PDX 2026-501 (213) E4.03.pdf

PDF 1 MB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is an Electrical Lighting Plan drawing for the Portland International Airport North Runway Rehabilitation project in Oregon, specifically detailing lighting infrastructure for Runway 10L-28R from station 230+00 to station 241+00. The drawing, prepared by the airport authority's design team and dated October 2026, provides comprehensive specifications for the installation, reinstallation, and removal of runway and taxiway lighting fixtures as part of the runway rehabilitation work. Key work items include runway centerline lights, runway edge lights (both elevated and in-pavement LED fixtures), touchdown zone lights, threshold lights, runway guard/stop bar lights, taxiway edge lights, and associated electrical conduit and conductor installations. The project requires coordination with FAA Approach Lighting System (ALSF-2) work and includes detailed specifications for light can dimensions, transformer specifications (primarily 6.6/6.6 AMP isolation transformers), wattage ratings (ranging from 15 to 65 watts), and conductor types (#8 and #6, 5KV airfield lighting conductors). Work must be coordinated with concurrent milling and paving operations, with specific timing requirements for installation phases relative to final lift paving completion.

The drawing contains 24 detailed key notes outlining specific installation requirements, including core drilling for in-pavement lights prior to final paving lift, sawcutting requirements for conduit installation in concrete encasement using 2-inch PVC, removal and protective storage of existing fixtures for reinstallation, and replacement of transformers and associated hardware. Several notes reference additional specification sheets (E5.03, E5.05, E5.06, E5.07, E6.01, E6.02, E6.04, E6.05, E6.07, E7.01-E7.15) and removal information sheets (E2.03, E3.03, E4.02, E4.14). The project is registered under design number 102981 with project number PDX 2026-501, drawing number CD 213, and is aligned with FAA design standards per exhibit drawings PDX-D-ALS10L. The professional engineer stamp indicates registration number PE 15521 with an expiration date of December 31, 2026, and the drawing was printed on December 11, 2024.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VV

V

VV

V

V

V V

V

V

V

VV

V

V

VV

V

V

V

V

VVVVV

V

J

J

J J

J

J

J J

J

JJJ

J

J

J

J

J

JJ

J

COM

COM

C O

M

C O

M

COM

C O

M

COM

CO

M

COM

CO

M

COM

COM

COM

FAA FAA

FAA

FAA

FAA

FAA

FAA

E

E

EE

E

E

E E

EE

E

E

E E

E

E

EE

E

E

E

E

E

E E E

E E E E E E E

EE

E

E E

E

E E

E

E

E E

E

E

E E

E

E E

E E

E

E

E

E

E

EE

E

E

E E

E

E

E E

E

E

E

E

E E

E E

E

E E

E

E

E

E

E

E

E

EE

10L-8

10L-10

T-1

EA-1

EA-10

EA-6

EA-2

T-3

T-2

E

E

T-8

EA-17

EA-1

10L-8

10L-10

E

E

COM

T-1

AW

K

AW

SPARE (EBRT)

1-2" PVC

AW

AW

3-LAHSO-E1

AW

CLb

AW

CL

a

AW

CL

b

AW

C

La

GSA

AW

CLb

AW

CLa

AW

C

Lb

AW

CLb

AW

CL

b

AW

CLa

1- 2"

P

VC

AW

G

SAP

A W G S

A P

AW

G

SA

P

G

SA

G

SA

P

G S1

0L

GSA(2)

GSAP(1)

AW(1)

GS10L GSA

(2) AHBY

G

SA

LW

W

IN 2" PVC

(2) ASBR

AW

GS10L

GSA

EN

AW

AW

AW

AW

AW

AW

G

SEG

S10L

GSE

G

SE

G S1

0L

G S1

0L

G S10L

G S10L

G S10L

G

SE

(2)3-21HB

(2)3-21WW

IN 2" PVC

G

SE

G S1

0L

K

G

SA

G

SA

T

T

AW

AW

AW

GS10L

G

SE

G S1

0L

GS10L

AW

KCLa

KCLb

GSE

G S1

0L

EN

EN

EN

ENGSEGS10L

ENGSE

ENGSE

ENGSE

ENGSE

ENGSE

EN

GSEEN

G

SE

GS3-21

KCLaKCLb

K C

La K

C Lb

KCLa KCLb

1- 2"

G R

S C

KCLa

EN T

T

AW

K

AW AW AW AW

AW

AW

AW

AW

AW

GS10LEN

G

SE

G

SK KC

La

KC

Lb

LB

RT

GSEEN

AHBYASBR10LWW

(2) AHBY

(2) 10L-WW

G S1

0L

ENG

SE

GSEEN

GSE

EN

G S1

0L

GSEGS10L

G

SEEN

G

SE

EN

EN

G

SE

EN

GS10L

GS10L

GS10LAW

LW

W

1-2" PVC

LW

W

AH

BY

AS

BR

G

SKKC

La

KC

Lb

K 10

LB

RT

AH

BY

AS

BR

G S

10L

G S1

0L

G

SE

GSE

1-2" PVC

G

SE AW

CLa

AW

CLb

AW

C

La

AW

CLa

AW

CLb

AW

CLa

AW

CLb

GSK

GSK

G S

K

T

GSKK

G

SK

T

KCLa

KCLb G

SK

K

GSE

EN

AW

10LW

W

ENGSE

AW

CLa

GSK

GSAP

AWCLa

AWCLb

ASBR

ASBR

AS

BR

LW

W

10LWW

LW

W

GS10L

G S1

0L

A H

B Y

AHBY

AH

BY

GSA

K

K

K

GSE

KCLb

T

ENEN

EN GSK

G

SE

G

SE

G

SE

G

SE

AW

KC

Lb

KC

La

KCLb

KCLa

KC

La

KCLb KCLa

KCLb KCLa

KCLb KCLa

KCLa

KC

Lb

KC

LaKC

Lb

KC

La

KCLb KCLaKCLb

KCLa KC Lb

KC

La

KC

Lb

KC

La

KC

Lb

KC

La

KCLb

KCLa KCLb

KCLa KCLb

KCLa KCLb

KCLa

KCLb KCLa

KCLb KCLa

KCLb KCLa

KCLb KCLa

KCLa

KCLaKCLb

GSAP

GSAP

GSAP

GSK

AW

CL

a

AW

CL

a

AW

CL

b

AW

CL

b

ENCLaENCLbKC La

KC

Lb

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

LC

L

L-

R

L-

R

L-

R

L-

R

L-

R

L-

R

10L-28R

L-

R

10L-28R

L-

R

L-

R

L-

R

L-

R

L-

R

L-

R

L-

R

10L-28R

LT

D Z

LT

D Z

LT

D Z

LT

D Z

LT

D Z

G S1

0L

G S1

0L

10L-28R 10L-28R 10L-28R

G S10L

10L-28R 10L-28R 10L-28R

GS10L

G S1

0L

G S1

0L

G S1

0L

G S1

0L

GS10L

G S1

0L

C O

ME E E

E

FA

A

FA

A

E

E E E

E

E

E E

J

A A A

AA

AA

A

A A A A

A A

AAAAA

A A A A

A A A A A A

AA

AA

A A A A A A A A A

A A

AAAAA

A A A A

A A

AA

AA

A

A A A A

A A

AAAAA

A A A A

A A

AA

AA

A

A A A

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A

0+

5+

0+

001 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1

TA

XI

W

AY

T

TA

XI

W

AY

E

℄ RUNWAY

10L-28R

TAXIWAY A

2 2 2 2 2 2

2 2

44 4

TYP.

TYP.

TYP.

TYP.

FAA DESIGN, TYPICAL. SEE

EXHIBIT C, DRAWINGS

PDX-D-ALS10L.

N

SCALE: IN Feet

100500 25 150

M

AT

C H

LI

N

E

ST

A.

+0

- S

EE

S

H

EE

T E4

.0

JUL Y 2 5 , 1991

JEFFERY L. NELSON

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

15521PE

12/11/2024

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

12:23:55 PM DETTMM R:\Aviation\PDX\2026\0501 - PDX NORTH RUNWAY REHAB\SHEETS - ELECTRICAL\ELECTRICAL LIGHTING PLANS.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

ELECTRICAL LIGHTING PLAN

RUNWAY 10L-28R STA 230+00 TO STA 241+00

GENE TUPPER

M. TIEASKIE

M. DETTMER

J. NELSON

OCTOBER 2026

213 CD

PDX 2026-501 E4.032024D011 102981

N

LOCATE PLAN

SCALE : N.T.S.

SCALE:

ELECTRICAL LIGHTING PLAN

RUNWAY 10L-28R STA 230+00 TO STA 241+00

1" = 50'1

M

AT

C H

LI

N

E

ST

A.

+0

- S

EE

S

H

EE

T E4

.0

NOTES:

1. STATION AND OFFSETS ON THIS SHEET ARE BASED

ON RUNWAY 10L-28R CENTERLINE ALIGNMENT.

2. FOR REMOVAL INFORMATION ASSOCIATED WITH

THIS DRAWING, SEE SHEET E2.03.

3. FOR GEOMETRY INFORMATION ASSOCIATED WITH

THIS DRAWING, SEE SHEET E3.03.

KEY NOTES:

1. JUST PRIOR TO FINAL LIFT PAVING, CORE DRILL

TO REINSTALL RUNWAY CENTERLINE LIGHT ON PF

L-868, 12” DIAMETER, 24” DEEP BASE CAN, PF 3”

EXTENSION, PF 3/4” THICK FLANGE RING AND CF

30/45 WATT, 6.6/6.6 AMP ISOLATION

TRANSFORMER. FOR INSTALLATION AND COLOR

DETAILS, SEE SHEET E5.03 AND SHEET E6.02.

2. UPON COMPLETION OF MILLING OPERATIONS,

AND PRIOR TO PAVING, SAWCUT TO INSTALL 2 #8,

5KV CONDUCTORS FOR CIRCUIT 10LCL IN

CONCRETE ENCASED 2” PVC BETWEEN LIGHTS.

SEE DETAIL 1, SHEET E5.07. COORDINATE

CONDUIT INSTALLATION WORK WITH FAA ALSF

WORK TO ROUTE CONDUIT THROUGH

CENTERLINE BARRETTE.

3. AT POINT INDICATED IS AN EXISTING RUNWAY

EDGE LIGHT WITH A 3/4” THICK FLANGE RING AND

3” EXTENSION. REMOVE AND PROTECT THE LIGHT

FOR REINSTALLATION AFTER PAVING WORK.

REMOVE AND DISPOSE OF TRANSFORMER,

FLANGE RING AND EXTENSION OFF PORT

PROPERTY. INSTALL PF TARGET PLATE OVER THE

LIGHT BASE TO ACCOMMODATE MILLING AND

PAVING WORK. AFTER PAVING WORK, EXTEND

THE LIGHT TO NEW FINISH ELEVATION WITH PF

3/4” THICK FLANGE RING AND PF 3” EXTENSION

PER SHEET E5.02. PROVIDE AND INSTALL NEW CF

45-WATT, 6.6/6.6 AMP ISOLATION TRANSFORMER.

FOR INSTALLATION AND LIGHT COLOR DETAILS

SEE SHEET E6.01.

4. PROVIDE AND INSTALL #8, 5KV CONDUCTORS IN

EXISTING 2” PVC OR GRSC BETWEEN LIGHTS FOR

CIRCUITS SHOWN.

5. PRIOR TO FINAL 6" OF AC PAVING, SAWCUT TO

INSTALL TOUCHDOWN ZONE BAR SET IN

CONCRETE. INSTALL SET OF THREE RUNWAY

TOUCHDOWN ZONE LIGHTS ON PF L-868, 12”

DIAMETER, 24” DEEP BASE CAN, PF 4.5”

EXTENSION, PF 3/4” THICK FLANGE RING AND CF

25-WATT, 6.6/6.6 AMP ISOLATION TRANSFORMER.

SEE SHEET E5.06. FOR INSTALLATION AND LIGHT

COLOR DETAILS SEE SHEET E6.04. PROVIDE AND

INSTALL CONCRETE ENCASED 2" PVC BETWEEN

LIGHTS AND #8, 5KV CONDUCTORS FOR CIRCUIT

10LTDZ.

6. PROVIDE AND INSTALL #8, 5KV CONDUCTORS IN

CONCRETE ENCASED 2” PVC BETWEEN SETS OF

RUNWAY TOUCHDOWN ZONE LIGHTS FOR

CIRCUITS SHOWN.

7. AT POINT INDICATED, REINSTALL IN-PAVEMENT

LED RUNWAY THRESHOLD LIGHT ON PF L-868, 12”

DIAMETER, 24” DEEP BASE CAN, PF 3” EXTENSION,

PF 3/4” THICK FLANGE RING AND CF 65-WATT,

6.6/6.6 AMP ISOLATION TRANSFORMER. SEE

DETAIL 1, SHEET E5.03. FOR INSTALLATION AND

LIGHT COLOR DETAILS SEE SHEET E6.05.

8. AT POINT INDICATED IS AN EXISTING 2” PVC

CONDUIT APPROXIMATELY 24” DEEP CONTAINING

1-#8 (GS10L),AND 1-#6 (10L-28R) 5KV AIRFIELD

LIGHTING CONDUCTORS. INTERCEPT CONDUIT

AND REMOVE CONDUCTORS AND DISPOSE OF

OFF PORT PROPERTY. EXTEND A NEW 2” PVC

CONDUIT BETWEEN NEW LIGHT CANS AND

EXISTING CONDUIT. PROVIDE AND INSTALL TWO

NEW #8, 5KV CONDUCTORS FOR CIRCUITS GS10L

AND 10L-28R AS SHOWN.

9. AT POINT INDICATED, REINSTALL ELEVATED LED

RUNWAY EDGE LIGHT ON PF L-867, 12” DIAMETER,

24” DEEP BASE CAN, PF 3” EXTENSION, PF 3/4”

THICK FLANGE RING AND CF 45-WATT,

6.6/6.6 AMP ISOLATION TRANSFORMER.

SEE DETAIL 1, SHEET E5.05. FOR

INSTALLATION AND LIGHT COLOR

DETAILS SEE SHEET E6.01.

10. PROVIDE AND INSTALL #8, 5KV CONDUCTORS IN 2”

PVC BETWEEN LIGHTS FOR CIRCUITS SHOWN.

SEE DETAIL 2, SHEET E5.07.

11. JUST PRIOR TO FINAL LIFT PAVING, CORE DRILL

TO REINSTALL IN-PAVEMENT LED RUNWAY EDGE

LIGHT ON PF L-868, 12” DIAMETER, 24” DEEP BASE

CAN, PF 3” EXTENSION, PF 3/4” THICK FLANGE

RING AND CF 65-WATT, 6.6/6.6 AMP ISOLATION

TRANSFORMER. SEE DETAIL 1, SHEET E5.03. FOR

INSTALLATION AND LIGHT COLOR DETAILS SEE

SHEET E6.01.

12. AT POINT INDICATED IS AN EXISTING 2” GRSC

CONDUIT APPROXIMATELY 24” DEEP CONTAINING

1-#6 (10L-28R) 5KV AIRFIELD LIGHTING

CONDUCTOR. INTERCEPT CONDUIT AND REMOVE

CONDUCTOR AND DISPOSE OF OFF PORT

PROPERTY. EXTEND A NEW 2” GRSC CONDUIT

BETWEEN NEW LIGHT CANS AND EXISTING

CONDUIT. PROVIDE AND INSTALL NEW #8, 5KV

CONDUCTOR FOR CIRCUIT 10L-28R AS SHOWN.

13. AT POINT INDICATED IS AN EXISTING RUNWAY

GUARD/STOP BAR LIGHT. TAKE CARE TO LABEL

EACH FIXTURE FOR REINSTALLATION AT EXACT

SAME LOCATION. REMOVE AND PROTECT THE

LIGHT FOR REINSTALLATION AFTER PAVING

WORK. BASE CAN, EXTENSION AND FLANGE RING

TO REMAIN IN PLACE. FOR MILLING AND PAVING

WORK, INSTALL CF SHORTING DEVICE ON

TRANSFORMER SECONDARY. INSTALL PF COVER

PLATE TO ACCOMMODATE PAVING WORK. UPON

COMPLETION OF PAVING WORK, REMOVE THE

COVER PLATE AND INSTALL NEW CF ISOLATION

TRANSFORMER PER SHEET E4.14. REINSTALL THE

LIGHT AFTER PAVING WORK IS COMPLETE.

RETURN THE COVER PLATE TO THE PORT.

14. AFTER MILLING OPERATIONS AND PRIOR TO

PAVING, SAWCUT TO INSTALL ONE CONCRETE

ENCASED 2” PVC FROM BASE CAN TO POINT

SHOWN. CAP AND SEAL CONDUIT AT POINT

INDICATED. SEE DETAIL 3, SHEET E5.07. SENSOR

WILL BE INSTALLED UNDER SEPARATE

CONTRACT.

15. INSTALL FAA THRESHOLD BAR, ALSF-2 VAULTS,

DUCTS AND EQUIPMENT PER FAA DRAWINGS PDX

-D-ALS10L.

16. INSTALL FAA ALSF-2 VULTS, DUCTS AND FLASHER

UNITS PER FAA DRAWINGS PDX-D-ALS10L.

17. AT POINT INDICATED IS AN EXISTING TAXIWAY

EDGE LIGHT WITH A ¾” THICK FLANGE RING AND

3” EXTENSION. REMOVE AND PROTECT THE LIGHT

FOR REINSTALLATION AFTER PAVING WORK.

PROVIDE AND INSTALL SHORTING DEVICE ON

SECONDARY OF THE ISOLATION TRANSFORMER.

REMOVE AND DISPOSE OF FLANGE RING AND

EXTENSION OFF PORT PROPERTY. INSTALL PF

TARGET PLATE OVER THE LIGHT BASE TO

ACCOMMODATE MILLING AND PAVING WORK.

UPON COMPLETION OF PAVING WORK, EXTEND

THE LIGHT TO NEW FINISH ELEVATION WITH PF

3/4” THICK FLANGE RING AND PF 3” EXTENSION

PER SHEET E5.02. REMOVE EXISTING

TRANSFORMER AND DISPOSE OF OFF PORT

PROPERTY. PROVIDE AND INSTALL NEW 15-WATT,

6.6/6.6 AMP ISOLATION TRANSFORMER. CONNECT

FIXTURE TO CIRCUIT AS SHOWN ON SHEET E6.07.

18. FOR DETAILS OF GUIDANCE SIGN INSTALLATION,

SEE SHEET E7.01 THROUGH E7.15.

KEY NOTES:

1. UPON COMPLETION OF PAVING OPERATIONS, REINSTALL

ELEVATED RUNWAY EDGE LIGHT WITH CF 45-WATT, 6.6/6.6 AMP

ISOLATION TRANSFORMER. CONNECT FIXTURE TO CIRCUIT

10L-28R. FOR COLOR DETAILS, SEE SHEET E6.01.

2. JUST PRIOR TO FINAL LIFT PAVING, CORE DRILL TO REINSTALL

ELEVATED RUNWAY EDGE LIGHT ON PF L-867, 12" DIAMETER, 24"

DEEP BASE CAN, PF 3" EXTENSION, PF 3/4" THICK FLANGE RING

AND CF 45-WATT, 6.6/6.6 AMP ISOLATION TRANSFORMER. FOR

INSTALLATION AND COLOR DETAILS, SEE SHEET E5.05 AND E6.01.

3. AT POINT INDICATED IS AN EXISTING 2" PVC CONDUIT

APPROXIMATELY 24" DEEP CONTAINING #6 AND #8 AIRFIELD

LIGHTING CONDUCTRS FOR CIRCUITS SHOWN. REMOVE

CONDUCTORS AND INTERCEPT CONDUIT AT NEW BASE CAN

LOCATION AND EXTEND TO NEW BASE CAN. PROVIDE AND INSTALL

NEW #8, 5KV CONDUCTORS FOR CIRCUITS SHOWN.

4. UPON COMPLETION OF MILLING OPERATIONS AND PRIOR TO

PAVING, SAWCUT TO INSTALL A 2" PVC CONDUIT BETWEEN LIGHT

CANS SHOWN. SEE DETAIL 3 SHEET E5.07.

5. COORDINATE CONDUIT INSTALLATION WORK WITH FAA ALSF-2

WORK TO ROUTE CONDUIT THROUGH THRESHOLD BAR.

6. UPON COMPLETION OF MILLING OPERATIONS AND PRIOR TO

PAVING , SAWCUT TO INSTALL 2 #8, 5KV CONDUCTORS FOR

CIRCUIT 10L-28R IN CONCRETE ENCASED 2" PVC BETWEEN LIGHTS.

DIGITALLY SIGNED
2026-10-08T09:13:24-0700
Jeff Nelson

File details come from the government source that posted it. Updated .