PDX 2026-501 (160) C9.09.pdf

PDF 385 KB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is a technical design detail document for the Portland International Airport North Runway Rehabilitation project in Oregon, specifically addressing storm drainage and underdrain systems. The document contains four detailed construction specifications for utility installations: a tee connection from a catch basin to new HDPE storm line, pipe connection to catch basin/manhole structures, connection from the underdrain system to new HDPE storm line, and typical utility locate details. The specifications detail the use of new 12-inch HDPE lateral connecting pipes with manufactured wye and tee fittings, 45-degree angles for minimum 12-inch connections, watertight coupling methods, and non-shrink cement grout for water-tight wall penetrations. The document establishes core pipe outer diameter plus 2-inch holes for structure wall penetrations and includes provisions for locating utilities within one foot of openings with appropriate labeling and warning tape placement.

The technical specifications incorporate standard construction practices including 10-gauge XHHW copper stranded locate wire coils placed at various depths (1 foot, 2 feet) for identifying new and existing utilities, with wire fastened to utility centerlines using non-conducting ties. The document references specific invert elevations for connecting pipes as detailed on project profiles and emphasizes water-tight construction requirements for all utility penetrations through structures such as inlets, catch basins, manholes, headwalls, valve boxes, vaults, and junction boxes. The design was prepared by HNTB Corporation in October 2026 and includes the professional seal of Hans N. Conradt, a registered professional engineer in Oregon, with an expiration date of December 31, 2027.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
PDX 2026-501 (249) E5.17.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW HDPE

PIPE

UTILIZE HDPE MANUFACTURED

"TEE" FITTING FOR CONNECTION

TO NEW HDPE PIPE.

NEW HDPE PIPE AT

45° FOR 12" MIN.

CONNECT PIPE TO STRUCTURE

USING NON-SHRINK CEMENT GROUT.

CONNECTION TO BE WATER TIGHT

WALL OF CATCH

BASIN/MANHOLE

STRUCTURE

CORE PIPE

O.D.+2" DIA.

HOLE FOR

PENETRATION

OF STRUCTURE

WALL

1" 1"

NEW 12" HDPE LATERAL CONNECTING

PIPE FROM CATCH BASIN

UTILIZE HDPE MANUFACTURED

"WYE" FITTING FOR CONNECTION

TO NEW HDPE PIPE

NEW HDPE

PIPE AT 45°

FOR 12" MIN

UTILITY (PIPE, DUCT, ETC.)

UTILITY (PIPE, DUCT, ETC.)

LOCATE

LOCATE COIL WITHIN ONE FOOT OF OPENING. LABEL "LOCATE".

STRUCTURE REFERS TO INLETS, CATCH BASINS, MANHOLES,

HEAD WALLS, VALVE BOXES, VAULTS, HAND HOLES, JUNCTION

AND PULL BOXES, AND SIMILAR ACCESS DEVICES.

GRADE GRADE

1' -0

1' -0

2' COIL AND UTILITY

LOCATE WIRE TAG

SEE KEY NOTE

WARNING TAPE

SUBGRADE

(PAVED AREAS)

STRUCTURE

OPENING

10 GAUGE XHHW

COPPER STRANDED

LOCATE WIRE

1' COIL

FASTEN WIRE

AS REQUIRED

STRUCTURE

WALL - SEE

KEY NOTE

1' COIL

BACK FILL

2' COIL

10 GAUGE XHHW COPPER STRANDED

LOCATE WIRE. WIRE TO BE PLACED

OVER CENTERLINE OF UTILITY

WARNING TAPE

2' COIL

BACK FILL

KEY NOTES:

LOCATE

NEW OR

EXISTING PIPE

NEW 6" HDPE CONNECTING PIPE

FROM UNDERDRAIN SYSTEM

UTILIZE WATERTIGHT

COUPLING FOR

CONNECTING

TO EXISTING PIPE

45° BEND

45° BEND

PI

PE

O .D

NOTE:

1. FASTEN LOCATE WIRE TO UTILITY (TOP

CENTERLINE) USING NON-CONDUCTING

TIES OR OTHER SUITABLE MEANS. FASTEN

AT SUFFICIENT NUMBER OF LOCATIONS TO

ENSURE WIRE WILL REMAIN IN PLACE.

NOTE(S):

1. THIS DETAIL TO BE USED UNLESS SPECIFIC

INVERT ELEVATIONS FOR THE CONNECTING

PIPE ARE GIVEN ON THE PROFILES.

NOTE(S):

1. THIS DETAIL TO BE USED UNLESS SPECIFIC

INVERT ELEVATIONS FOR THE CONNECTING

PIPE ARE GIVEN ON THE PROFILES.

SCALE:

TEE CONNECTION FROM CATCH BASIN

TO NEW HDPE STORM LINE

N.T.S.1

10/6/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:49:42 PM NCHOWDHURY c:\users\nchowdhury\dc\accdocs\hntb corporation\88598 - pdx north runway rehab\project files\shared cad\sheets - civil\storm drainage details.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

STORM DRAINAGE AND UNDERDRAIN DETAILS 3

GENE TUPPER

C. EISELER

N. CHOWDHURY

H. CONRADT

OCTOBER 2026

160 CD

PDX 2026-501 C9.092024D011 102981

SCALE:

PIPE CONNECTION

TO CATCH BASIN/MANHOLE

N.T.S.2 SCALE:

CONNECTION FROM UNERDRAIN SYSTEM

TO NEW HDPE STORM LINE

N.T.S.3

SCALE:

TYPICAL UTILITY LOCATE DETAIL

N.T.S.4

RE

G ISTERED PROFESS IONALENG I NEER

MARCH 9 , 1999

60434PE

OREGON

12/31/27EXPIRES:

HA NS N . CONRA DT

2026-10-06T17:40:20-0700
Hans N Conradt

File details come from the government source that posted it. Updated .