RFP Attachment J.C-1 J-0200000 Attachments

68 KB Posted

Attached to
Base Operating Services for NSA Gaeta and NSA Gricignano, Italy
Solicitation number
N6247013R3011
Issued by

About this file

J.C-1 J-0200000

Text of this file

N62470-13-R-3011

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER
ATTACHMENT TITLE
J-0200000-01
DEFINITIONS AND ACRONYMS
J-0200000-02
REFERENCES, INSTRUCTIONS, DIRECTIVES
J-0200000-03
EXHIBIT LINE ITEM NUMBERS

Attachment J-0200000-01

DEFINITIONS AND ACRONYMS

DEFINITION
DESCRIPTION
Competent Person
A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
Confined Work Space
A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer (KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contractor
That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs
The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Equipment
Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility
A building or structure designed and created to serve a particular function.
Frequency Of Service
Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Maintenance and Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
Performance Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
That individual designated by the KO to be responsible for the monitoring of Contractor performance.
Pre-Expended Bin Materials and Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Quality Control (QC)
A method used by the Contractor to control the quality of goods and services produced.
Responsive Time
The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.

Attachment J-0200000-01

DEFINITIONS AND ACRONYMS

ACRONYM
TITLE
ACO
Administrative Contracting Officer
BW
Biweekly
CDR
Contract Discrepancy Report
CMMS
Computerized Maintenance Management System
COR
Contracting Officer Representative
DoD
Department of Defense
DoN
Department of Navy
DRMO
Defense Reutilization Management Office
EPA
Environmental Protection Agency
FAR
Federal Acquisition Regulation
FFP
Firm Fixed Price
FGS
Final Governing Standards
FSC
Facility Support Contract
GFE
Government-furnished Equipment
GFF
Government-furnished Facilities
GFM
Government-furnished Materials
GPWS
Guide Performance Work Statements
HCA
Head Contracting Agency
ICP
Integrated Contingency Plan
IDIQ
Indefinite Delivery Indefinite Quantity
IPM
Integrated Pest Management
KO
Contracting Officer
LAN
Local Area Network
M
Monthly
MSDS
Material Safety Data Sheets
NAVFAC
Naval Facilities Engineering Command
NMCI
Navy Marine Corps Intranet
PAP
Performance Assessment Plan
PAR
Performance Assessment Representative
PAW
Performance Assessment Worksheet
PM
Project Manager
PWS
Performance Work Statement
Q
Quarterly
QC
Quality Control
SM
Semimonthly
SPAR
Senior Performance Assessment Representative
US
United States
VIQ
Variation in Quantity
WBS
Work Breakdown Structure

Attachment J-0200000-02

REFERENCES, INSTRUCTIONS, DIRECTIVES

REFERENCE
TITLE
EM 385-1-1
U.S. Army Corps of Engineers Safety and Health Requirements
P.L. 91-596
Occupational Safety and Health Act
UFGS 01 35 26
Unified Facilities Guide Specifications
FGS
Final Governing Standards - Italy
n/a
Legislative Decree No. 81 dated 9 April 2008
n/a
Ministerial Decree No. 37 dated 22 January 2008
n/a
Safety at the Workplace as per the Ispettorato di Sicurezza Sul Lavoro (ISPESL) Regulations

Attachment J-0200000-03 EXHIBIT LINE ITEM NUMBERS (ELINs)

THE ELIN SCHEDULE IS PROVIDED AS A SEPARATE FILE

Other files

File Type Posted
Attachment_J.B-1_B-ELINs_(Revised_17_Jan_14).xlsx XLSX spreadsheet
SF30_0006.pdf PDF
0005_SF30.pdf PDF
GSS_BOS_J-1604000_Attachments_(Revised_24_Sept_13).doc DOC document
GSS_BOS_J-1503010-08 _Cust._Floor_Plans_(Revised_24_Sept_13).pdf PDF
SF30_0004.pdf PDF
Attachment_J.C-1_C-0200000_Management_and_Administration_(Revised_18_Sept_13).doc DOC document
SF30_0003.pdf PDF
Site_Visit_Roster.pdf PDF
Attachment_J.B-1_B-ELINs_(Revised_11_Sept_13).xlsx XLSX spreadsheet
0002_SF30.pdf PDF
Attachment_J.C-1_J-1604000_Attachments_(13_Sept_13).doc DOC document
13-3011_0001.pdf PDF
RFP Attachment J.C-1 C-1503020 Pest Control —
RFP Attachment J.M-1 Corporate Experience Questionaire.docx DOCX document
SF33_Solicitation.pdf PDF
RFP Attachment J.C-1 C-1503010 Custodial —
RFP Attachment J.C-1 J-1606000 Attachments —
RFP Attachment J.C-1 J-1700000 Attachments —
RFP Attachment J.C-1 J-1502000-08 PM Inventories —
RFP Attachment J.C-1 J-1503010-09 Cust. Room List —
RFP Attachment J.C-1 J-1503060 Attachments —
RFP Attachment J.C-1 J-1503010-08 Cust. Floor Plans —
RFP Attachment J.C-1 C-1503050 Grounds Maint Landscaping —
RFP Attachment J.B-1 B-ELINs —
RFP Attachment J.C-1 C-1606000 Water —
RFP Attachment J.C-1 0100000 General Information —
RFP Attachment J.C-1 C-1503030 ISWM —
RFP Attachment J.C-1 J-1503020 Attachments —
RFP Attachment J.C-1 C-1604000 Wastewater —
RFP Attachment J.F-1 Sect F Deliverables —
RFP Attachment J.C-1 J-1604000 Attachments —
RFP Attachment J.C-1 J-1503010-00 Attachments —
RFP Attachment J.C-1 J-1503030 Attachments —
RFP Attachment J.B-2 Preaward Inquiry Form.xlsx XLSX spreadsheet
RFP Attachment J.C-1 C-1502000 C Facility Investment —
RFP Attachment J.C-1 C-1700000 BSVE —
RFP Attachment J.M-2 Past Performance Questionaire.docx DOCX document
RFP Attachment J.B-3 Access Request Form.doc DOC document
RFP Attachment J.M-3 Full Time Equivalent —
RFP Attachment J.C-1 C-1503060 Pavement Clearance —
RFP Attachment J.E-1 JMC Instruction 4.pdf PDF
RFP Attachment J.C-1 C-0200000 Management and Administration —
RFP Attachment J.C-1 J-1503050 Attachments —
RFP Attachment J.C-1 J-1502000-00 Attachments —
RFP Attachment J.C-1 J-0100000 Attachments —
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .