This is a pavement layout plan for the Portland International Airport North Runway Rehabilitation project in Oregon, specifically detailing the runway 10L-28R section from station 264+50 to station 271+00. The project involves the rehabilitation of airfield pavement with multiple asphalt sections of varying nominal depths: 16 inches, 9 inches, 4 inches, and 2 inches, as well as full-depth 4-inch shoulder asphalt concrete pavement (ACP). The technical drawing, prepared by HNTB Corporation and stamped by registered professional engineer Garrett P. Stevens (Oregon License 89696PE), includes detailed pavement geometry, FAA and airfield electrical light beam foundation locations, existing electrical vault and pad protection requirements, and transition details to existing pavement. The plan references multiple cross-referenced sheets including alignment geometry plans (C1.01-C1.11), elevation plans (C7.01-C7.35), storm drain and underdrain plans (C9.01-C9.04), airfield electrical geometry plans (E3.01-E3.12), and electrical lighting plans (E4.01-E4.12). The drawing is scaled at 1 inch equals 30 feet and was prepared in October 2026.

The document establishes the technical specifications and spatial requirements for pavement installation, noting that some FAA and electrical light beam foundation work will be completed prior to asphalt paving while other locations will be finished after paving completion. Key considerations include protection of existing signs, foundations, fixtures, and electrical vaults designated to remain throughout construction, as well as coordination with adjacent taxiway A5. The plan indicates that new pavement geometry specifications are designed to interface properly with existing pavement to remain, requiring careful attention to transition details and inlay specifications documented in referenced detail sheets.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M W

V co co co co co co

264+95.93

264.18' RT

265+46.69

271.00' RT

267+09.53

271.00' RT

267+76.55

266.81' RT

267+40.00

75.00' RT

264+80.77

271.00' RT

265+16.41

271.00' RT

267+58.44

139.75' RT

267+03.76

115.37' RT

265+36.00

242.33' RT

267+01.90

139.50' RT

267+07.67

110.81' RT

267+14.45

131.48' RT

267+62.87

240.11' RT

267+05.08

310.34' RT

267+55.99

271.00' RT

267+28.74

287.20' RT

267+01.59

305.46' RT

267+31.94

292.27' RT

5+

0+

V

269+75.01

30.00' RT

269+75.01

75.00' RT

N LEGEND:

M

AT

C H

LI

N

E

ST

A

1+

.0 0, S

EE

S H

EE

T

C 4.

M

AT

C H

LI

N

E

ST

A

4+

.0 0, S

EE

S H

EE

T

C 4.

PORTLAND OFFICE

5500 MEADOWS RD., #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

503.639.2710 FAX

S EPT EMBER 0 8 , 2

0 20

GARRETT P. STEVENS

EXP: 06/30/28

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

89696PE

SCALE:

RUNWAY 10L-28R STA 264+50 TO STA 271+00

1" = 30'1

NOTES:

1. PAVEMENT LAYOUT BASED ON 10L-28R CENTERLINE ALIGNMENT. SEE

SHEETS C1.01 THROUGH C1.11 FOR ALIGNMENT GEOMETRY AND PAVING

LIMITS.

2. FOR NEW PAVEMENT GEOMETRY ABUTTING EXISTING PAVEMENT TO REMAIN,

SEE GEOMETRY PLANS C1.01 THROUGH C1.11.

3. SEE SHEETS C7.01 THROUGH C7.35 FOR PAVING ELEVATION PLANS.

4. SEE SHEETS C9.01 THROUGH C9.04 FOR STORM DRAIN AND UNDERDRAIN

PLANS.

5. SEE SHEETS E3.01 THROUGH E3.12 FOR AIRFIELD ELECTRICAL GEOMETRY

PLANS.

6. LOCATIONS SHOWN REPRESENT FAA AND AIRFIELD ELECTRICAL LIGHT BEAM

FOUNDATIONS. SOME FOUNDATIONS WILL BE COMPLETED AFTER THE

COMPLETION OF THE ASPHALT PAVING, WHILE OTHER LOCATIONS WILL BE

COMPLETED PRIOR TO THE COMPLETION OF ASPHALT PAVING. REFER TO

EXHIBIT C (FAA PLANS) AND ELECTRICAL LIGHTING PLANS (E4.01 TO E4.12)

FOR DETAILS.

RUNWAY 10L-28R

10/6/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

2:36:15 PM GSTEVENS c:\users\gstevens\dc\accdocs\hntb corporation\88598 - pdx north runway rehab\project files\shared cad\sheets - civil\pavement layout plans.dwg

DISC. SHT. NO.

DRAWING SCALE IS RED8&ED �0� WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

PAVEMENT LAYOUT PLAN

RUNWAY 10L-28R STA 264+50 TO STA 271+00

GENE TUPPER

G. STEVENS

C.AASLAND

B. FOSTER

OCTOBER 2026

40 CD

PDX 2026-501 C4.092024D011 102981

KEY PLAN

SCALE : N.T.S.

N

16" NOMINAL ASPHALT PAVEMENT

SECTION, SEE DETAIL

9" NOMINAL ASPHALT PAVEMENT

SECTION, SEE DETAIL

4" NOMINAL ASPHALT PAVEMENT

SECTION, SEE DETAIL

2" NOMINAL ASPHALT PAVEMENT

SECTION, SEE DETAIL

FULL DEPTH 4" SHOULDER ACP

SECTION, SEE DETAIL

FAA AND AIRFIELD ELECTRICAL

FOUNDATIONS, SEE NOTE 6

C4.20

C4.20

C4.20

C4.20

C4.20

SCALE: IN FEET

60'30'0' 15' 90'

TAXIWAY A5

KEY NOTES:

EXISTING ELECTRICAL VAULT AND PAD ADJACENT TO RUNWAY

SHOULDER. SEE SHEETS E4.01 THROUGH E4.12 FOR

ELECTRICAL LIGHTING SHEETS.

PROTECT EXISTING SIGNS, FOUNDATIONS, AND FIXTURES TO

REMAIN PRIOR TO PAVEMENT INSTALLATION. SEE THE AIRFIELD

ELECTRICAL PLANS FOR FIXTURES TO REMAIN

2" INLAY TRANSITION TO EXISTING PAVEMENT. SEE DETAIL

C4.22

C4.25

C4.20

AutoCAD SHX Text 777 108th Avenue NE, Suite 1000 Bellevue, WA 98004 Tel (425) 455-3555 Fax (425) 453-9179 www.hntb.com

AutoCAD SHX Text

HNTB CORPORATION

Sheets and Views
PAVE. LAYOUT PLAN 9 (30SC)
2026-10-06T16:19:18-0700
DIGITALLY SIGNED
Garrett P Stevens

File details come from the government source that posted it. Updated .