PDX 2026-501 (186) E2.02.pdf

PDF 846 KB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is an Electrical Removal Plan document for the Portland International Airport North Runway Rehabilitation project located in Oregon, specifically detailing work on Runway 10L-28R between stations 220+00 and 230+00. The project involves the removal and protection of existing electrical infrastructure including runway centerline lights, runway edge lights, taxiway centerline lights, elevated runway and taxiway edge lights, aircraft guidance signs, isolation transformers, and various electrical conduits and conductors rated for 5KV airfield lighting circuits. The plan designates 23 specific work points with detailed removal procedures, including the removal of a FAA MALSR (Medium Intensity Approach Lighting System with Runway Environment) vault system per FAA drawings PDX-D-ALS10L, and the protection and reinstallation of lighting fixtures after paving work is completed. The drawing is dated October 2026 and was prepared by registered professional engineer Jeffrey L. Nelson with an expiration date of December 31, 2026.

The electrical removal plan serves as construction documentation defining work scope boundaries, including pavement milling and removal limits, and specifies that certain components such as microwave sensors, remote enclosure assemblies, and guidance signs are to be labeled, protected, and preserved for reinstallation, while base cans, transformers, conduits, and conductors are to be removed and disposed of off port property. The plan references related sheets including E2.01, E3.02, E4.02, E5.10, and FAA drawings for comprehensive project information regarding geometry, lighting details, and equipment specifications. No pricing, funding sources, or contract award information is contained within this technical drawing document.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
PDX 2026-501 (249) E5.17.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

K

GS1

0L

GS10L

GS10L

10LWW

10LWW

10LW

W

G S10L

GS10L

LB

RT

G

S1 0L

GS10L

KCLb KCLa

KCLbKCLa

KCLbKCLa

KCLbKCLa

KCLbKCLa

1-2" GRSC

GSK

KGSK

GS10L

10LWW GSK

K

GSK

K

GSK

KGSK

KG

SK GSK

LC

L

G S1

0L

LC

L

G S1

0L

L-

R

LC

L

G S1

0L

L-

R

K C

Lb

K C

La

LB

R T

LW

W

G S

K

G S1

0L

(2)10LWW

(2)GSK

(1) KCLa

(1) KCLb

1-2" PVC

10L-28R

LC

L1-2" G

RSC

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

G S1

0L

L-

R

G S1

0L

L-

R

G S1

0L

L-

R

GS10L

10LBRT

L-

R

L-

R

(2)K

(2)GSK

K C

Lb K

C La

1-2" GRSC1-2" GRSC

GS10L

10L-28R

10L-28R

10L-28R

10L-28R

10L-28R

10L-28R

10LWWKCLb

KCLa

KCLb KCLa

KCLbKCLa

KCLa

GS10L

GS10L

GS10L

GS10L

GS10L

GS10L

GSK GSK

10LBRT

10LB

R

T

10LB

R

T

10LB

R T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R T

10LB

R

T

10LB

R

T

GS10L

3-

W W

K

K

GSK

K

GSK

K

GSK

K

GSK

10LB

R

T

10LB

R T

10LB

R

T

10LB

R

T

10LB

R

T

10LB

R

T

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT10LBRT10LBRT10LBRT10LBRT10LBRT10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

10LBRT

V

V V

V V

V VV V V

V V

RRRRR

R

R

R

R

R

R R

R R R R R

J

J

J

J

JJ

J

J

ABANDABAND

AB

AN

D

ABANDABAND

ABAND

ABAND

ABAND

COM

COM

COM

COM COM COM COM COM COM

COM

COM

FAA

FAA

E

E

E

E E

E

E E

E

E

E

FAA

FA

A

FAA FAA

FA

A

FA

A

FAAFAA

FA

A

E

E

E E

E

E

EE

E

E E

E E E

E

E E E

EE

E

E

E E E E E E

E

E

E E

E

E

E

E

E

10L-9

K-4

K-6

K-5

E

COM

FAA

E

TA

XI

W

AY

K

℄ RUNWAY 10L-28R

0+

5+

0+

1 1 1 1 1 1 1 1 1

1313 16

2 2 2

4 4

20 20

SCALE: IN Feet

100500 25 150

N

M

AT

C H

LI

N

E

ST

A.

+0

- S

EE

S

H

EE

T E2

.0

JUL Y 2 5 , 1991

JEFFERY L. NELSON

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

15521PE

12/12/2024

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

12:10:45 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\ELECTRICAL REMOVAL PLANS.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

ELECTRICAL REMOVAL PLAN

RUNWAY 10L-28R STA 220+00 TO STA 230+00

GENE TUPPER

M. TIEASKIE

M. DETTMER

J. NELSON

OCTOBER 2026

186 CD

PDX 2026-501 E2.022024D011 102981

N

LOCATE PLAN

SCALE : N.T.S.

SCALE:

ELECTRICAL REMOVAL PLAN

RUNWAY 10L-28R STA 220+00 TO STA 230+00

1" = 50'1

NOTES:

1. STATION AND OFFSETS ON THIS SHEET ARE BASED

ON RUNWAY 10L-28R CENTERLINE ALIGNMENT.

2. FOR GEOMETRY INFORMATION ASSOCIATED WITH

THIS DRAWING, SEE SHEET E3.02.

3. FOR LIGHTING INFORMATION ASSOCIATED WITH

THIS DRAWING, SEE SHEET E4.02.

KEY NOTES:

1. AT POINT INDICATED IS AN EXISTING RUNWAY CENTERLINE

LIGHT. REMOVE, LABEL AND PROTECT THE LIGHT FOR

REINSTALLATION AT SAME LOCATION AFTER PAVING WORK.

REMOVE AND DISPOSE OF ISOLATION TRANSFORMER,

FLANGE RING, EXTENSION, BASE CAN, GROUND ROD AND

CONCRETE ANCHOR OFF PORT PROPERTY.

2. AT POINT INDICATED IS AN EXISTING 1” OR 1-1/2” IMC

CONDUIT APPROXIMATELY 5"-10” DEEP CONTAINING ONE #6,

5KV AIRFIELD LIGHTING CONDUCTOR FOR CIRCUIT 10LCL.

VERIFY CIRCUIT WITHIN THE CONDUIT AND LOCK OUT THE

CIRCUIT. REMOVE AND DISPOSE OF CONDUCTOR,

ENCASEMENT MATERIAL AND CONDUIT OFF PORT

PROPERTY.

3. AT POINT INDICATED IS AN EXISTING RUNWAY EDGE LIGHT.

REMOVE, LABEL AND PROTECT THE LIGHT FOR

REINSTALLATION AT SAME LOCATION AFTER PAVING WORK.

REMOVE AND DISPOSE OF ISOLATION TRANSFORMER,

FLANGE RING, EXTENSION AND BASE CAN OFF PORT

PROPERTY.

4. AT POINT INDICATED IS AN EXISTING 2” PVC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING #8 AND #6, 5KV

AIRFIELD LIGHTING CONDUCTORS FOR CIRCUITS SHOWN.

VERIFY CIRCUITS WITHIN THE CONDUIT AND LOCK OUT

AFFECTED CIRCUITS. REMOVE AND DISPOSE OF

CONDUCTORS AND CONDUITS OFF PORT PROPERTY.

5. AT POINT INDICATED IS AN EXISTING MICROWAVE SENSOR

AND A UTILITY REMOTE ENCLOSURE ASSEMBLY MOUNTED

ON A 16 “ DIAMETER BASE CAN CONTAINING ONE ISOLATION

TRANSFORMER AND REMOTE . REMOVE, LABEL AND

PROTECT THE SENSOR AND REMOTE ENCLOSURE

ASSEMBLY FOR REINSTALLATION AT SAME LOCATION AFTER

PAVING WORK. REMOVE AND DISPOSE OF ISOLATION

TRANSFORMER, FLANGE RING, EXTENSION AND BASE CAN

OFF PORT PROPERTY. SEE SHEET E5.10 FOR DETAILS OF

THE WORK.

6. AT POINT INDICATED IS AN EXISTING 2” PVC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING #6 AND #8, 5KV

AIRFIELD LIGHTING CONDUCTORS FOR CIRCUITS SHOWN.

VERIFY CIRCUITS WITHIN THE CONDUIT AND LOCK OUT

AFFECTED CIRCUITS. REMOVE CONDUCTORS OUT OF THE

CONDUIT. INTERCEPT THE CONDUIT AT PAVEMENT

REMOVAL LIMIT AND REMOVE AND DISPOSE OF CONDUIT

AND CONDUCTORS OFF PORT PROPERTY.

7. AT POINT INDICATED IS AN AIRCRAFT GUIDANCE SIGN ON A

CONCRETE FOUNDATION. REMOVE GUIDANCE SIGN AND

TURN IT OVER TO THE PORT. REMOVE AND DISPOSE OF

SIGN FOUNDATION, TRANSFORMER AND BASE CAN OFF

PORT PROPERTY.

8. AT POINT INDICATED IS AN EXISTING ELEVATED RUNWAY

END LIGHT. REMOVE AND PROTECT THE LIGHT FOR

REINSTALLATION AFTER PAVING WORK. REMOVE AND

DISPOSE OF ISOLATION TRANSFORMER OFF PORT

PROPERTY. BASE CAN, EXTENSION AND FLANGE RING TO

REMAIN IN PLACE. INSTALL PF COVER PLATE TO

ACCOMMODATE PAVING WORK. REMOVE COVER PLATE AND

REINSTALL THE LIGHT AFTER PAVING WORK IS COMPLETE.

RETURN COVER PLATE TO THE PORT.

9. AT POINT INDICATED IS AN EXISTING 2” GRSC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING #6, 5KV AIRFIELD

LIGHTING CONDUCTORS FOR CIRCUITS SHOWN. VERIFY

CIRCUITS WITHIN THE CONDUIT AND LOCK OUT AFFECTED

CIRCUITS. REMOVE AND DISPOSE OF CONDUCTORS OFF

PORT PROPERTY. CONDUIT TO REMAIN AND EXTENDED.

10. AT POINT INDICATED IS AN EXISTING TAXIWAY CENTERLINE

LIGHT AND A SINGLE CHANNEL REMOTE CONTROL DEVICE.

REMOVE, LABEL AND PROTECT THE LIGHT AND REMOTE

CONTROL DEVICE FOR REINSTALLATION AT SAME LOCATION

AFTER PAVING WORK. REMOVE AND DISPOSE OF ISOLATION

TRANSFORMER, FLANGE RING, EXTENSION AND BASE CAN

OFF PORT PROPERTY. BETWEEN LIGHTS IS AN EXISTING

1-1/2” IMC CONDUIT APPROXIMATELY 5"-10” DEEP

CONTAINING TWO #8, 5KV AIRFIELD LIGHTING CONDUCTORS

FOR CIRCUIT 10LBRT. VERIFY CIRCUIT WITHIN THE CONDUIT

AND LOCK OUT THE CIRCUIT. REMOVE AND DISPOSE OF

CONDUCTORS AND CONDUIT OFF PORT PROPERTY.

11. AT POINT INDICATED IS AN EXISTING IN-PAVEMENT RUNWAY

EDGE LIGHT. REMOVE, LABEL AND PROTECT THE LIGHT FOR

REINSTALLATION AT SAME LOCATION AFTER PAVING WORK.

REMOVE AND DISPOSE OF ISOLATION TRANSFORMER,

FLANGE RING, EXTENSION AND BASE CAN OFF PORT

PROPERTY.

12. AT POINT INDICATED IS AN EXISTING 2” GRSC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING #8 AND #6, 5KV

AIRFIELD LIGHTING CONDUCTORS FOR CIRCUITS SHOWN.

VERIFY CIRCUITS WITHIN THE CONDUIT AND LOCK OUT

AFFECTED CIRCUITS. REMOVE AND DISPOSE OF

CONDUCTORS OFF PORT PROPERTY.

13. AT POINT INDICATED IS AN EXISTING ELEVATED RUNWAY

EDGE LIGHT. REMOVE, LABEL AND PROTECT THE LIGHT FOR

REINSTALLATION AT SAME LOCATION AFTER PAVING WORK.

REMOVE AND DISPOSE OF ISOLATION TRANSFORMER, OFF

PORT PROPERTY. INSTALL PF TARGET PLATE OVER THE

LIGHT BASE TO ACCOMMODATE MILLING AND PAVING WORK.

14. AT POINT INDICATED IS AN EXISTING ELEVATED TAXIWAY

EDGE LIGHT. REMOVE AND PROTECT THE LIGHT FOR

REINSTALLATION AFTER PAVING WORK. INSTALL CF

SHORTING DEVICE ON SECONDARY OF TRANSFORMER.

INSTALL PF TARGET PLATE OVER THE LIGHT BASE TO

ACCOMMODATE MILLING AND PAVING WORK.

15. AT POINT INDICATED IS AN EXISTING 2” GRSC CONDUIT

APPROXIMATELY 24” DEEP CONTAINING #8, 5KV AIRFIELD

LIGHTING CONDUCTORS FOR CIRCUITS SHOWN. PROTECT

THE CONDUIT AND CONDUCTORS DURING CONSTRUCTION

ACTIVITIES.

16. WITHIN CONDUIT INDICATED REMOVE AND DISPOSE OF

CONDUCTORS FOR CIRCUITS 10L-28R AND 10LCL OFF PORT

PROPERTY. PROTECT EXISTING CONDUCTORS IN CONDUIT.

17. AT POINT INDICATED IS AN AIRCRAFT GUIDANCE SIGN ON A

CONCRETE FOUNDATION. REMOVE AND PROTECT

GUIDANCE SIGN AND SAVE FOR REINSTALLATION. INSTALL

CF SHORTING DEVICE ON SECONDARY OF TRANSFORMER.

REINSTALL COVER PLATE TO ACCOMMODATE PAVING

WORK.

18. AT POINT INDICATED IS AN EXISTING 1-1/2” IMC CONDUIT

APPROXIMATELY 5"-10” DEEP CONTAINING TWO #8, 5KV

AIRFIELD LIGHTING CONDUCTORS FOR CIRCUIT 10LBRT.

VERIFY CIRCUIT WITHIN THE CONDUIT AND LOCK OUT THE

CIRCUIT. REMOVE AND DISPOSE OF CONDUCTORS AND

CONDUIT OFF PORT PROPERTY.

19. AT POINT INDICATED IS AN EXISTING RUNWAY GUARD/STOP

BAR LIGHT. REMOVE AND PROTECT THE LIGHT FOR

REINSTALLATION AFTER PAVING WORK. FOR DETAILS OF

THE WORK SEE SHEET E4.02.

20. REMOVE FAA MALSR VAULT, DUCTS AND EQUIPMENT PER

EXHIBIT C, FAA DRAWINGS PDX -D-ALS10L.

21. AT LOCATION INDICATED IS AN EXISTING 3" TRANSITE DUCT

AND DIRECT BURIED WIRE TO REMAIN. NOTIFY THE PORT IF

ENCOUNTERED DURING CONSTRUCTION.

22. WITHIN CONDUIT INDICATED REMOVE AND DISPOSE OF

CONDUCTORS FOR CIRCUIT 10L-28R OFF PORT PROPERTY.

PROTECT EXISTING CONDUCTORS IN CONDUIT.

23. AT POINT INDICATED IS AN EXISTING 16" DIAMETER BASE

CAN WITH COVER PLATE. REMOVE AND DISPOSE OF BASE

CAN AND COVER PLATE OFF PORT PROPERTY.

LIMIT OF PAVEMENT

MILLING (TYP.)

LIMIT OF PAVEMENT

REMOVAL (TYP.)

M

AT

C H

LI

N

E

ST

A.

+0

- S

EE

S

H

EE

T E2

.0

DIGITALLY SIGNED
2026-10-08T09:11:22-0700
Jeff Nelson

File details come from the government source that posted it. Updated .