PDX 2026-501 (181) C12.02.pdf

PDF 360 KB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is a technical design drawing for the Portland International Airport North Runway Rehabilitation project in Oregon, specifically detailing communications vault repair work. The drawing, prepared by HNTB Corporation and dated October 2026, provides construction details for the repair and rehabilitation of an existing precast concrete communications vault (MH D-2) that contains critical Port and FAA communications services. The vault has sustained damage to its south wall and precast concrete cover, requiring structural reinforcement and replacement. The repair work includes excavation to expose the damaged wall, removal of an existing 12-inch concrete shield wall using hand-held equipment only, construction of a new concrete repair wall doweled to existing structure, and replacement of the precast concrete vault cover. All work must be performed without disrupting the critical communications services housed within the vault at any time during construction.

The technical specifications require concrete meeting P-610, 4,000 PSI standards with ASTM A615, Grade 60 reinforcing steel. The repair procedure mandates hand excavation for all work deeper than two feet below ground surface, careful protection of existing conduits, and restoration of ground surface elevations to match pre-construction conditions. The project includes backfilling with sand compacted to 95 percent maximum density, sealing joints with either preformed joint seals or non-sagging silicone sealant, and final acceptance by Port authority upon completion. The drawing includes detailed sections, bend diagrams for reinforcing steel, and comprehensive notes addressing excavation procedures, conduit protection, structural connections, and final restoration requirements specific to this critical airport communications infrastructure.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
PDX 2026-501 (249) E5.17.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/6/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

2:27:27 PM NCHOWDHURY c:\users\nchowdhury\dc\accdocs\hntb corporation\88598 - pdx north runway rehab\project files\shared cad\sheets - telecom\faa vault.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

COMMUNICATIONS VAULT REPAIR DETAILS

GENE TUPPER

C. EISELER

N. CHOWDHURY

H. CONRADT

OCTOBER 2026

181 CD

PDX 2026-501 C12.022024D011 102981

RISER, SEAL, AND COVER

REMOVE AND RETAIN FOR

REINSTALLATION

EXISTING GRADE

FINISH GRADE TO MATCH

5- S0

5"

3"

3"

7-5S054 @ 17"

8'-6"

7 - DRILL AND EPOXY 4L017 @ 17"

(3" EMBEDMENT)

3"

3"

3"

6.

5"

3' -9

- D R

IL

L

AN

D

E

PO

XY

L0

5" (3

" E M

BE

D

M

EN

T)

6.

5"

5' -1

0"

BB

A

A

NOTE(S):

1. CONCRETE SHALL BE P-610, 4,000 PSI

2. REINFORCING STEEL SHALL BE ASTM A 615, GRADE 60

3. EXISTING WALL REPAIR THICKNESS ASSUMED TO MATCH

THICKNESS OF PRECAST WALL, 4" AS SHOWN.

4. CONDUIT LOCATIONS SHOWN ARE APPROXIMATE.

RETAIN AND PROTECT CONDUIT. ADJUST PLACEMENT OF

REINFORCING TO ACCOMODATE CONDUIT AS NEEDED.

6"6"6"

2"

3"

5- S0

5"

4- D

R

IL

L

AN

D E

PO

XY

L0

5"

3"

3" EMBEDMENT

DRILL AND EPOXY 4L017 @ 17"

3" EMBEDMENT

SECTION A-A

7-5S054 @ 17"

5S086

DRILL AND EPOXY 4L017 @ 15"

EXISTING 4" CAST-IN-PLACE REPAIRED WALL

9'-0"

EXISTING PRECAST WALL

6"

2"

3"

3" E

M

BE

D M

EN

T

3"

3" E

M

BE

D M

EN

T

DRILL AND EPOXY

4L017 @ 15"

SECTION B-B

SCALE:

VAULT WALL REPAIR

N.T.S.3

BEND DIAGRAM

1'-0"

0' -7

4L017

5'-0"

7' -2

REMOVE AND REPLACE

PRECAST CONCRETE COVER

EXISTING 4" CAST-IN-PLACE

REPAIRED WALL. RETAIN AND

PROTECT

REMOVE EXISTING 12"

CONCRETE SHIELD WALL

4 - 4" PVC CONDUITS, EXISTING

RETAIN AND PROTECT

SCALE:

EXISTING VAULT SECTION VIEW

N.T.S.2

9'-0"

5' -0

EXISTING VAULT 4484-TA

PROVIDE NEW PRECAST

CONCRETE COVER

4 - 4" PVC CONDUIT

EXISTING

STRENGTHEN SOUTH WALL

PER DETAIL 3

C12.02

SCALE:

EXISTING VAULT PLAN VIEW

N.T.S.1

NEW WALL

NEW WALL

PRECAST CONCRETE VAULT COVER

REPLACE EXISTING WITH NEW TO MATCH

4" PVC CONDUIT, TYP.

SEE NOTE 4

GENERAL NOTE(S):

1. EXISTING VAULT MH D-2 CONTAINS CRITICAL PORT AND FAA COMMUNICATIONS SERVICES. THESE

SERVICES SHALL NOT BE DISRUPTED AT ANY TIME DURING CONSTRUCTION.

2. THE VAULT HAS DAMAGE TO THE SOUTH WALL AND THE PRECAST CONCRETE COVER. THE VAULT

SHALL BE REPAIRED BY ADDING A NEW CONCRETE WALL TO STRENGTHEN THE EXISTING

DAMAGED WALL AND REPLACING THE PRECAST CONCRETE COVER.

3. SHEET C12.03 SHOWS DETAILS OF THE ORIGINAL VAULT, FOR REFERENCE.

4. THE REPAIR PROCEDURE SHALL INCLUDE THE FOLLOWING:

a. SURVEY AND RECORD EXISTING GROUND SURFACE ELEVATIONS AS THE FIRST ORDER OF

WORK. FOLLOWING THE REPAIR, THE GROUND SHALL BE RESTORED TO MATCH

PREVIOUSLY-EXISTING CONDITIONS.

b. EXCAVATE TO EXPOSE THE WALL TO BE REPAIRED. ALL EXCAVATION DEEPER THAN 2' BELOW

GROUND SURFACE SHALL BE HAND EXCAVATION ONLY. EXCAVATION MAY ENCOUNTER CLSM.

DEWATER AS NEEDED. DO NOT EXCAVATE MORE THAN NECESSARY FOR THE REPAIR. DO NOT

DAMAGE EXISTING CONDUITS THAT WILL BE WITHIN THE EXCAVATION.

c. REMOVE EXISTING 12” CONCRETE SHIELD WALL. CONDUCT ENTIRE REMOVAL BY MEANS OF

HAND-HELD EQUIPMENT ONLY. DO NOT DAMAGE EXISTING CONDUITS THAT PASS THROUGH

THE WALL. DO NOT DAMAGE EXISTING VAULT WALL TO REMAIN.

d. CONSTRUCT WALL REPAIR IN ACCORDANCE WITH DETAIL 3 ON THIS SHEET. THE REPAIR WALL

SHALL BE DOWELED TO THE EXISTING STRUCTURE AS SHOWN.

e. FOLLOWING CURE AND ACCEPTANCE OF THE REPAIR WALL, BACKFILL THE EXCAVATION TO 6”

BELOW THE TOP OF THE WALL. BACKFILL WITH SAND PER ITEM P-152, COMPACTED TO 95%

MAXIMUM DENSITY.

f. EXCAVATE TO EXPOSE PRECAST CONCRETE VAULT COVER, TOP AND ALL SIDES. DO NOT BEGIN

THIS EXCAVATION UNTIL THE REPLACEMENT PRECAST CONCRETE COVER IS ON SITE.

g. REMOVE AND RETAIN EXISTING RISER, SEAL, AND COVER FOR REINSTALLATION.

h. PROVIDE NEW PRECAST CONCRETE COVER MATCHING EXISTING COMMUNICATIONS VAULT.

SEE SHEET C12.03 FOR EXISTING COMMUNICATION VAULT DETAILS. REMOVE AND DISPOSE OF

EXISTING PRECAST CONCRETE COVER.

i. MODIFY THE SEAT OF THE NEW PRECAST CONCRETE COVER TO MATCH MATING CONDITIONS

ON THE EXISTING VAULT WALLS.

j. INSTALL NEW PREFORMED JOINT SEAL WHERE THE SEAL CAN BE ACCOMMODATED. WHERE

PREFORMED JOINT SEAL CANNOT BE ACCOMMODATED, USE NON-SAG SILICONE SEALANT TO

SEAL THE JOINT BETWEEN THE PRECAST CONCRETE COVER AND THE TOP OF VAULT WALL.

k. INSTALL NEW PRECAST CONCRETE COVER. INSTALL EXISTING RISER, SEAL, AND COVER.

l. BACKFILL TO 6” BELOW FINISHED GROUND SURFACE WITH SAND PER ITEM P-152, COMPACTED

TO 95% MAXIMUM DENSITY. BACKFILL REMAINING DEPTH TO FINISHED GRADE WITH CRUSHED

AGGREGATE BASE COURSE PER ITEM P-209, NOMINAL 6” DEPTH, COMPACTED IN PLACE BY

NON-VIBRATORY ROLLING.

m. CLEAN VAULT INTERIOR OF ALL DEBRIS.

n. OBTAIN PORT ACCEPTANCE OF COMPLETED CONDITION.

EXISTING AND

NEW PRECAST LID

EXISTING

PRECAST FLOOR

EXISTING 4"

CAST-IN-PLACE

REPAIRED WALL

EXISTING

HATCH RISER

AND COVER

EXISTING PRECAST WALL

RE

G ISTERED PROFESS IONALENG I NEER

MARCH 9 , 1999

60434PE

OREGON

12/31/27EXPIRES:

HA NS N . CONRA DT

2026-10-06T18:09:48-0700
Hans N Conradt

File details come from the government source that posted it. Updated .