PDX 2026-501 (147) C8.05.pdf

PDF 518 KB Posted

Attached to
Portland International Airport North Runway Rehabilitation
Solicitation number
147231
Issued by
Multnomah County, Oregon

About this file

This is a Civil Utility Removal and Adjustment Plan prepared for the Portland International Airport North Runway Rehabilitation project in Oregon. The document serves as a technical drawing specification for utility management along Runway 10L-28R, detailing the removal, adjustment, and protection of existing utilities within the project area from Station 310+00 to Station 319+00. The plan identifies three specific utility assets requiring adjustment: a cleanout structure at Station 313+99.92 with finished elevation of 28.77 feet, a flush hydrant assembly at Station 318+24.66 with finished elevation of 28.64 feet, and three flush hydrant valves at Station 318+25.54 with finished elevation of 28.05 feet. All assets are referenced by their respective Asset IDs and current elevations, with specific offset measurements provided relative to the runway centerline. The project design was completed in October 2026, with the drawing certified by Professional Engineer Hans N. Conradt (Oregon PE #60434, expiring December 31, 2027).

The utility adjustment plan incorporates comprehensive protection and reconstruction protocols, including requirements to remove cleanout tops and covers to accommodate grading work, seal pipe openings to prevent debris intrusion, and reinstall components at final finished elevations upon grading completion. All utilities not explicitly designated for removal are to be protected in place during construction activities. The plan cross-references related electrical utility removal plans and additional detail sheets (C8.06, C9.11) for comprehensive project coordination. The drawing employs a graphic scale of 1 inch equals 50 feet and was optimized for viewing and printing with specific shading settings to ensure clarity of all plan elements.

View the file

Other files

File Type Posted
PDX 2026-501 (277) E7.14.pdf PDF
PDX 2026-501 (236) E5.04.pdf PDF
PDX 2026-501 (107) C7.01.pdf PDF
PDX 2026-501 (162) C9.11.pdf PDF
PDX 2026-501 (18) C1.10.pdf PDF
PDX 2026-501 (263) E6.13.pdf PDF
PDX 2026-501 (53) C4.06.pdf PDF
PDX 2026-501 (254) E6.04.pdf PDF
PDX 2026-501 (102) C6.08.pdf PDF
PDX 2026-501 (151) C9.00.pdf PDF
PDX 2026-501 (156) C9.05.pdf PDF
PDX 2026-501 (130) C7.24.pdf PDF
PDX 2026-501 (174) C10.11.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-501 (202) E3.05.pdf PDF
PDX 2026-501 (195) E2.11.pdf PDF
PDX 2026-501 (66) C4.19.pdf PDF
PDX 2026-501 (299) E8.21.pdf PDF
PDX 2026-501 (160) C9.09.pdf PDF
PDX 2026-501 (133) C7.27.pdf PDF
PDX 2026-501 (16) C1.08.pdf PDF
PDX 2026-501 (52) C4.05.pdf PDF
PDX 2026-501 (41) C3.15.pdf PDF
PDX 2026-501 (89) C5.14.pdf PDF
PDX 2026-501 (227) E4.17.pdf PDF
PDX 2026-501 (212) E4.02.pdf PDF
PDX 2026-501 (33) C3.07.pdf PDF
PDX 2026-501 (274) E7.11.pdf PDF
PDX 2026-501 (205) E3.08.pdf PDF
PDX 2026-501 (181) C12.02.pdf PDF
PDX 2026-501 (228) E4.18.pdf PDF
PDX 2026-501 (197) E3.00.pdf PDF
PDX 2026-501 (158) C9.07.pdf PDF
PDX 2026-501 (278) E7.15.pdf PDF
PDX 2026-501 (173) C10.10.pdf PDF
2026-14659 Project Manual.pdf PDF
PDX 2026-501 (137) C7.31.pdf PDF
PDX 2026-501 (211) E4.01.pdf PDF
PDX 2026-501 (10) C1.02.pdf PDF
PDX 2026-501 (144) C8.02.pdf PDF
PDX 2026-501 (159) C9.08.pdf PDF
PDX 2026-501 (237) E5.05.pdf PDF
PDX 2026-501 (106) C7.00.pdf PDF
PDX 2026-501 (97) C6.03.pdf PDF
PDX 2026-501 (256) E6.06.pdf PDF
PDX 2026-501 (191) E2.07.pdf PDF
PDX 2026-501 (140) C7.34.pdf PDF
PDX 2026-501 (135) C7.29.pdf PDF
PDX 2026-501 (186) E2.02.pdf PDF
PDX 2026-501 (207) E3.10.pdf PDF
Show 40 more

Latest 50 of 308 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VV

co coco co

V

VV

VV

V

ST

S

STS

STS

STS

STS STS STS

COM COM COM

COM

COM

C O

M

CO

M

COM

COM

COM

COM

COM

COM

COM

COM

C O

M

FA

A

FAAFAA

E

EFAA

E E E E

EE

E

E E

E E

E

E

E

E

E

E

E

E

E

EE

E

EE

E

E

E

EEE

E

FW FW

FW

FW

FW

FW

FW

STS

STS

E

STS

STS ST

S C

O M

STS

STS

TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA

0+

5+ co

TAXIWAY A

RUNWAY 10L-28R

TA

XI

W

AY

A

TAXIWAY A

SEE DETAIL

TWY A TOFA

SEE NOTE 4 AND

DETAIL

9SEE DETAILS

UTILITY ADJUSTMENT TABLE

STATION

313+99.92

318+24.66

318+25.54

OFFSET

120.50 RT

130.11 RT

171.69 RT

ASSET

ID # DESCRIPTION

CLEANOUT

FLUSH HYDRANT ASSEMBLY

FLUSH HYDRANT VALVES (3)

EX.

ELEV.

28.59

28.77

28.05

FIN.

ELEV.

ADJ.

DETAIL

28.77 NARWFH000001423

28.64 RARSTSCO0002797

28.05 RAR

WVLV00002973

WVLV00002974

WVLV00002975

SCALE:

RUNWAY 10L-28R STA 310+00 TO STA 319+00

1" = 50'1

10/6/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:47:53 PM NCHOWDHURY c:\users\nchowdhury\dc\accdocs\hntb corporation\88598 - pdx north runway rehab\project files\shared cad\sheets - civil\utility adjustment plans.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

NORTH RUNWAY REHABILITATION

CIVIL UTILITY REMOVAL AND ADJUSTMENT PLAN

RUNWAY 10L-28R STA 310+00 TO STA 319+00

GENE TUPPER

C. EISELER

N. CHOWDHURY

H. CONRADT

OCTOBER 2026

147 CD

PDX 2026-501 C8.052024D011 102981

KEY PLAN

SCALE : N.T.S.

N

N

SCALE: IN FEET

100500 25 150

NAR = NO ADJUSTMENT REQUIRED (RETAIN AND PROTECT)

ADJ = ADJUST STRUCTURE TO NEW FINISHED ELEVATION

RAR = REMOVE AND REPLACE AT CURRENT LOCATION

LIMITS OF PAVING

LEGEND:

NOTE(S):

1. STATION OFFSET IN UTILITY ADJUSTMENT TABLE BASED

ON RUNWAY 10L-28R CENTERLINE.

2. SEE ELECTRICAL REMOVAL PLANS FOR ELECTRICAL

UTILITY REMOVALS IN THIS AREA.

3. ALL UTILITIES NOT DESIGNATED FOR REMOVAL SHALL BE

PROTECTED IN PLACE.

4. REMOVE CLEANOUT TOP AND COVER TO

ACCOMMODATE GRADING WORK. SEAL TOP OF PIPE TO

PREVENT DEBRIS FROM ENTERING THE PIPE.

FOLLOWING COMPLETION OF GRADING, REMOVE

SEALING MATERIAL AND INSTALL NEW TOP AND COVER

AT FINISH ELEVATION.

C8.06

C9.11 co CLEANOUT

EXISTING FLUSH HYDRANT ASSEMBLY

EXISTING FLUSH HYDRANT VALVES

C8.06

C8.06

RE

G ISTERED PROFESS IONALENG I NEER

MARCH 9 , 1999

60434PE

OREGON

12/31/27EXPIRES:

HA NS N . CONRA DT

2026-10-06T17:22:21-0700
Hans N Conradt

File details come from the government source that posted it. Updated .