PDX 2026-501 (292) E8.14.pdf
PDF 750 KB Posted
- Solicitation number
- 147231
- Issued by
- Multnomah County, Oregon
About this file
This is an electrical circuit connection schematic for the Portland International Airport North Runway Rehabilitation project in Portland, Oregon. The drawing depicts the taxiway A electrical circuitry layout, including circuit connections, runway designations (Runway 10R-28L), taxiway designations (TW A, TW B, TW C, TW E, TW K, TW Q, TW T), and concourse locations (Concourse B, C, D, and E). The schematic is dated October 2026 and was prepared by the design team including Gene Tupper, M. Tieaskie, M. Dettmer, and J. Nelson, a registered professional engineer in Oregon with license expiration of December 31, 2026. The drawing was finalized on February 11, 2026, and the project number is PDX 2026-501 with drawing number E8.14.
The schematic includes a note indicating that no lights on the circuit are expected to be impacted by the project; however, circuit conductors may be encountered within the work areas. The drawing is scaled at 1 inch equals 200 feet and includes a graphic scale for reference. The document is digitally signed and certified as a legal drawing. The design incorporates lighting configuration details and electrical routing information essential for contractors performing rehabilitation work on the north runway infrastructure at Portland International Airport.
View the file
Other files
Show 40 more
Latest 50 of 308 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B2C3C5C7C9C11C13C15C17C19
C21
C
C22
C18
C16
C14 C 12 C10 C8
C6
D6D8D10D12
D
D
LANE
ONLY
LANE
ONLY
LANE
ONLY
POLICE
PARKING
OPS
PARKING
PO
LI
C E
PA
R
KI
N
G O
N L
Y
POLICE
PARKING
POLICE
PARKING
3A
1A
14A
B3
C20
11 - 12
B4
B5
B6
B7
B8
B9
B10
B11
C 23A
2 3
4A
4 5 6
THRU
THRU
THRU
C4
D4
D13 D11 D9 D7 D5 D3 E2 E3 E4 E5
3 4 5 6
STOP
STOP
E6 E7 E8 E9 E10 E11 E12 E13B E13A
4A2
3A
TE
R
M
IN
AL
RUNWAY 10R - 28L
TW B
TW T
TW
T
CONCOURSE C
CONCOURSE D
B3 B4 B5
E3
V
TW K
R U
N W
AY
-2
TW C
B6
B8
C
C
K1
K
A6
SERVICE ROAD
SERVICE RD
TW A
E2
TW
E
PO
R
T H
Q ATCT
C.U.P.
TW
T
Q.T.A.
CONCOURSE E
CONCOURSE B
A5
A4
JUL Y 2 5 , 1991
JEFFERY L. NELSON
EXP: 12/31/2026
ENGINEER
RE
GIS
TERED PROFESSIONAL
OREGON
15521PE
N
SCALE: IN FEET
0' 100' 200' 400' 600'
2/11/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:44:34 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\CIRCUIT CONNECTION SHEETS\TAXIWAY A ELECTRICAL CIRCUITRY.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
NORTH RUNWAY REHABILITATION
CIRCUIT CONNECTIONS
TAXIWAY AWCLa CIRCUIT CONNECTION
GENE TUPPER
M. TIEASKIE
M. DETTMER
J. NELSON
OCTOBER 2026
292 CD
PDX 2026-501 E8.142024D011 102981
SCALE:
TAXIWAY AWCLa CIRCUIT CONNECTION
1" = 200'1
NOTE:
1. NO LIGHTS ON THIS CIRCUIT ARE EXPECTED TO BE IMPACTED
ON THIS PROJECT, HOWEVER CIRCUIT CONDUCTORS MAY BE
ENCOUNTERED WITHIN THE WORK AREAS.
| DIGITALLY SIGNED | |
| 2026-10-08T09:19:07-0700 | |
| Jeff Nelson |
File details come from the government source that posted it. Updated .