PDX 2026-501 (144) C8.02.pdf

PDF 552 KB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is a Civil Utility Removal and Adjustment Plan prepared for Portland International Airport in Oregon, specifically detailing utility modifications required for the North Runway Rehabilitation project. The plan addresses utility adjustments along Runway 10L-28R, covering the section from Station 251+00 to Station 262+00, and was developed in October 2026 as part of design project PDX 2026-501. The document provides technical specifications for utility work including removal, replacement, and adjustment of existing infrastructure to accommodate runway rehabilitation grading and construction activities.

The plan identifies specific utility assets requiring modification through a utility adjustment table that designates each structure with status codes indicating whether adjustments are necessary (ADJ), structures require removal and replacement at current location (RAR), or no adjustment is required with retention and protection in place (NAR). A cleanout structure (STSCO0002810) is specifically noted for removal of its top and cover to facilitate grading work, with sealing requirements to prevent debris entry during construction and subsequent reinstallation at the finished elevation. The drawing was prepared by HNTB Corporation and signed by registered professional engineer Hans N. Conradt, with design oversight from Gene Tupper and C. Eiseler, establishing the technical baseline for utility coordination during the runway rehabilitation execution phase.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
PDX 2026-501 (249) E5.17.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VV

V

VV

V

V

V co co co co co co co co co co co

VV

V V

V

V

V

V V

V

V

V J

J

J

J

J J

STS STS

STS

STS

STS

STS

ABAND

ABAND

ABAND

ABAND

COM

COM

COM

COM

COM

COMCOM

COM-FAA

COM-FAA

C O

M

-FAA

FA

A

E E

E

E

E E E E E

E

E

E

E

E

EEE

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

E

EE

E

EE

E

FW FW FW

FW

FW

STS

STS

E

STS

ST

SE

E

E

STS

STS

ABAND

SS

FW FW

TOFA TOFA TOFA TOFA

5+

0+ co

RUNWAY 10L-28R

TAXIWAY A6

TAXIWAY A

4 SEE NOTE 4 AND DETAIL

TWY A TOFA

UTILITY ADJUSTMENT TABLE

STATION

254+41.91

OFFSET

284.12 RT

ASSET

ID # DESCRIPTION

CLEANOUT

EX.

ELEV.

27.76

FIN.

ELEV.

ADJ.

DETAIL

STSCO0002810 27.72 RAR

SCALE:

RUNWAY 10L-28R STA 251+00 TO STA 262+00

1" = 50'1

10/6/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:47:31 PM NCHOWDHURY c:\users\nchowdhury\dc\accdocs\hntb corporation\88598 - pdx north runway rehab\project files\shared cad\sheets - civil\utility adjustment plans.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

CIVIL UTILITY REMOVAL AND ADJUSTMENT PLAN

RUNWAY 10L-28R STA 251+00 TO STA 262+00

GENE TUPPER

C. EISELER

N. CHOWDHURY

H. CONRADT

OCTOBER 2026

144 CD

PDX 2026-501 C8.022024D011 102981

KEY PLAN

SCALE : N.T.S.

N

N

SCALE: IN FEET

100500 25 150

NAR = NO ADJUSTMENT REQUIRED (RETAIN AND PROTECT)

ADJ = ADJUST STRUCTURE TO NEW FINISHED ELEVATION

RAR = REMOVE AND REPLACE AT CURRENT LOCATION

LIMITS OF PAVING

LEGEND:

NOTE(S):

C9.11

1. STATION OFFSET IN UTILITY ADJUSTMENT TABLE BASED

ON RUNWAY 10L-28R CENTERLINE.

2. SEE ELECTRICAL REMOVAL PLANS FOR ELECTRICAL

UTILITY REMOVALS IN THIS AREA

3. ALL UTILITIES NOT DESIGNATED FOR REMOVAL SHALL BE

PROTECTED IN PLACE

4. REMOVE CLEANOUT TOP AND COVER TO

ACCOMMODATE GRADING WORK. SEAL TOP OF PIPE TO

PREVENT DEBRIS FROM ENTERING THE PIPE.

FOLLOWING COMPLETION OF GRADING, REMOVE

SEALING MATERIAL AND INSTALL NEW TOP AND COVER

AT FINISH ELEVATION.

co CLEANOUT

RE

G ISTERED PROFESS IONALENG I NEER

MARCH 9 , 1999

60434PE

OREGON

12/31/27EXPIRES:

HA NS N . CONRA DT

2026-10-06T17:18:44-0700
Hans N Conradt

File details come from the government source that posted it. Updated .