This is an electrical lighting plan drawing for the Portland International Airport (PDX) North Runway Rehabilitation project in Oregon, specifically covering Runway 10L-28R from Station 220+00 to Station 230+00. The document, dated October 2026 and prepared by design firm personnel including Gene Tupper, M. Tieaskie, M. Dettmer, and registered professional engineer J. Nelson (PE #15521), details the installation and reinstallation of airfield lighting infrastructure associated with runway rehabilitation work. The project encompasses runway centerline lights, elevated and in-pavement LED runway edge lights, taxiway centerline lights, runway guard/stop bar lights, and associated electrical conductors and conduit systems. Key work activities include core drilling to reinstall lights prior to final paving, sawcutting to install conductors in concrete-encased PVC conduit between lights, removal and protection of existing fixtures for reinstallation after paving, installation of new isolation transformers rated at various wattages (30/45 watts to 100 watts) with 6.6/6.6 amp specifications, and coordination with FAA ALSF-2 (Approach Lighting System) installation work including barrettes, vaults, ducts, and equipment per FAA Drawing PDX-D-ALS10L.

The drawing specifies technical installation details for multiple lighting circuits including 10LCL, GS10L, 10L-28R, 10LBRT, and other designated circuits using #8 and #6, 5KV conductors in 2-inch PVC or GRSC conduit with 12-inch diameter, 24-inch deep base cans and 3-inch extensions with 3/4-inch thick flange rings. The plan requires coordination between milling operations, paving work, and electrical installations, with specific sequencing requirements such as conductor installation prior to paving and light reinstallation after paving completion. The drawing includes cross-references to related sheets (E2.02 for removal information, E3.02 for geometry, E5.03 through E6.06 for installation and color details, and E7.01 through E7.15 for guidance sign installation) and incorporates FAA design standards with a scale of 1 inch equals 50 feet. The document was digitally signed on October 8, 2026, and includes a notation that the engineer's professional registration expires December 31, 2026.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
PDX 2026-501 (249) E5.17.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V

V V

V V V V

RRRRR

R

R

R

R

R

R R

R R R R R

J

J

J

JJ

J

ABANDABAND

AB

AN

D

ABANDABAND

ABAND

ABAND

ABAND

COM

COM

COM

COM COM COM COM COM COM

COM

COM

FAA

FAA

E

E

E

E E

E

E

EE

E

E E

E E E

E

E

E

E

E E E E E E

E

E

E E

E

E

E

E

E

10L-9

K-4

K-6

K-5

K-4

K-6

K-5

10L-9 E

COM

FAA

E

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

GS1

0L

GS10L

GS10L

10LWW

10LWW

10LW

W

G S10L

GS10L

GS10L

KCLb KCLa

KCLbKCLa

KCLbKCLa

KCLbKCLa

KCLbKCLa

1-2" GRSC

GSK

KGSK

GS10L

10LWW GSK

K

GSK

K

GSK

KGSK

KG

SK GSK

G S1

0L

G S1

0L K

C Lb

K C

La

LB

R T

LW

W

G S

K

G S1

0L

(2)10LWW

(2)GSK

(1) KCLa

(1) KCLb

1-2" PVC

1-2" G

RSC

(2)K

(2)GSK

K C

Lb K

C La

1-2" GRSC1-2" GRSC

GS10L

10LWWKCLb

KCLa

KCLb KCLa

KCLbKCLa

KCLa

GS10L

GS10L

GS10L

GS10L

GS10L

GS10L

GSK GSK

10LBRT

10LB

R

T

10LB

R

T

10LB

R T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R T

10LB

R

T

10LB

R

T

GS10L

3-

W W

K

K

GSK

K

GSK

K

GSK

K

GSK

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

L-

R

L-

R

10L-28R

L-

R

L-

R

L-

R

L-

R

L-

R

10L-28R

10L-28R

10L-28R

10L-28R

10L-28R

10L-28R

G S1

0L

G S1

0L

G S1

0L

10LB

R

T

10LB

R T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R

T

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT10LBRT10LBRT10LBRT10LBRT10LBRT10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

GS10L

10LBRT

G S1

0L

G S1

0L

LB

RT

E

E

FA

A

FA

A

E E E

E

E

V

AAAAA

AAAAA

AAAAA

AAAAA

AAAAA

A A A A

AAAAA

A

AAAAA

A

AAAAA

A A A A A A A A

A A A A A A A A

A A A

AAAAA

A A A

A A A

AAAAA

A A A

A

0+

5+

0+

1 1 1 1 1 1 1

11 11

TA

XI

W

AY

K

℄ RUNWAY 10L-28R

12 12

2 2 2

2 22

6 3

43 5 4

TYP.

FAA DESIGN, TYPICAL. SEE

EXHIBIT C, DRAWINGS

PDX-D-ALS10L.

SCALE: IN Feet

100500 25 150

N

M

AT

C H

LI

N

E

ST

A.

+0

- S

EE

S

H

EE

T E4

.0

JUL Y 2 5 , 1991

JEFFERY L. NELSON

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

15521PE

12/11/2024

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

12:23:23 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\ELECTRICAL LIGHTING PLANS.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

ELECTRICAL LIGHTING PLAN

RUNWAY 10L-28R STA 220+00 TO STA 230+00

GENE TUPPER

M. TIEASKIE

M. DETTMER

J. NELSON

OCTOBER 2026

212 CD

PDX 2026-501 E4.022024D011 102981

N

LOCATE PLAN

SCALE : N.T.S.

SCALE:

ELECTRICAL LIGHTING PLAN

RUNWAY 10L-28R STA 220+00 TO STA 230+00

1" = 50'1

NOTES:

1. STATION AND OFFSETS ON THIS SHEET

ARE BASED ON RUNWAY 10L-28R

CENTERLINE ALIGNMENT.

2. FOR REMOVAL INFORMATION ASSOCIATED

WITH THIS DRAWING, SEE SHEET E2.02.

3. FOR GEOMETRY INFORMATION

ASSOCIATED WITH THIS DRAWING, SEE

SHEET E3.02.

M

AT

C H

LI

N

E

ST

A.

+0

- S

EE

S

H

EE

T E4

.0

KEY NOTES:

1. JUST PRIOR TO FINAL LIFT PAVING, CORE DRILL TO

REINSTALL RUNWAY CENTERLINE LIGHT ON PF L-868,

12” DIAMETER, 24” DEEP BASE CAN, PF 3” EXTENSION,

PF 3/4” THICK FLANGE RING AND CF 30/45 WATT,

6.6/6.6 AMP ISOLATION TRANSFORMER. FOR

INSTALLATION AND COLOR DETAILS, SEE SHEET E5.03

AND SHEET E6.02.

2. UPON COMPLETION OF MILLING OPERATIONS, AND

PRIOR TO PAVING, SAWCUT TO INSTALL 1 #8, 5KV

CONDUCTOR FOR CIRCUIT 10LCL IN CONCRETE

ENCASED 2” PVC BETWEEN LIGHTS. SEE DETAIL 1,

SHEET E5.07. COORDINATE CONDUIT INSTALLATION

WORK WITH FAA ALSF WORK TO ROUTE CONDUIT

THROUGH CENTERLINE BARRETTES.

3. AT POINT INDICATED, REINSTALL ELEVATED LED

RUNWAY EDGE LIGHT ON PF L-867, 12” DIAMETER, 24”

DEEP BASE CAN, PF 3” EXTENSION, PF 3/4” THICK

FLANGE RING AND CF 45-WATT, 6.6/6.6 AMP

ISOLATION TRANSFORMER. SEE DETAIL 1, SHEET

E5.05. FOR INSTALLATION AND LIGHT COLOR DETAILS

SEE SHEET E6.01.

4. PROVIDE AND INSTALL #8, 5KV CONDUCTORS IN 2”

PVC BETWEEN LIGHTS FOR CIRCUITS SHOWN. SEE

DETAIL 2, SHEET E5.07.

5. AT POINT INDICATED, INSTALL PF 16" DIAMETER BASE

CAN AND REINSTALL MICROWAVE SENSOR AND AGC

UTILITY REMOTE ENCLOSURE ASSEMBLY PER

DETAILS SHEET E5.10. PROVIDE AND INSTALL NEW CF

100-WATT, 6.6/6.6 AMP ISOLATION TRANSFORMER.

6. AT POINT INDICATED IS AN EXISTING 2” PVC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING 1-#8 (GS10L),

AND 1-#6 (10L-28R) 5KV AIRFIELD LIGHTING

CONDUCTORS. INTERCEPT CONDUIT AND REMOVE

CONDUCTORS AND DISPOSE OF OFF PORT

PROPERTY. EXTEND A NEW 2” PVC CONDUIT

BETWEEN NEW LIGHT CANS AND EXISTING CONDUIT.

PROVIDE AND INSTALL TWO NEW #8, 5KV

CONDUCTORS FOR CIRCUITS GS10L AND 10L-28R AS

SHOWN.

7. AT POINT INDICATED IS AN EXISTING ELEVATED

RUNWAY END LIGHT. REMOVE AND PROTECT THE

LIGHT FOR REINSTALLATION AFTER PAVING WORK.

BASE CAN, EXTENSION AND FLANGE RING TO REMAIN

IN PLACE. REMOVE TRANSFORMER AND DISPOSE OF

OFF PORT PROPERTY. INSTALL PF COVER PLATE TO

ACCOMMODATE PAVING WORK. AFTER PAVING WORK

IS COMPLETE, REMOVE COVER PLATE AND

REINSTALL THE LIGHT WITH NEW CF 45W, 6.6/6.6 AMP

ISOLATION TRANSFORMER TO CIRCUIT 10L-28R .

RETURN COVER PLATE TO THE PORT.

8. PROVIDE AND INSTALL #8, 5KV CONDUCTORS IN

EXISTING 2” PVC OR GRSC BETWEEN LIGHTS FOR

CIRCUITS SHOWN. PROTECT EXISTING CONDUCTORS

IN THE CONDUIT.

9. JUST PRIOR TO FINAL LIFT PAVING, CORE DRILL TO

REINSTALL IN-PAVEMENT LED RUNWAY EDGE LIGHT

ON PF L-868, 12” DIAMETER, 24” DEEP BASE CAN, PF 3”

EXTENSION, PF 3/4” THICK FLANGE RING AND CF

65-WATT, 6.6/6.6 AMP ISOLATION TRANSFORMER. SEE

DETAIL 1, SHEET E5.03. FOR INSTALLATION AND LIGHT

COLOR DETAILS SEE SHEET E6.01.

10. AT POINT INDICATED IS AN EXISTING 2” GRSC

CONDUIT APPROXIMATELY 24” DEEP CONTAINING 1-#8

(GS10L),AND 1-#6 (10L-28R) 5KV AIRFIELD LIGHTING

CONDUCTORS. INTERCEPT CONDUIT AND REMOVE

CONDUCTORS AND DISPOSE OF OFF PORT

PROPERTY. EXTEND A NEW 2” GRSC CONDUIT

BETWEEN NEW LIGHT CANS AND EXISTING CONDUIT.

11. AT POINT INDICATED IS AN EXISTING

RUNWAY/TAXIWAY EDGE LIGHT WITH A 3/4” THICK

FLANGE RING AND 3” EXTENSION. REMOVE AND

PROTECT THE LIGHT FOR REINSTALLATION AFTER

PAVING WORK. REMOVE AND DISPOSE OF

TRANSFORMER OFF PORT PROPERTY. INSTALL PF

TARGET PLATE OVER THE LIGHT BASE TO

ACCOMMODATE MILLING AND PAVING WORK. AFTER

PAVING WORK, PROVIDE AND INSTALL NEW 6.6/6.6

AMP ISOLATION TRANSFORMER AND REINSTALL THE

LIGHT. FOR INSTALLATION AND LIGHT COLOR

DETAILS SEE SHEET E6.01 AND SHEET E6.06.

12. PROVIDE AND INSTALL #8, 5KV CONDUCTORS IN

EXISTING 2” PVC OR GRSC BETWEEN LIGHTS FOR

CIRCUITS SHOWN. PROTECT EXISTING CONDUCTORS

IN THE CONDUIT.

13. FOR DETAILS OF GUIDANCE SIGN INSTALLATION, SEE

SHEET E7.01 THROUGH E7.15.

14. AT POINT INDICATED IS AN EXISTING RUNWAY

GUARD/STOP BAR LIGHT. TAKE CARE TO LABEL EACH

FIXTURE FOR REINSTALLATION AT EXACT SAME

LOCATION. REMOVE AND PROTECT THE LIGHT FOR

REINSTALLATION AFTER PAVING WORK. BASE CAN,

EXTENSION AND FLANGE RING TO REMAIN IN PLACE.

FOR MILLING AND PAVING WORK, INSTALL CF

SHORTING DEVICE ON TRANSFORMER SECONDARY.

INSTALL PF COVER PLATE TO ACCOMMODATE PAVING

WORK. UPON COMPLETION OF PAVING WORK,

REMOVE THE COVER PLATE AND INSTALL NEW CF

ISOLATION TRANSFORMER PER SHEET E4.13.

REINSTALL THE LIGHT AFTER PAVING WORK IS

COMPLETE. RETURN THE COVER PLATE TO THE

PORT.

15. UPON COMPLETION OF MILLING OPERATIONS AND

PRIOR TO PAVING, SAWCUT TO INSTALL 2 #8, 5KV

CONDUCTORS FOR CIRCUIT 10LBRT IN CONCRETE

ENCASED 2” PVC BETWEEN CENTERLINE LIGHT AND

AGC JUNCTION CAN . SEE DETAIL 1, SHEET E5.07.

16. PROVIDE AND INSTALL TWO #8, 5KV CONDUCTORS IN

2" PVC BETWEEN LIGHT BASE CAN AND SIGN

JUNCTION CAN FOR CIRCUIT GS10L. SEE DETAIL 2,

SHEET E5.07.

17. JUST PRIOR TO FINAL LIFT PAVING, CORE DRILL TO

REINSTALL TAXIWAY CENTERLINE LIGHT ON PF L-868,

12" DIAMETER, 24" DEEP BASE CAN, PF 3" EXTENSION

AND PF 3/4" THICK FLANGE RING. REINSTALL

SALVAGED REMOTE CONTROL DEVICE AND INSTALL

A CF 65-WATT, 6.6/6.6 AMP ISOLATION TRANSFORMER.

SEE SHEET E5.03 FOR BASE CAN DETAILS AND SHEET

E4.13 FOR CONNECTION DETAILS.

18. UPON COMPLETION OF MILLING OPERATIONS, AND

PRIOR TO PAVING, SAWCUT TO INSTALL 2 #8, 5KV

CONDUCTORS FOR CIRCUIT 10LBRT IN CONCRETE

ENCASED 2" PVC BETWEEN CENTERLINE LIGHTS OR

AGC ENCLOSURE JUNCTION CAN. SEE DETAIL 1,

SHEET E5.07.

19. IN LIGHT BASE INDICATED, CONNECT NEW

CONDUCTORS TO EXISTING CONDUCTORS AND MAKE

CONNECTIONS NECESSARY TO REESTABLISH THE

CIRCUITS.

20. INSTALL FAA ALSF-2 BARRETTES, VAULTS, DUCTS

AND EQUIPMENT PER FAA DRAWINGS PDX-D-ALS10L.

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

DIGITALLY SIGNED
2026-10-08T09:13:20-0700
Jeff Nelson

File details come from the government source that posted it. Updated .