This is a pavement removal plan document for the Portland International Airport North Runway Rehabilitation project in Oregon, specifically detailing the removal of asphalt concrete pavement (ACP) along Runway 10L-28R from Station 259+00 to Station 264+50. The project encompasses multiple pavement removal sections with varying depths, including 16-inch ACP mill sections, 9-inch ACP mill sections, 4-inch nominal ACP mill sections, 2-inch nominal ACP mill sections, and 10-inch to 11-inch ACP removal sections. The plan was prepared by HNTB Corporation and dated October 2026, with design notes indicating full-depth vertical saw cutting is required for pavement removal along all adjacent pavement to remain. The document serves as a civil construction drawing showing the spatial layout and specifications for the pavement removal operations, with cross-references to additional sheets for alignment geometry (Sheets C1.01-C1.11), civil utility removal and adjustment plans (Sheets C8.01-C8.05), and airfield electrical removal plans (Sheets E2.01-E2.12).
The technical specifications include two nominal curves (C18 and C21) with defined radius measurements, delta angles, tangent lengths, and curve lengths to guide the removal operations. The plan notes that pavement removal is based on the 10L-28R centerline alignment and identifies an existing electrical vault and pad adjacent to the runway shoulder requiring coordination with electrical removal work. This drawing represents the design phase documentation for a significant runway rehabilitation project at a major commercial airport facility and would serve as the basis for contractor bid preparation and construction execution.
View the file
Other files
Show 40 more
Latest 50 of 308 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VV
co co co co co
VV
STS
COM
COM
EE
E E E
E
E
E
E
FW
STS
STS
STS
E
263+57.67
110.00' RT
260+97.02
75.00' RT
259+75.88
110.00' RT
261+23.16
30.00' RT
261+23.16
75.00' RT
35'
NOMINAL
CURVE TABLE
CURVE
C18
C21
R
1500.00'
1470.00'
DELTA
26° 24' 20"
21° 40' 42"
T
351.90'
281.46'
L
691.29'
556.19'
RP STATION RP OFFSET
PORTLAND OFFICE
5500 MEADOWS RD., #250
LAKE OSWEGO, OR 97035
503.419.2130 OFFICE
503.639.2710 FAX
SCALE:
RUNWAY 10L-28R STA 259+00 TO 264+50
1" = 30'1
RUNWAY 10L-28R
M
AT
C H
LI
N
E
ST
A
4+
.0 0, S
EE
S H
EE
TC
3.
KEY NOTES:
FULL DEPTH VERTICAL SAW CUTTING IS REQUIRED FOR
PAVEMENT REMOVAL ALONG ALL ADJACENT PAVEMENT TO
REMAIN.
EXISTING ELECTRICAL VAULT AND PAD ADJACENT TO
RUNWAY SHOULDER. SEE SHEETS E2.01 THROUGH E2.12 FOR
ELECTRICAL REMOVAL SHEETS.
10/5/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
3:23:15 PM CAASLAND c:\users\caasland\dc\accdocs\hntb corporation\88598 - pdx north runway rehab\project files\shared cad\sheets - civil\pavement removal plans.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
NORTH RUNWAY REHABILITATION
PAVEMENT REMOVAL PLANS
RUNWAY 10L-28R STA 259+00 TO STA 264+50
GENE TUPPER
G. STEVENS
C. AASLAND
B. FOSTER
OCTOBER 2026
33 CD
PDX 2026-501 C3.072024D011 102981
KEY PLAN
SCALE : N.T.S.
M
AT
C H
LI
N
E
ST
A
9+
.0 0, S
EE
S H
EE
T
C 3.
LEGEND:
16" ACP MILL SECTION,
SEE DETAIL
9" ACP MILL SECTION,
SEE DETAIL
4" NOMINAL ACP MILL SECTION,
SEE DETAIL
2" NOMINAL ACP MILL SECTION,
SEE DETAIL
10" - 11" ACP REMOVAL SECTION,
SEE DETAIL
C3.20
C3.20
C3.20
C3.20
C3.20
SCALE: IN FEET
60'30'0' 15' 90'
N
260+97.02 1575.00' RT
260+97.02 1575.00' RT
NOTES:
1. PAVEMENT REMOVAL BASED ON 10L-28R CENTERLINE ALIGNMENT.
SEE SHEETS C1.01 THROUGH C1.11 FOR ALIGNMENT GEOMETRY.
2. FOR CIVIL UTILITY REMOVAL AND ADJUSTMENT PLANS, SEE SHEETS
C8.01 THROUGH C8.05.
3. FOR AIRFIELD ELECTRICAL REMOVAL PLANS, SEE SHEETS E2.01
THROUGH E2.12.
6 E37 E0%ER 0 � � �
0 � 0
*$RRE77 3� 67E9E16
E;3� 0���0���
E1*,1EER
RE
*,6
7ERED 3R2)E66,21$/
2RE*21
�����3E
2 2
MULTICORELINK:PAVEMENT REMOVAL PLANS-PAVE. REM. PLAN 8 (30SC)
MULTICORELINK:PAVEMENT REMOVAL PLANS-PAVE. REM. PLAN 6 (30SC)
| Sheets and Views |
| PAVEMENT REMOVAL PLANS-PAVE. REM. PLAN 7 (30SC) |
| 2026-10-06T16:19:10-0700 | |
| DIGITALLY SIGNED | |
| Garrett P Stevens |
File details come from the government source that posted it. Updated .