About this file

CLIN_-_003_RFI_00005_-_EpoxyFlrFin

View the file

Other files

File Type Posted
CLIN_-_005_RFI_00002-ElecCondClr.pdf PDF
Attachment_7.5_-_CLIN-005_Waka_BOQ.pdf PDF
Attachment_1.4_-_CLIN-004_Gimbichu_Design_Drawings.pdf PDF
Attachment_1.1_-_CLIN-001_Arsi_Negelle_Design_Drawings.pdf PDF
CLIN_-_003_RFI_00021-PitLatSink.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_001_RFI_00002_fixing_PVCCeiling.pdf PDF
CLIN_-_003_RFI_00016-ExtPVLight.pdf PDF
Attachment_3.1-_CLIN-002_Batu_General_Punch_List.xlsx XLSX spreadsheet
Attachment_3.2_-_CLIN-002_Batu_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_4.1_-_CLIN-003_Durame_General_Punch_List.xlsx XLSX spreadsheet
Attachment_7.4_-_CLIN-004_Gimbichu_BOQ.pdf PDF
Attachment_1.4.a_-_CLIN-004_Gimbichu_Soak_Away_Pit_Drawing_Details.pdf PDF
CLIN_-_003_RFI_00001-Various.pdf PDF
CLIN_-_004_RFI_00021_-FlexibleConduits.pdf PDF
CLIN_-_005_RFI_00023-ExtPVLight.pdf PDF
Attachment_6.2_-_CLIN-005_Waka_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_7.3_-_CLIN-003_Durame_BOQ.pdf PDF
CLIN_-_003_RFI_00090-AntirustElectrode.pdf PDF
Attachment_1.5_-_CLIN-005_Waka_Design_Drawings.pdf PDF
CLIN_-_003_RFI-00011-WaterSupplyLines.pdf PDF
CLIN_-_005_RFI_00003_Various2.pdf PDF
CLIN_-_002_RFI_00023-ExtPVLight.pdf PDF
SOL-663-15-000028.pdf PDF
Attachment_2.2_-_CLIN-001_Arsi_Negele_Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_5.2_-CLIN-004_Gimbichu__Electrical_Punch_List.xlsx XLSX spreadsheet
Attachment_1.3_-_CLIN-003_Durame_Design_Drawings.pdf PDF
CLIN_-_005_RFI_00014_SiteElectrical.pdf PDF
CLIN_-_004_RFI-00009_Various.pdf PDF
Attachment_7.2_-_CLIN-002_Batu_BOQ.pdf PDF
CLIN_-_003_RFI_00009-SanitaryManholes.pdf PDF
Attachment_4.2_-_CLIN-003_Durame_Electrical_Punch_List.xlsx XLSX spreadsheet
CLIN_-_002_RFI__00020_ElectricManhole-HoldingTank.pdf PDF
CLIN_-_002_RFI_00007_WtrSuppLinesDelivBlock.pdf PDF
CLIN_-_004_RFI_00011_-_EpoxyFlrFin.pdf PDF
Attachment_7.1_-_CLIN-001_Arsi_Negele_BOQ.pdf PDF
CLIN_-_001_RFI_00007-GalvStlWaterSvcPiping.pdf PDF
Attachment_1.2_-_CLIN-002_Batu_Design_Drawings.pdf PDF
CLIN_-_001_RFI-00011-PumpPowerSupply.pdf PDF
CLIN_-_004_RFI_00008-ElecCondClr.pdf PDF
Attachment_1.0_-_Final_Spec_Health_Centers_Renovation.pdf PDF
CLIN_-_003_RFI_00006-IDStair.pdf PDF
CLIN_-_004_RFI_00026-PitLatrineFFL.pdf PDF
CLIN_-_004_RFI_00005_Various.pdf PDF
CLIN_-_002_RFI_00022_-_FlexibleConduits.pdf PDF
CLIN_-_004_RFI_00022-ExtPVLight.pdf PDF
Attachment_6.1_-_CLIN-005_Waka_General_Punch_List.xlsx XLSX spreadsheet
CLIN_-_001_RFI_00008-WallCerTile.pdf PDF
CLIN_-_004_RFI_00029-WaterSupplyLines.pdf PDF
CLIN_-_003_RFI_00019-PitLatHPL.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAID/EHIP

New Health Center Construction Task Order 8, Combined RFI Log

Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290

RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up

Durame 00005 Gimbichu 00011

Waka 00007 Batu 00009

Arsi Negele 00007 Meki 00007

17-Mar-14 1 The drawing ca1ls for the use of polyurethane floor finish. As stated under the technical specifications (Section 09610) the materials to be used for this floor finish are Sikafloor-Purcem 2IN and Sikafloor-Purcem 29N. Since these products are not currently available in the market, we request your approval to use 2mm thick self- Ieveling Epoxy Floor Finish over 48mm thick cement screed strengthened with additive as approved for TO#5 renovation sites.

Product submittals should be addressed and documented for separate Task Orders through the Submittal Process.

18-Mar-14

P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED

International Relief & Development

TK International Building NO.2 5th Floor Addis Ababa, TRANSMITTAL

No. 00027

PROJECT: TO-14-00003 (TO#8) HC Renovations DATE: Monday, March 17, 2014

TO: USAIDIET

US Embassy Addis Ababa, ATTN: Roger Sydney

WE ARE SENDING:

D Shop Drawings

D Letter

D Prints

D Change Order

D Plans

D Samples

D Specifications

Irtr Other: Request for Information

ITEM PACKAGE REV.

RFI

Remarks:

CC: IRD Document Control

P.O. Box 6005

REF: Request for Information

SUBMITTED FOR: ACTION TAKEN:

D Approval D Approved as Submitted

D YourUse D Approved as Noted

D As Requested D Retumed After Loan l!ir Review and Comment D Resubmit li'J Submit

SENTVIA: D Retumed

IIir Attached D Retumed for Corrections

D Separate Cover Via: Mail D Due Date:

COPIES DATE DESCRIPTION STATUS

3/17/2014 Polyurethane Floor Finish OPN

Signed: -===~~~===-__ www.ird.org Tel.: +251-016-630023

International Relief lk Development Imprc1'{)ins LhlCS, Blfiltling LiveJihoods.

TK International Building NO.2

5th Floor AddisAbaba

TITLE: Polyurethane Floor Finish

PROJECT: TO-14-00003 (TO#8) Renovations

TO: USAID/ET

Addis Ababa

ATTN: Roger Sydney

QUESTION:

REQUEST FOR INFORMA TION

ARSI NEGELLE No. 00007

BATU No. 00009

GIMBICHU No. 00011

DURAME No. 00005

MEKI No. 00007

WAKANo.00010

DATE: Monday, March 17, 2014

Contract No.: TO#8

US Embassy

T #8

The drawing ca1ls for the use of polyurethane floor finish. As stated under the technieal specifications (Section 09610) the materials to be used for this floor finish are Sikafloor-Purcem 2IN and Sikafloor-Purcem 29N. Since these products are not currently available in the market, we request your approval to use 2mm thick self-Ieveling Epoxy Floor Finish over 48mm thick eement screed strengthened with additive as approved for TO#5 renovation sites.

Note: IRD has not assessed the full impact of this issue in terms of additional cost and extension of time. IRD reserves the right to submit a c1aim as provided in Contract Section I.

Signed: -=~:::!!~~~::::..... ___ _