PDX 2026-501 (243) E5.11.pdf

PDF 369 KB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is an electrical design detail drawing for the Portland International Airport North Runway Rehabilitation project located in Oregon. The document provides technical specifications for the reinstallation and installation of two types of elevated airfield lighting systems: runway guard lights and red elevated stop bar lights. Both lighting installations are to be positioned in shoulder AC pavement and include specific requirements for aim angles (5 degrees and 20 degrees up from horizon, respectively), conduit routing, grounding systems, and structural components such as frangible couplings, base cans, and PVC ground rods. The drawing was prepared by the design team including Gene Tupper, M. Tieaskie, M. Dettmer, and registered professional engineer J. Nelson (PE 15521), with a date of October 2026 and a design expiration of December 31, 2026.

The technical specifications detail precise installation requirements including 2-inch PVC ground rods measuring 3/4 inch diameter and 10 feet long, 12-inch diameter by 24-inch deep base cans, #6 bare copper conductors to be connected via exothermic weld, and grommeted conduit extensions. Grounding must be positioned a minimum of 12 inches from the base can with the top of the ground rod at least 6 inches below finished surface. Conduit shall extend 2 inches into the can after backfilling and stabilization, with silicone sealant applied between flange rings and extensions. The drawing references related details on sheet E5.04 and includes general notes addressing installation procedures, grounding specifications, and finishing requirements for both lighting systems.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING ELEVATED RUNWAY GUARD

LIGHT TO BE REINSTALLED. AIM LIGHT

5 DEGREES UP FROM HORIZON

BREAKABLE COUPLING

EXISTING TETHER TO

BE REINSTALLED

SEE NOTE 1 (TYP.)

2" PVC

GROUND ROD

SEE NOTE 3

PF L-867 12" DIA. x 24"

DEEP BASE CAN

2" PVC WHEN REQUIRED

EXISTING OR NEW

ACP DEPTH VARIES

PF FLANGE RING

CONDUIT TYP. 24"

BELOW FINISH GRADE

#6, BARE

CONDUCTOR

(SEE NOTE 2)

PF 3" EXTENSION

BOND BASE PLATE TO BASE CAN WITH

CF 30" BRAIDED GROUND STRAP AND

CF GROUND LUG

#6 AWG

COUNTERPOISE,

SEE DETAIL

APPLY SEALANT, SEE DETAIL 2

E5.04

4' MIN.

6" M

IN

E5.08

EXISTING RED ELEVATED STOP

BAR LIGHT TO BE REINSTALLED.

AIM LIGHT 20 DEGREES UP

FROM HORIZON

2" EMT ON FRANGIBLE

COUPLING TO BE

REINSTALLED

APPLY SEALANT,

SEE DETAIL

SEE NOTE 1 (TYP.)

2" PVC

GROUND ROD

SEE NOTE 3

PF L-867 12" DIA. x 24"

DEEP BASE CAN

2" PVC WHEN REQUIRED

4" MIN.

CONDUIT TYP. 24"

BELOW FINISH GRADE

P-610 CONCRETE

6" M

IN

EXISTING OR NEW ACP

DEPTH VARIES

#6, BARE

CONDUCTOR

(SEE NOTE 2)

PF 3" EXTENSION

BOND BASE PLATE TO BASE CAN WITH CF 30"

BRAIDED GROUND STRAP AND CF GROUND LUG

E5.04

#6 AWG

COUNTERPOISE,

SEE DETAIL 3

E5.08

GENERAL NOTE(S):

1. CONDUIT SHALL EXTEND INTO CAN 2” AFTER DUCT IS

BACKFILLED AND LENGTH HAS STABILIZED.

GROMMETS WILL BE FURNISHED WITH THE BASE CAN

AND SHALL BE USED FOR CONDUIT INSTALLATION

INTO BASE CAN. INSTALL END BELL ON CONDUIT.

2. #6 BARE COPPER CONDUCTOR SHALL BE

CONNECTED TO GROUND ROD AND BASE CAN WITH

A EXOTHERMIC WELD.

3. GROUND ROD SHALL BE 3/4” DIA. 10' LONG AND

INSTALLED A MINIMUM OF 12” FROM BASE CAN. TOP

OF GROUND ROD SHALL BE A MINIMUM OF 6" BELOW

THE FINISHED SURFACE.

4. FOR TYPICAL DIMENSIONS OF CORE DRILLED HOLES

FOR INSTALLATION OF EXTENSIONS ON BASE CANS,

SEE SHEET E5.04, DETAIL 3.

5. APPLY SILICONE SEALANT BETWEEN FLANGE RING

AND EXTENSION.

JUL Y 2 5 , 1991

JEFFERY L. NELSON

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

15521PE

7/14/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:32:23 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\INPAVEMENT STOP BAR LIGHT INSTALLATION DETAILS.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

ELECTRICAL DETAILS

ELECTRICAL DETAILS 8

GENE TUPPER

M. TIEASKIE

M. DETTMER

J. NELSON

OCTOBER 2026

243 CD

PDX 2026-501 E5.112024D011 102981

SCALE:

L-862S ELEVATED RED STOP BAR LIGHT IN SHOULDER AC PAVEMENT

N.T.S.1 SCALE:

L-804 ELEVATED RUNWAY GUARD LIGHT IN SHOULDER AC PAVEMENT

N.T.S.2

DIGITALLY SIGNED
2026-10-08T09:15:36-0700
Jeff Nelson

File details come from the government source that posted it. Updated .