About this file

This electrical detail drawing is part of the Portland International Airport North Runway Rehabilitation project in Oregon. The document specifies technical requirements for the installation of in-pavement lighting fixtures, including base can assemblies, flange rings, extensions, and conduit systems. The design outlines two primary base can types (L-867 and L-868) with varying diameter specifications ranging from 12 to 16 inches, along with detailed installation procedures for fixture mounting, reinforcing bar cage configurations, and sealant application. The drawing establishes mandatory specifications for stainless steel hardware, including 3/8" by 16 Type 304 hex cap bolts with anti-vibration washers and torqued to manufacturer recommendations. The document includes a reference table for 5KV connector kit capacity limits based on junction can volumes, restricting the maximum number of kits per single base can without express approval from the Port.

The technical specifications require contractors to provide shims at their own expense to meet final grade requirements, with a maximum of three shims permitted per installation. Conduit installation must extend 2 inches into the can after backfill and stabilization, with grommets furnished by the base can supplier. The drawing was prepared by Gene Tupper and M. Tieaskie, checked by M. Dettmer, and approved by J. Nelson, a registered professional engineer in Oregon. The document is dated October 2026 and carries design number 102981 and drawing number PDX 2026-501 E5.04, with a professional engineer stamp expiring December 31, 2026.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
PDX 2026-501 (249) E5.17.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

" D

IA

M

ET

ER

2" PVC (TYP.) PER

LAYOUT DRAWINGS

5 #4 "L BARS" EQUALLY

SPACED TIE TO #4 CIRCLE BARS

3#4 BARS FORMED INTO

CIRCLE TIE TO #4 "L BARS"

BASE CAN

CF SHIMS

(AS NEEDED)

3/4" FLANGE

RING AND FIXTURE

L867/L-868 BASE CAN

3" E

XT

EN

SI

O

N S

H O

W N

D

IM

EN

SI

O N

V

AR

IE

S

P-610 CONCRETE

CONDUIT BACKFILL

APPROX. 3/4"

P-605 SEALANT,

3/8" BELOW FINISH GRADE NOTES:

1. THE BASIC PACKAGE TO BE USED FOR PLANNING THE

INSTALLATION OF ALL BASE CANS SHALL BE: (1) 3/4"

FIXTURE, (1) 3/4" GROOVED FLANGE RING, AND (1)

EXTENSION ON TOP OF THE L-868 BASE CAN. EXTENSION

TO BE SIZED AS SHOWN ON THE LIGHTING PLANS.

2. TO MEET FINAL GRADE REQUIREMENTS SHOWN ON THIS

DETAIL, THE CONTRACTOR (AT THE CONTRACTORS

EXPENSE) WILL BE REQUIRED TO PROVIDE SHIMS. THE

FINAL INSTALLATION SHALL NOT USE MORE THAN 3 SHIMS.

3. APPLY SILICONE SEALANT BETWEEN LIGHT, FLANGE RING

AND EXTENSIONS.

4. PROVIDE AND INSTALL 3/8" X 16 TYPE 304 (18-8) STAINLESS

STEEL HEX CAP FULLY THREADED BOLTS MARKED F593C

WITH STAINLESS STEEL ANTI-VIBRATION WASHERS

(HELICO OR NORDLOCK) FOR ALL IN-PAVEMENT FIXTURES.

TORQUE BOLTS TO MANUFACTURER'S

RECOMMENDATIONS WITH A MANUAL CALIBRATED

TORQUE WRENCH.

5. CONDUIT SHALL EXTEND INTO CAN 2" AFTER DUCT IS

BACKFILLED AND LENGTH HAS STABILIZED. GROMMETS

WILL BE FURNISHED WITH THE BASE CAN AND SHALL BE

USED FOR CONDUIT INSTALLATION INTO BASE CAN.

INSTALL END BELL ON CONDUIT.

ACP

FLUSH FIXTURE SHOWN. DETAIL ALSO

APPLICABLE TO ELEVATED LIGHT INSTALLATION

BASE CAN TYPE BASE CAN DIAMETER EXTENSION DIAMETER CORE DIAMETER REQUIRED

L-867 12" 13.5" 14.5"

L-867 16" 17.375" 18.5"

L-868 12" 12.5" 13.5"

L-868 15" 15.5" 16.5"

CORE DRILL

5KV CONNECTOR KITS FILL LIMITS

JUNCTION CAN VOLUME (CU. INCH) NUMBER OF KITS

12" DIA. 12" DEEP 1357 3

12" DIA 24" DEEP 2714 6

16" DIA. 24" DEEP 4825 10

BASED UPON 450 CUBIC INCHES PER KIT AND ONE CONSTANT CURRENT TRANSFORMER.

THE MAXIMUM NUMBER OF 5KV CONNECTOR KITS IN A SINGLE JUNCTION BASE CAN SHALL

NOT EXCEED THE ABOVE WITHOUT EXPRESS APPROVAL FROM THE PORT.

JUL Y 2 5 , 1991

JEFFERY L. NELSON

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

15521PE

REINFORCING BAR CAGE

CF SHIMS (AS NEEDED)

CONDUIT SIZE AND DEPTH

VARIES. SEE LIGHTING PLANS.

4/15/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:31:57 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\INSTALL AND EXTENSION DETAILS - N RUNWAY.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

ELECTRICAL DETAILS

ELECTRICAL DETAILS 1

GENE TUPPER

M. TIEASKIE

M. DETTMER

J. NELSON

OCTOBER 2026

236 CD

PDX 2026-501 E5.042024D011 102981

SCALE:

PLAN VIEW-REINFORCING BAR CAGE

N.T.S.1 SCALE:

FLANGE RING AND IN-PAVEMENT LIGHT INSTALLATION IN ACP

N.T.S.2

SCALE:

CORE SIZE FOR BASE CAN AND LIGHT EXTENSIONS

NONE3

SCALE:

5KV CONNECTOR KITS FILL LIMITS

NONE4

CF END BELL

PF BASE CAN GROMMET

P-606 SEALANT

DIGITALLY SIGNED
2026-10-08T09:15:05-0700
Jeff Nelson

File details come from the government source that posted it. Updated .