This document is an Aircraft Guidance Sign Schedule and electrical plan sheet for the Portland International Airport North Runway Rehabilitation project in Oregon. The sheet, dated October 2026 and prepared by the airport's design and engineering team, details the specifications and locations for guidance sign installations and modifications along Runway 10L-28R. The project involves the provision, installation, and relocation of various aircraft guidance signs at specified stations and offsets along the runway centerline, with work including the demolition of existing foundations, installation of new precast concrete foundations, removal and replacement of sign message panels, and electrical connections to circuits GS10L and GSA. Key sign installations include multiple 48-inch signs (10L-1 through 10L-10) with white-on-black messaging, 85-inch signs with various color schemes (yellow-on-black, black-on-yellow, and white-on-red), and 127-inch signs. The schedule specifies isolation transformer requirements ranging from 100 to 300 watts and includes provisions for sign removal and storage during paving work with reinstallation upon completion.

The technical specifications require sign faces to be set perpendicular to adjacent taxiway centerlines, with all station and offset measurements based on Runway 10L-28R centerline alignment per referenced detail sheets. Electrical work includes the installation of new isolation transformers, ground rods with enclosures, and conduit connections, with specific attention to reusing existing isolation transformers where applicable and removing disposal of obsolete sign message panels. The document is signed by Jeffery L. Nelson, a registered professional engineer in Oregon (PE #15521), with an expiration date of December 31, 2026, and was digitally signed on October 8, 2026. The sheet references additional detailed work requirements contained in sheets E7.06 through E7.15 and foundation details in sheet E7.01, indicating this is part of a comprehensive set of construction documents for the runway rehabilitation project.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

308+73.56 150.09' LT

298+73.43 151.02' LT

288+73.48 150.43' LT

278+73.41 150.32' LT

268+73.22 150.01' LT

258+73.54 150.39' LT

248+73.45 150.39' LT

238+73.65 150.08' LT

227+61.64 125.56' LT

239+64.05 130.75' LT

A4-11 A

B

A

GS10L

AIRCRAFT GUIDANCE SIGN SCHEDULE (SEE KEY NOTES FOR STATIONING AND OFFSET)

SIGN

NUMBER SIDE

AP

PR

O

XI

M

AT

E

SI

G N

L

EN

G

TH

(I N

C H

ES

PR

O

VI

D

E

AN

D

IN

ST

AL

L N

EW

F

O U

N D

AT

IO

N

D

EM

O

LI

SH

E

XI

ST

IN

G

FO

U

N D

AT

IO

N

IN

ST

AL

L

SI

G

N O

N

EX

IS

TI

N G

F O

U N

D

AT

IO

N

CIRCUIT FROM

IN

ST

AL

L

N

EW

P F

SI

G

N

BA

SE

C

AN

A N

D P

F

XF

M R

SIDE SIGN COLOR NOTE STATION OFFSET

NEW OR

EXISTING

SIGN

MESSAGE

IN

ST

AL

L

N

EW

P F

SI

G

N

AN

D

IS

O

LA

TI

O

N X

FM

R

N

EW

C O

N D

U

IT

C O

N N

EC

TI

O N

A N

D C

O N

D U

C

TO

R

IN

ST

AL

L

SI

G

N

IN

AC

P

SH

O

U

LD

ER

KEY NOTE(S):

1. SIGN FACE SHALL BE SET PERPENDICULAR TO ADJACENT TAXIWAY

CENTERLINE UNLESS OTHERWISE NOTED.

2. VERIFY SIGN LENGTH WITH THE PORT.

3. STATION AND OFFSET BASED ON RUNWAY 10L-28R CENTERLINE ALIGNMENT,

SEE DETAIL 1 SHEET E7.02 FOR STATION AND OFFSET REFERENCE POINT.

4. REMOVE SIGN AND STORE IN A SAFE LOCATION. REINSTALL SIGN UPON

COMPLETION OF PAVING WORK. REUSE EXISTING ISOLATION TRANSFORMER.

5. FOR 170" SIGN PLACE ONE 146" PRECAST CONCRETE FOUNDATION ADJACENT

TO ONE 62" PRECAST CONCRETE FOUNDATION . APPLY P-606 SEALANT

BETWEEN FOUNDATION JOINTS.

6. GUIDANCE SIGN TO REMAIN IN PLACE. REMOVE AND DISPOSE OF SIGN MESSAGE

PANEL SIDE B AND INSTALL NEW PF SIGN PANEL SIDE B TO REVISE MESSAGE.

7. REINSTALL GUIDANCE SIGN 10L-9 AT LOCATION SHOWN WITH NEW CF

FOUNDATION, CF GROUND ROD, CF GROUND ROD ENCLOSURE AND PF BASE

CAN. PROVIDE AND INSTALL NEW 100 WATT, 6.6/6.6 AMP ISOLATION

TRANSFORMER AND CONNECT TO CIRCUIT GS10L.

8. INSTALL NEW CF GROUND ROD AND GROUND ROD ENCLOSURE. GUIDANCE SIGN

TO REMAIN. SEE SHEETS E7.06 THROUGH E7.15 FOR INDIVIDUAL SIGN WORK

REQUIREMENTS.

A4-12 A

B

A

B

GSA

A4-13 A

B

127 GSA

X X

NOTE(S):

1. SEE SHEET E7.01 FOR FOUNDATION DETAILS.

JUL Y 2 5 , 1991

JEFFERY L. NELSON

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

15521PE

B

PF

IS

O

LA

TI

O

N

TR

AN

SF

O R

M

ER

S

IZ

E (W

AT

TS

150W

100W

1/22/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:34:04 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\SIGN RELOCATION SHEETS - N RUNWAY.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

GUIDANCE SIGN PLANS AND DETAILS

AIRCRAFT GUIDANCE SIGN SCHEDULE 2

GENE TUPPER

M. TIEASKIE

M. DETTMER

J. NELSON

OCTOBER 2026

268 CD

PDX 2026-501 E7.052024D011 102981

SCALE:

AIRCRAFT GUIDANCE SIGN SCHEDULE 2

NONE1

A6-1 A

B

A

GSA

T-1 A

B

A

B

GSA

EA-1

A

B

43 GS10L

X

X

K

YEL ON BLK

BLK ON YEL

B

100W

100W

100W

K-4 A

B

85 GSK

XK-5

A

B

127 GS10L

X 4200W

300W

4K-6 A

B

A

GS10L

YEL ON BLK

300W

X

X

X

X

X

X

X

X

XX

X

X

A

B

BLK ON YEL

A

B

A

B

WHT ON RED

YEL ON BLK

B

A

T

K1

10LK1

XX

10L-28RA4

A5

A6

T

E

10L K1

K1 X

X

A

B

BLK ON YEL

YEL ON BLK

WHT ON RED

BLK ON YEL

BLK ON YEL

BLK ON YEL

BLK ON YEL

YEL ON BLK

WHT ON RED

W-9 A

B

85 GSAX 100WX X

A

B

A3

BLK ON YEL

284+39.67 280.00' RT

276+47.06 130.83' RT

276+19.02 496.11' RT

264+99.44 132.52' RT

236+98.79 151.25' RT

240+37.67 130.40' RT

227+26.51 125.43' RT

224+05.55 279.96' RT

226+12.97 280.02' RT

292+53.71 130.38' RT

810L-1 A

B

48 GS10L 100W

1 A

B WHT ON BLK

WHT ON BLK

810L-2 A

B

48 GS10L 100W

2 A

B

810L-3 A

B

48 GS10L 100W

3 A

B

810L-4 A

B

48 GS10L 100W

4 A

B

810L-5 A

B

48 GS10L 100W

5 A

B

810L-6 A

B

48 GS10L 100W

6 A

B

810L-7 A

B

48 GS10L 100W

7 A

B

810L-8 A

B

48 GS10L 100W

8 A

B

710L-9 A

B

85 GS10L X100WX

10L A

B -

YEL ON BLK

XX

810L-10 A

B

85 GS10L 100WX

10L

- A

B YEL ON BLK

XX

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

WHT ON BLK

DIGITALLY SIGNED
2026-10-08T09:17:23-0700
Jeff Nelson

File details come from the government source that posted it. Updated .