USAID/EHIP
New Health Center Construction Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow‐up
1 An electric manhole is shown to be placed ri ght in front of OPD Block (EL ‐ 005). This manhole, at the proposed location, is placed at the center of the compound, car parking and junction of the Health Center.
This will cause inconvenience to the Health Center. We request your approval to shift the manhole location at around 7m towards the guard house (please refer to the attached sketch showing our proposal).
Proposal is acceptable. This has no cost implications.
12‐Aug‐14
2 The top slab of the Holding Tank will be 1.40m beIow the NGL. Since the pit created by this is too deep, the Holding Tank needs to be backfilled by soil. This will cause load on the top slab. Will the Holding Tank structural elements withstand the additional load? Please clarify. Please note that the bottom slab has been constructed and masonry wall is in progress.
Keep elevations and use attached drawing.
This has no cost implications.
12‐Aug‐14
31‐Jul‐14Batu 00020
P:\01298\127‐01298‐11002\Construction\RFIs\TO#8 ‐ Combined RFI's\RFI Log TO#8 COMBINED
C-013
C-013
600 800 2600 800 600
330.0000
80 80
HOLDING TANK MANHOLE
HEIGHT=VARIABLE
RC COVER W/Ø8 STEEL
REIN BARS @ 150MM EACH
WAY
20CM THICK HCB W/
MORTAR FILLED CORE
Ø16 STEEL
BAR HANDLE
STONE MASONRY WALL WITH MORTAR
CONNECTION
M
IN
V A
R
40 120 220 120 40
RC TOP SLAB (LID)
FINISHED GRADE/ NGL
FOUNDATION
M
IN
S
L O
P E2
M
IN
S L O
P E
50 50
PVC INLET PIPE
SEAL ALL AROUND
C-013
H O
LD
IN
G T
A N
K P
LA
N
S
EC
TI
O N
UNLESS OTHERWISE NOTED, ALL
DIMENSIONS SHOWN ARE IN CENTIMETERS.
HOLDING TANK
PLAN & SECTION
D B
D B
TE
TR
A T
EC
H
A
PR
IL
U
S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
KMD
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(BATU)
SITE #251
B A
T U
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
D
ES
IG
N
D
EV
EL
O
PM
EN
T D
W G s
/1 4/
0%
D
ES
IG
N
D
EV
EL
O
PM
EN
T D
W G s
/0 5/
HOLDING TANK FOUNDATION REIN PLAN1
SCALE 1:2
HOLDING TANK LID REIN PLAN2
SCALE 1:20
HOLDING TANK SECTION- MASONRY3
SCALE 1:2
RF
I 0
_U
PD
A
TE
D
/0
4/
Pair of 4 x 10 mm square power feeder cable from EEPCO to KWAH A & B inside
50mm rigid PVC conduit
TO#8 Batu site electrical intake manhole relocation proposal
Sketched by : Haile Demessie Electrical Engineer, IRD-Ethiopia, July 2014
Guard House
OPD Block
Delivery Block m m m m
Manhole position on drawing
Manhole proposed new position
KWH-A
KWH-B
31m
4 x 10 mm square feeder cable from EEPCO to KWAH-A inside
50mm rigid PVC conduit
4 x 10 mm square feeder cable from EEPCO to
KWAH-B inside 50mm PVC conduit