About this file

CLIN_-_005_RFI_00003_Various2

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
CLIN_-_003_RFI_00008_GalvStlWaterSvcPiping.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

1 On the response to RFI 00002 Q. 3, AR - 008 was revised showing changes to Nurse Station room. But further revision needs to be done as the actual dimensions do not fit to the revised drawing dimensions.

According to the revised AR - 008 drawing, there is a total of 4.15m from the edge of Delivery Block up to the existing windows of Nurse Station room (0,45m+1.25m+1.30m+0.90m+0.10m+0.15m=4.15m). However, if when adding up the existing dimensions, there is a distance of 3.58m up to the existing windows 2.60m+0.19m+0.79m= 3.58m). This shows that the proposed solution requires 0.17m more space and the existing windows of the Nurse Station room will only have 10cm of existing HeB wall that cannot support itself and that can even be damaged when demolishing the HCB wall to make opening for new door D10. The new 15cm HCB wall to be constructed at the entrance of Nurse Station room will take up a 5cm portion of the existing windows. Please clarify. (Please refer to attached actual dimensions).

Refer to attached revised Sheet AR-008 for revised layout for this area of the Delivery Block based on actual dimensions.

5-Feb-14

2 On the sanitary drawing (SN-0004), the sewage line that goes from Laboratory Block to MH7 has a distance of 7.18m. The existing site condition has a 4.30m of level surface from the block (please refer to attached picture). After that distance, the flat terrain will change and have a steep upwards slope. Please clarify.

PROPOSED SOLUTION

Proposed solution is to change the distance of the sewage line to MH7 from 7.18m to 4.30m.

Solution is acceptable. Refer to attached revised Sheet SN-004.

5-Feb-14

3 The sanitary drawing shows to provide DMH4 at the corner of Laboratory Block (SN - 004). But there is no difference in elevation in that area.

Please clarify.

PROPOSED SOLUTION

Proposed solution is to replace DMH4 with a normal manhole with the same invert elevation (IE = 96.67)

Solution is acceptable. Refer to attached revised Sheet SN-004.

5-Feb-14

4 MH2' has IE = 93.71 where as MH2 has IE = 93.90 even though the direction is from MH2' to MH2 (SN -004). Please clarify.

PROPOSED SOLUTION

Proposed solution is to replace the invert elevations with one another.

Refer to attached revised Sheet SN-004 for revised invert elevations for these manholes.

5-Feb-14

5 MH1 has IE = 89.60 where as DMH1 has IE = 91.27 (SN - 004). But from the given distance of 8.73m and slope 5%, the IE of MH1 will be 90.83 and not 89.60. Please clarify.

Refer to attached revised Sheet SN-004 for revised invert elevations for these locations.

5-Feb-14

Waka 00003 28-Jan-14

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

6 In Delivery Block, all new doors have a height of 2.60m (AR - 008). But the clear height from the floor to the top tie beam is 2.80m. Please clarify.

PROPOSED SOLUTION

Proposed solution is to use either a lintel beam or change the door heights to 2.80m.

Raise door heights at Delivery Block to 2.80m, with no cost implication (See #7). Refer to attached revised Sheet AR-019.

5-Feb-14

7 In Laboratory Block, Registration Block and ART Block, the existing doors to be replaced with new D16 doors (AR - 001, AR - 014 and AR - 017) have a height of2.20m below lintels (please refer to attached picture) but the new D16 doors are to have a height of2.40m. Please clarify.

PROPOSED SOLUTION

Proposed solution is to keep the existing lintels and change the door heights for D 16 doors.

Solution is acceptable to lower door heights for existing doors to be replaced at these blocks to 2.20m to match existing lintel height. This will compensate for raised door heights at Delivery Block. Refer to attached revised Sheet AR-019.

5-Feb-14

8 In Delivery Block in the Nurse Station to be changed to a toilet in Postnatal Room, the wall adjacent to the existing door that remains has a dimension of 0.95cm (please refer to attached picture). The new WC and shower will be in front of the door. Please clarify.

PROPOSED SOLUTION

Proposed solution is to change the position of the newWC and shower.

Refer to attached revised Sheet AR-008 and SN-002 for revised layout for Toilet room based on location of existing fixtures. Note that new water and waste lines are still required for this room.

5-Feb-14

9 Delivery Block renovation plan (AR - 008) and electrical plan (EL - 002) have a different positioning of D14 door from Scrub room to Delivery room. Please clarify.

Refer to attached revised Sheet EL-002 for revised electrical layout for Scrub Room, as well as revised electrical layout for Toilet Room and Nurse Station area per RFI responses.

5-Feb-14

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

TOILET

INJECTION

ROOM

OPD 2/ ER OPD 1

CORRIDOR

ART

DISPENS.

ART

CLINIC

VCT

DATA

CLERK

FEMALE

WARD

NURSE

STATION

MALE

WARD

STO.

STO.

Cement screed f.f.

4m²

Cement screed f.f.

8m²

Cement screed f.f.

13.6m²

Cement screed f.f.

14.75m²

Cement screed f.f. 4.4m²

Cement screed f.f.

8.54m²

Cement screed f.f.

6.75m²

Cement screed f.f.

5.85m²

Cement screed f.f.

19.14m²

Cement screed f.f.

6m²

Cement screed f.f.

28.42m²

Cement screed f.f.

4.30m²

Cement screed f.f.

3m²Cement screed f.f.

12m²

WH

Remove LTZ door

Remove LTZ door

Remove LTZ door

Remove LTZ door

Demolish laundry basin

Remove LTZ door

Cut opening for door

20 215 20 340 20 390 20 240 20 120 20 225 20 330 20 200 20 490 20130 20

Remove

HCB

wall

Water heater to be salvaged

Remove kitchen sink

Remove

HWB

Remove LTZ window

Remove LTZ window

215 20 120 467 120

20 240 20 120 20

20 330 20 200 20 490 20 130 20

Remove LTZ window & wall for top window construction

Remove LTZ window & wall for top window construction

Remove

HCB

wall

Remove LTZ door to be reinstalled

90 89

TOILET

LABOUR

ROOM

POSTNATAL DELIVERY

CORRIDOR

SLUICE

ROOM

SCRUB

ROOM

MINOR

OPERATION

ROOM

FEMALE/

PEDIATRICS

WARD

NURSE

STATION

ANC

New ceramic tile f.f. 5m²

New PVC tile f.f.

7m²

PVC tile f.f 13.6m²

New Polyurethane cement floor system 14.75m²

New Polyurethane cement floor system 4.4m²

New Polyurethane cement floor system 4.22m²

New Polyurethane cement floor system 21.2m²

New PVC tile f.f.

11.97m²

New PVC tile f.f. 6m²

New PVC tile f.f.

17.5m²

Cement screed f.f.

3m²New Polyurethane cement floor system 16.2m²

VERENDAH

New ceramic tile f.f.

58m²

WH

STORE

New ceramic tile f.f.

4.3m²

TOILET

AR-008 AR-009

D

AR-008 AR-009

EEPI

New PVC tile f.f.

6.66m²

MALE

WARD

New PVC tile f.f.

10.19m²

WH

New D14

New D14

New D14 New D14

New D12

New D8 New D12

New shower

New D13

New D8

AR-008 AR-013

D2

20 80 191 130 226 270 188 80 148 270 122

AR-008 AR-012

D1

365 200

130 24

New W7 New W7

New sluice sink

New scrub sink

80 42 80 153 80 242 80 42 80 171 45 80

2021520

New 80lt

WH

Ceramic threshold

New W2A

New W2A 160 81 200 223 160 172 80 452048059170

New D10

490 20 130 New

HCB

wall

New HCB wall

New D9

New D8

New D10

New

HWB

New WC

New

HWB

New shower

New

HWB

New

WC

New

WH

New D10

New D10

110 90

New

WH

DELIVERY BLOCK PLANS

0 5m1 2 3 41

Scale 1:50

DE

LI

VE

RY

B

LO

C K

PL

A

N S

DELIVERY BLOCK DEMOLITION PLAN

AR-008

DELIVERY BLOCK RENOVATION PLAN

UNLESS OTHERWISE NOTED, ALL

DIMENSIONS SHOWN ARE CENTIMETERS.

M M

M M

TE

TR

A T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

KM

D

ES

IG

N

ED

B

Y

D R A

W N

B Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

D A

TE

A

PR

SY

M B

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(WAKA)

SITE # 213

W A

K A

H

EA

LT

H

C

EN

TE

R

R

EN

O V

A

TI

O N

S

IT

E N

O

D

ES

C

RI

PT

IO

N

D es ig n d ra w in gs

/1 4/

/0

5/

0%

D es ig n d ra w in gs

NOTES:

1. Fill and patch all openings from demolished elements.

Plaster and paint all HCB work to match adjacent existing or new.

2. Refinish existing doors and windows per AR-022.

3. Refer to AR-024 finishing schedule.

4. Refer to AR-010 & AR-011 renovation schedule and

Civil, Architectural, Electrical, and Sanitary for additional work in this block.

/0

5/

RF

I 0

DOOR TYPE SCHEDULE

D O

O R

T Y

P E S

C H

E D

U

LE

AR-019

M M

M M

TE

TR

A T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

KM

D

ES

IG

N

ED

B

Y

D R A

W N

B Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

D A

TE

A

PR

SY

M B

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(WAKA)

SITE # 213

W A

K A

H

EA

LT

H

C

EN

TE

R

R

EN

O V

A

TI

O N

S

IT

E N

O

D

ES

C

RI

PT

IO

N

D es ig n d ra w in gs

/1 4/

/0

5/

0%

D es ig n d ra w in gs

-1 0 1 3m

Scale 1:25

/0

5/

RF

I 0

SN-002

DE

LI

VE

RY

B

LO

C K

TO

IL

ET

S

SN

P

LA

N

R

IS

ER

D

IA

G

RA

M

DELIVERY BLOCK TOILETS

SN PLAN & RISER DIAGRAM

DELIVERY BLOCK POSTNATAL TOILET SN PLAN

Scale 1:20

FEMALE/ PEDIATRIC WARD SN PLAN

Scale 1:20

M M

M M

TE

TR

A T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

KM

D

ES

IG

N

ED

B

Y

D R A

W N

B Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

D A

TE

A

PR

SY

M B

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(WAKA)

SITE # 213

W A

K A

H

EA

LT

H

C

EN

TE

R

R

EN

O V

A

TI

O N

S

IT

E N

O

D

ES

C

RI

PT

IO

N

D es ig n d ra w in gs

/1 4/

/0

5/

0%

D es ig n d ra w in gs

UNO, ALL DIMENSIONS ARE

IN MM AND ELEVATIONS ARE IN M

/0

5/

RF

I 0

SN-004

S

IT

E U

T

IL

IT

IE

S P

LA

N

SITE UTILITIES PLAN

-5m 0 10m

Scale 1:150

20m

NOTE:

1.Top elevation of sewer manholes shall be set by Contractor minimum 6cm above finished grade.

2. Finished grade over installed pipelines shall provide minimum 40 cm cover of suitable soil.

3. Shutoff valves shall be placed within 1m of all service points.

5. All water services shall be minimum Ø25mm PVC with shutoff valves & transition to interior pipe sizes shown on plumbing drawing.

6. Provide new water distribution and waste water lines as shown.

7. Refer to civil drawings for site utility details.

8. Provide new septic tank and percolation trench as shown.

M M

M M

TE

TR

A T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

KM

D

ES

IG

N

ED

B

Y

D R A

W N

B Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

D A

TE

A

PR

SY

M B

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(WAKA)

SITE # 213

W A

K A

H

EA

LT

H

C

EN

TE

R

R

EN

O V

A

TI

O N

S

IT

E N

O

D

ES

C

RI

PT

IO

N

D es ig n d ra w in gs

/1 4/

/0

5/

0%

D es ig n d ra w in gs

UNO, ALL DIMENSIONS ARE

IN MM AND ELEVATIONS ARE IN M

/0

5/

RF

I 0

TOILET

LABOUR

ROOM

POSTNATAL DELIVERY

CORRIDOR

SLUICE

ROOM

SCRUB

ROOM

MINOR

OPERATION

ROOM

FEMALE/

PEDIATRICS

WARD

NURSE

STATIONANC

VERENDAH

WH

STO. 2

TOILET

EPI

MALE

WARD

LPP-A

MDB

Socket Line to Staff House

Socket Line to Cafeteria

DELIVERY BLOCK SOCKET LAYOUT

WH

TOILET

LABOUR

ROOM

POSTNATAL DELIVERY

CORRIDOR

SLUICE

ROOM

SCRUB

ROOM

MINOR

OPERATION

ROOM

FEMALE/

PEDIATRICS

WARD

NURSE

STATION

ANC

VERENDAH

WH

STO. 2

TOILET

EPI

MALE

WARD

4.1

4.1

4 4

2 2

4.1

2 2 2 2 2 2

LPP-A

MDB

Lighting Line to Pit Latrine, Shower Gen. House & Cafeteria

Lighting Line to Staff House

DELIVERY BLOCK LIGHTING LAYOUT

WH

EL-002

D

EL

IV

ER

Y B

LO

C

K E

LE

C

TR

IC

A L

P

LA

N

DELIVERY BLOCK ELECTRICAL PLAN

BT BT

TE

TR

A

T

EC

H

/0

5/

U S A

ID

E

TH

IO

P

IA

H

EA

LT

H

IN

FR

A S

TR

U C

TU

R E

P R O

G R A

M

KM

D

ES

IG

N

ED

B

Y

D R A

W N

B Y

C H

K B

Y

D A

TE

S U

B M

IT

TE

D B

Y

D A

TE

A

PR

SY

M B

NOTE: A3 SIZE REDUCED TO HALF SCALE

RENOVATION

(WAKA)

SITE # 213

W A

K A

H

EA

LT

H

C

EN

TE

R

R

EN

O V

A

TI

O N

S

IT

E N

O

D

ES

C

RI

PT

IO

N

D

ES

IG

N

D

EV

EL

O

PM

EN

T D

W G s

/1 4/

/0

5/

0%

D

ES

IG

N

D

EV

EL

O

PM

EN

T D

W G s

0 5m1 2 3 41

Scale 1:50

R

FI

(nl.malionol Reli.fli< Development Jl!lff(J'iif".f[j;'O.JJJIIldi'\~I.hodil.'<J(/{k

TK International Building No.2 5th Floor Addis Ababa, TRANSMITTAL

No. 00005

PROJECT: TO-14-00003(TO#8)Waka Renovation DATE: Tuesday, January 28,2014

TO: USAIDIET

US Embassy Addis Ababa, ATTN: Roger Sydney

WE ARE SENDING:

0 Shop Drawings

0 Letter

0 Prints

0 ChaDl~e Order

0 Plans

0 Samples

0 Specifications

!if Other: Request for Information

ITEM PACKAGE REV.

RFI

Remarks:

ec: IRD Document Control

P.O. Box 6005

REF: Request for Information

SUBMITTED FOR: .. ACTION TAKEN:

0 Approval 0 Approved as Submitted o YourUse 0 AJl1lI"oved as Noted o As Requested 0 Returned After Loan

II!!r Review and Comment 0 Resubmit

!if Submit

SENt VIA: ,:i, , , 0 Returned

,tiJ' Attached 0 Returned for Corrections o S~arate Cover Via: Mail 0 Due Date:

eopu~s DATE DESCRIPTION STATUS

1128/2014 Different Issues - 2 OPN

Signed: ......;===~~~=:::: __ _ www.ird.org Tel.: +251"()16·630023

International Relief & Development Impnm;1I8 Ln't:s. Bnlll/ing Livelih110ds.

TK International Building No.2 5th Floor

REQUEST FOR INFORMATION

No. 00003

Addis Ababa

TITLE: Different Issues - 2

PROJECT: TO-14-00003(TO#8) Waka Renovation

TO: USAID/ET

Addis Ababa

ATTN: Roger Sydney

QUESTION:

DATE: Tuesday, January 28, 2014

Contract No.: TO#8

US Embassy

TO#8

1. On the response to RFI 00002 Q. 3, AR - 008 was revised showing changes to Nurse Station room. But further revision needs to be done as the actual dimensions do not fit to the revised drawing dimensions. According to the revised AR - 008 drawing, there is a total of 4.15m from the edge of Delivery Block up to the existing windows of Nurse Station room (0,45m+1.25m+1.30m+0.90m+0.10m+0.15m=4.15m). However, if when adding up the existing dimensions, there is a distance of 3.58m up to the existing windows (2.60m+0.19m+0.79m=3.58m). This shows that the proposed solution requires 0.17m more space and the existing windows of the Nurse Station room will only have 10cm of existing HeB wall that cannot support itself and that can even be damaged when demolishing the HeB wall to make opening for new door D10. The new 15cm HeB wall to be constructed at the entrance of Nurse Station room will take up a 5cm portion of the existing windows. Please clarify. (Please refer to attached actual dimensions).

2. On the sanitary drawing (SN-0004), the sewage line that goes from Laboratory Block to MH7 has a distance of 7.18m. The existing site condition has a 4.30m of level surface from the block (please refer to attached picture). After that distance, the flat terrain will change and have a steep upwards slope. Please clarify.

3. The sanitary drawing shows to provide DMH4 at the corner of Laboratory Block (SN - 004). But there is no difference in elevation in that area. Please clarify.

4. MH2' has IE = 93.71 where as MH2 has IE = 93.90 even though the direction is from MH2' to MH2 (SN - 004). Please clarify.

5. MH1 has IE = 89.60 where as DMH1 has IE = 91.27 (SN - 004). But from the given distance of 8.73m and slope 5%, the IE ofMHl will be 90.83 and not 89.60. Please clarify.

6. In Delivery Block, all new doors have a height of 2.60m (AR - 008). But the clear height from the floor to the top tie beam is 2.80m. Please clarify.

7. In Laboratory Block, Registration Block and ART Block, the existing doors to be replaced with new D16 doors (AR - 001, AR - 014 and AR - 017) have a height of2.20m below lintels (please refer to attached picture) but the new D16 doors are to have a height of2.40m. Please clarify.

P.O. Box 6005 www.ird.org Tel.: +251-0116-630023

The new proposed solution

The Existing Doors and HCB walls with dimensions measured on site.

1.23m

1.25m

0.79m

1.22m

1.25m

1.86m

Existing terrain behind Laboratory Block

This is 7.18m distance from the

Laboratory block where the proposed sewer lines pass

This is 4.30m distance from the

Laboratory block slope begins

2.17

0.95

0.80

0.25

Toilet room to

Postnatal side