N62470-13-R-3011
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
| ATTACHMENT NUMBER |
| ATTACHMENT TITLE |
| J-1604000-01 |
| DEFINITIONS AND ACRONYMS |
| J-1604000-02 |
| REFERENCES AND TECHNICAL DOCUMENTS |
| J-1604000-03 |
| WASTEWATER COLLECTION SYSTEM DESCRIPTION AND INVENTORY |
Attachment J-1604000-01
DEFINITIONS AND ACRONYMS
| Facilities Maintenance Management |
| The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” |
| Repair |
| Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. |
| Replacement |
| Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. |
| Restoration |
| Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. |
| Sustainment |
| Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. |
| ANSI |
| American National Standards Institute |
| ASHRAE |
| American Society of Heating, Refrigerating and Air-Conditioning Engineers |
| ASME |
| American Society of Mechanical Engineers |
| MACP |
| Manhole Assessment and Certification Program |
| NASSCO |
| National Association of Sewer Service Companies |
| NPDES |
| National Pollutant Discharge Elimination System |
| PACP |
| Pipeline Assessment and Certification Program |
| SCADA |
| Supervisory Control and Data Acquisition |
| SRM |
| Sustainment, Restoration and Modernization |
| UFC |
| Unified Facilities Criteria |
| WEF |
| Water Environmental Federation |
Attachment 1604000-02
REFERENCES AND TECHNICAL DOCUMENTS
| EI 11C201 |
| Wastewater Collection and Pumping |
| MO-209 |
| Engineering Criteria |
| UFC 3-240-04A |
| Wastewater Collection |
| UFC 3-240-07FA |
| Sanitary and Industrial Wastewater Collection: Gravity Sewers and Appurtenances |
| UFC 3-240-09FA |
| Domestic Wastewater Treatment |
Attachment J-1604000-03
WASTEWATER COLLECTION SYSTEM DESCRIPTION AND INVENTORY
WASTEWATER COLLECTION SYSTEM (REGION)
| Bldg # |
| Equipment Description |
| Location |
| Technical Specifications |
| Qty |
| 752 |
| Buried gravity pipeline |
| Fitness/Rec. Center |
| 8” diameter |
| 60 lm |
| Sewer tank |
| Fitness/Rec. Center |
| 1 cu mt capacity |
| 2 |
| Inspection pit |
| Fitness/Rec. Center |
| 0.05 cu mt capacity |
| 1 |
| 752A |
| Underground concrete sewer tank |
| Manhole with cast iron covering |
| 1 |
Buried pressurized pipeline
| 3.15" diam., 4 ea. floor clean-outs |
| 100 lm |
| Submersible pump |
| Laundry Drain Pit |
| Idromec Mfcr., mod. PV/M 3/A, 1.5 HP, installed in the tank |
| 2 |
| Minimum level sensor |
| Laundry Drain Pit |
| Maximum level sensor |
| Laundry Drain Pit |
Control panel
| Feeding/controlling pump and sensors |
| 1 |
| Buried gravity pipeline |
| Laundry |
| 8” diameter |
| 20 lm |
| Sewer tank |
| Laundry |
| 1 cu mt capacity |
| 1 |
| Inspection pit |
| Laundry |
| 0.05 cu mt capacity |
| 2 |
| 757 |
| Underground concrete sewer tank |
| Trailers/Laundry |
| Manhole with cast iron covering |
| 2 |
| Buried pressurized pipeline |
| Trailers/Laundry |
| 3.15" diam. |
| 200 lm |
| Submersible pump |
| Trailers/Laundry |
| 1.5 HP, installed in the tank |
| 2 |
| Minimum level sensor |
| Trailers/Laundry |
| Maximum level sensor |
| Trailers/Laundry |
| Control panel |
| Trailers/Laundry |
| Feeding/controlling pump and sensors |
| 1 |
Note: Refer to attached system layout.
SHIP-TO-SHORE WASTEWATER PLANT (REGION)
Note:
The plant described below is currently non-operational; however, a PM Program per spec item 3.1 is still required.
| Equipment Description |
| Location |
| Manufacturer |
| Model/Type |
| Technical Specification |
| Qty |
| Air blower |
| Wastewater Tank |
| MAPRO |
| TURBOTRON |
| 250 m3/h |
| 1 |
| Butterfly valve on blower |
| Lift Station |
| VALSAR |
| WAFER G/1 |
| DN 125 |
| 1 |
| Check valve on blower |
| Lift Station |
| VALSAR |
| AISI 304 |
| DN 65 |
| 2 |
| Submersible pumps |
| Lift Station |
| FAGGIOLATI PUMPS |
| B210T3A30 |
| 50 m3/h |
| 3 |
| Ball valve on pump |
| Lift Station |
| RBR VALVOLE |
| Serie 10WAFER TYPE |
| 3" |
| 3 |
| Check valve on pump |
| Lift Station |
| FIL-PEMTO |
| D6666AISI 316 |
| 3" |
| 3 |
| Control panel for pumps |
| Lift Station |
| MANIERO ELETTRONICA |
| QTDE30/Kw-T |
| 5,5 Kw |
| 1 |
| Ultrasonic level meter |
| Lift Station |
| AUTOMATION PROGETTI |
| AP5117 - NT680E |
| 6 Digital Outputs |
| 1 |
| Ultrasonic level probe |
| Lift Station |
| AUTOMATION PROGETTI |
| AP5126 |
| 0.25m-5m |
| 1 |
| Electromagnetic flowmeter |
| Wastewater Tank |
| DANFOSS |
| MAG1100 - MAG 5000 |
| DN 8036-90 m3/h |
| 1 |
| Printer |
| Wastewater Tank |
| MJKII AUTOMATION |
| MJK 791 |
| 2 Timers with hr/24 - hr/yr valves |
| 1 |
| Autom. Feeder for Tank Cathodic Protection |
| Wastewater Tank |
| ELME |
| CP2 49V.8A. D.C. |
| Feeding 220 V, 50 Hz.Output current 8A |
| 1 |
| Zinc reference electrode |
| Wastewater Tank |
| SEAGUARD |
| S/D 30 X 400/2 |
| PE/POLIOLEFINA-0,6/1 kV, F1x16mm2 |
| 2 |
| Tubular anodes |
| Wastewater Tank |
| SEAGUARD |
| CPR-8C/CPR-10FW |
| 1", length 44" |
| 4 |
| Exhaust fan on tank |
| Wastewater Tank |
| DYNAIR |
| BOX-T 9/9 |
| Air flow: 2000 m3/h |
| 1 |
| Activated charcoal filters on tank |
| Wastewater Tank |
| FCR |
| P-CARB, PCA-1/12 |
| Size: 610x610x470 mm |
| 12 |
| General Control Panel PWW |
| Wastewater Tank |
| VEMER |
| PWW |
| Gen. Disconnect Switch.LED and Relays |
| 1 |
| Air blower control panel PWS |
| Wastewater Tank |
| VEMER |
| PWS |
| Disconnect switches. Thermal protection |
| 1 |
| Alarm Panel Q.AL 1 for lift station. |
| Pier |
| VEMER |
| Q.AL 1 |
| 230-400V/24V AC/DC. Relays R1,R2,RT2 |
| 1 |
| Alarm Panel Q.AL 2 for lift station. |
| Lift Station |
| VEMER |
| Q.AL 2 |
| 230-400V/24V AC/DC. Relays R1,R2,RT2 |
| 1 |
| Alarm Panel Q.AL 3 for lift station. |
| Next to B-752A |
| VEMER |
| Q.AL 3 |
| 230-400V/24V AC/DC. Relays R1,R2,RT2 |
| 1 |
GAETA WASTEWATER SYSTEM LAYOUT
Pressurized Pipeline
Gravity Pipeline
Italian Navy Pipeline
To City Sewer Line