cement tile 11.82m²
FINANCE
ff cement tile 11.82m²
DISPENSARY
ff cement tile 11.82m²
REGISTRATION
ff cement tile to remain 18.35m²
TB CLINIC
ff cement tile to remain 11.82m²new HCB infill
X 97.42 new HCB infill
X 96.46 X 97.07
CASHIER
ff cement tile to remain 5.4m²
20 575 15
W12
D12 new HWB
RAMP 8%
RAMP 8%
W4A
W2 new HCB
20135
TOILET
existing tiles 1.8m²
PASSAGE
fill previous opening up 70cm new ceramic threshold
X 97.42 new HCB wall up to same height as existing partial wall
WH
new PVC downpipe new trench,typ.
up up
AR-011 C-003
new PVC downpipe,typ.
AR-011 C-003
D3
AR-011 AR-013
REFER TO C-006
patch cement tile to match existing ff cement tile to remain new cement tile
W12 40 40 100
REGISTRATION BLOCK PLANS:
AR-011
EXISTING CONDITIONS AND DEMOLITION PLAN
R
EG
IS
TR
A
TIO
N B
LO
C
K
PL
A N
S
RENOVATION PLAN
0 5m1 2 3 41
Scale 1:50
BM
TE
TR
A
T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(Gimbichu) Site # 208
G
IM
B
IC
H U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
/0
5/
0%
D es ig n
D ev el op m en t D ra w in gs
BM
ENTRANCE
KINDERGARTEN
NEW SINGLE STORY HOSPITAL PROJECT SITE
(UNDER CONSTRUCTION)
HIGH SCHOOL
ROAD
NOTES:
1. Fill and patch openings from demolished elements,plaster and paint all hcb work to match adjacent existing or new
2. Refinish doors and windows per AR-020
3. Refer to AR-021 FINISHING SCHEDULE
4. Refer to AR-014 Renovation schedule and Civil,Electrical and Sanitary drawings for additional work this block
/2
3/
RF
I-0
RFI-00005, 23 JAN 2014
4 72 4 72 4
20X20X2 SHS
Grill vertical member c/c 16cm welded to horizontal member
20X20X2 SHS
Grill & LTZ window frame connector welded to both
SECTION
15 cm opening for passing money/pharmaceuticals
20X20X2 SHS
Grill horizontal member
WINDOW TYPE SCHEDULE
AND GRILL DETAIL
AR-018
W
IN
D O
W T
YP
E
SC
HE
D
UL
E A
N D
G
RI
LL
D
ET
A
IL
BM
TE
TR
A T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(Gimbichu) Site # 208
G
IM
B
IC
H U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
/0
5/
0%
D es ig n
D ev el op m en t D ra w in gs
BM
-1 0 1 3m
Scale 1:25
1:10
.25 0 .25 0.5 0.75
/2
3/
RF
I-0
RFI-00005, 23 JAN 2014
L/~~
I~ ~ I I I . :
HI..
Intcrrullion.1 Relicfa: Development
1"'~l,l/.J;u.8"tJb«lJro,:JjJ'«1f4
TK International Building No.2 5th Floor Addis Ababa, TRANSMITTAL
No. 00009
PROJECT: TO-14-00003(TO#8)Gimbichu Renovation DATE: Friday, January 17,201 4
TO: USAID/ET
US Embassy Addis Ababa, ATTN: Roger Sydney
WE ARE SENDING:
D Shop Drawings
D Letter
D Prints
D Change Order
D Plans
D Samples
D Specifications
~ Other: Request for Infonnation
ITEM PACKAGE REV.
RFI
Remarks:
CC: IRD Document Control
P.O. Box 6005
REF: Request for Information
SUBMITTED l?OR: ACTION TAKEN:
D Approval 0 Approved as Submitted o Your Use 0 Approved as Noted
D As Requested 0 Returned After Loan
~ Review and Comment D Resubmit
I ~ Submit
SENT VIA: D Returned iii' Attached D Returned for Corrections
D Separate Cover Via: Mail 0 Due Date:
COPIES DATE DESCRIPTION STATUS
1117/2014 Different Issues - 2 NEW
Signed: -=::::==~~~~ ___ _ www.ird.org Tel.: +251-016-630023
International Relief & Development Iml'ftJfJln8 L"''Ct. BlIlltlmg l..i;,JffthooJs
TK International Building No.2
5th Floor
Addis Ababa
TITLE: Different Issues - 2
PROJECT: TO-14-00003(TO#8) Gimbichu Renovation
TO: USAID/ET
Addis Ababa
ATTN: Roger Sydney
QUESTION:
REQUEST FOR INFORMATION
No. 00005
DATE: Friday, January 17, 2014
Contract No.: TO#8
US Embassy
1. Door type D9 on Door Schedule (AR - 019) has size 0.90x2.60 but Door Detail (AR - 017) shows D9 with size 1.20x2.60. Please clarify.
2. Door type D 12 on Door Schedule (AR - 019) has LTZ frame and metal sheet panel material with size 0.90x2.60 but Door Detail (AR - 017) shows D12 with wooden frame and panel material and size 0.80x2.60.
Please clarify.
3. After demolishing the HCB wall on the right side of Registration Block to make opening for W 4A (AR - 011), it was observed that the top tie beam is not in safe condition to bear the load and the reinforcement bars are exposed and visible at the bottom part (Drawing is attached). Please clarify.
4. On the response for RFIO0003 No. 5, a revised drawing (AR - 011) was attached showing the wall between W 11 and the existing door removed. The existing door is KASI but Wll is LTZ and is not possible to fix the window adjacently with the existing door. TT was on site and has identified this problem as well. Please clarify.
5. The clear height between the FFL and the top tie beam is 2.48m in the Registration Block and 2.46m in the Delivery Block but all the door heights for the two blocks are 2.6m. It impossible to fix the new doors. Please clarify.
Requested
Signed: -==~:u.~~::::..---
P.O. Bo)( 6005 www.ird.org Tel. : +25 1·0 116-630023
TO#8
N
1-. --, ),-
\ll q~· - .,.Y
1)1 ~ r- ~V 1'( ~
I
Fa
~ >- ~ )~J @ ~ .l.. A .l.. - '- '-" l....... /: l :.,;
~ I -
I \ ,e. /
C -
~t
1\
I{~ L-.;~@ I
-:o~ f @
I '- ~ C -.., C ( ~ / - ....J
I .
WJ r-
F=
C
File details come from the government source that posted it. Updated .