USAID/EHIP
New Health Center Construction Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up
1 In ART Block Laundry room, the drawing calls for a laundry tub to be fixed on a metal stand (AR - 004). However, there is no sectional view or detail given about this laundry tub. Please clarify.
Please see attached revised sheet AR-005 for laundry trough and metal stand details. Fix laundry trough to metal stand securely. Dimensions may vary according to dimension of laundry trough available on the market.
Submit for approval through the submittal process.
2 In the Delivery room of Delivery Block, detail D5 (AR-011) calls for the use of magnesium board on existing concrete wall element. The existing ceramic wall tile on the same wall is to remain as per Engineer's answer to RFI 00008. The location shown in the plan is at a short space of the wall (please refer to attached picture showing existing location in the room). We reguest your approval to omit the use of the magnesium board.
Proposal is acceptable. Install new ceramic tiles at referenced portion of the wall to match existing. Note comments from RFI-00008 response, attached.
29-May-14
Arsi Negele 00010
22-May-14
P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED
WH
TOILET
ceramic tiles (5.70m²)
B A
D2
15 233 15 salvaged 50 litre water heater
Ø32x60mm stainless steel grab bar
1% slo pe
30 30 new HWB new wall infill ceramic threshold new toilet new shower
Ø32x60mm stainless steel grab bar
±0.00
+0.80
+1.70
150x150x10mm ceramic tiles 40mm thick cement screed existing concrete sub floor
±0.00
+1.00
+1.70
Existing metal T-frame new PVC panel ceiling
50 litre water heater reinstalled
Existing metal T-frame new PVC panel ceiling
+2.50
+2.80 +2.80
15x15x1cm ceramic tiles
15x15x1cm ceramic tiles
Ø32x60mm stainless steel grab bar
+0.80+0.80
+0.60
150x150x10mm ceramic tiles 40mm thick cement screed existing concrete sub floor
+2.50
+1.00
+0.80
Synthetic paint
Synthetic paint fiberglass trough
40x40x2mm RHS frame fiberglass trough
40x40x2mm RHS frame
4 64 4 64 4
PLAN VIEW
FRONT
VIEW
SIDE VIEW
fiberglass trough
40x40x2mm RHS frame
4 72 4 BM BM
TE
TR
A
T
EC
H
/0
5/
U S A
ID
E
TH
IO
P
IA
H
EA
LT
H
IN
FR
A S
TR
U C
TU
R E
P R O
G R A
M
G S
D
ES
IG
N
ED
B
Y
D W
N B
Y
C H
K B
Y
D A
TE
S U
B M
IT
TE
D B
Y
DA
TE
AP
R
SY
MB
NOTE: A3 SIZE REDUCED TO HALF SCALE
RENOVATION
(ARSI NEGELE)
SITE # 277
A R
S I N
E G
E
LE
H E A
LT
H
C E N
T E R
R E N
O V
A T
IO
N
S
IT
E N
O
D e s i g n
D r a w i n g s
NEW INPATIENT TOILET DETAIL
AR-005
N
EW
IN
PA
TIE
N
T
TO
IL
ET
D
ET
A
IL
-0.5 0 0.5 1.5 2m1
Scale 1:20
INTERNAL ELEVATION BINTERNAL ELEVATION A
TOILET PLAN
SCALE 1:25
D2
AR-005 AR-004
UNLESS OTHERWISE NOTED,
ALL DIMENSIONS SHOWN ARE IN CENTIMETERS.
LAUNDRY TROUGH DETAIL
/2
9/
RF
I-0
USAID/EHIP
New Health Center Construction Task Order 8, Combined RFI Log
Durame Site 202 Batu Site 251 Gimbichu Site 208 Arsi Negele Site 277 Waka Site 213 Meki Site 290
RFI No. Date Rec'd Item No. Question TT Response Response Date Follow-up
Arsi Negele 00008 23-Apr-14 1 In Delivery Block, the existing ceramic wall tiles in minor operation room (former EPl) and delivery room are to be demolished and to be finished with acrylic emulsion paint (AR - 003 / AR - 018). However, the existing ceramic wall tiles are in good condition (please refer to attached pictures) and the Health Center does not want the ceramic tiles to be demolished. Please clarify.
PROPOSED SOLUTION:.
Proposed solution is to let the ceramic wall tiles to remain and apply acrylic emulsion paint above. In delivery room since the wall is to be demolished, the ceramic wall tiles will be carefully removed and be applied on the new HCB wall.
Proposal is acceptable.
Reseal existing ceramic tile wall finish to remain.
Take care to protect existing ceramic tile wall finish to remain during paint application.
If existing ceramic wall tiles are not carefully removed or are damaged during removal, provide new ceramic wall tiles to match existing.
29-Apr-14
P:\01298\127-01298-11002\Construction\RFIs\TO#8 - Combined RFI's\RFI Log TO#8 COMBINED
I_·~' ~ .~. -
Internatiollal Reli.f" Development
TK International Bulding NO.2 5th floor Addis Ababa, TRANSMITTAL
No. 00034
PROJECT: TO-14-00003(TO#8)Arsi Negele Renovat DATE: Wednesday, Apri123, 2014
TO: USAID/ET
US Embassy Addis Ababa, ATTN: Roger Sydney
WE ARE S~NDING:
D Sbop Drawings
D Letter
D Prints
D Cbange Order
D Plans
D Samules
D SllCcifications
1!iI' Other: Request for Information
ITEM PACKAGE REV.
RFI
Remarks:
CC: IRD Document Control
P.O. Box 6005
REF: Request for Information
. SUBMITTED FOR: ACTION TAKEN:
D Approval D Approved as Submitted
D YourUse D AYl'I"oved as Noted
D As Requested D Retumed After Loan
!il Review and Comment D Resubmit
[[il" Submit
SENTVIA: D Returned
!iI: Attached D Retumed for Corrections
D Separate Cover Via: Mail D Due Dale:
COPIES DATE DESCRIPTION
4/23/2014 eeramic Wall THe
STATUS
OPN
wwwjrd.org Tel.: +251-016-630023
~ I~ International Relief & Development
Impllming Li'l,'l~. Building, Lmtlih()(lds.
TK International Building NO.2 5th floor Addis Ababa
TITLE: Ceramic Wall THe
PROJECT: TO-14-00003(TO#8) Arsi Negelle Renovation
TO: USAID/ET
Addis Ababa
ATTN: Roger Sydney
QUESTION:
REQUEST FOR INFORMATION
No. 00008
DATE: Wednesday, April23, 2014
Contract No.: TO#8
US Embassy
In Delivery Block, the existing ceramic wall tiles in minor operation room (former EPl) and delivery room are to be demolished and to be finished with acrylic emulsion paint (AR - 003 / AR - 018). However, the existing ceramic wall tiles are in good condition .(please refer to attached pictures) and the Health Center does not want the ceramic tiles to be demolished. Please clarify.
Note: IRD has not assessed the full impact of this issue in terms of additional cost and extension of time. IRD reserves the right to submit a claim as provided in Contract Section I.
PROPOSEDSOLUTION:.
Proposed solution is to let the ceramic wall tiles to remain and apply acrylic emulsion paint aboveo In delivery room since the wall is to be demolished, the ceramic wall tiles will be carefully removed and be applied on the new HCB wall.
Requested y: International Relief and Development
P.O. Box 6005 www.ird.org Tel.: +251-0116-630023
TO#8
File details come from the government source that posted it. Updated .