N62470-13-R-3011
1503060 – Pavement Clearance
Table of Contents
| 1.1 |
| Concept of Operations |
| 2 |
| Management And Administration |
| 2.1 |
| Definitions and Acronyms |
| 2.3.1 |
| Equipment Restrictions |
| 2.3.2 |
| Work Identification |
| 3.1 |
| Pavement Sweeping Services |
| 3.1.1 |
| Roads and Other Paved Surfaces |
| 3.2 |
| Washing of Schools’ External Stairs |
1503060 - Pavement Clearance
| Spec Item |
| Title |
| Description |
| 1 |
| General Information |
| The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Pavement Clearance at NSA Naples, Italy, to include Gaeta Department and Gricignano Support Site. |
| 1.1 |
| Concept of Operations |
| The intent of 1503060 Pavement Clearance is to specify the requirements related to pavement sweeping. |
The following services are not included in this Template:
· Pavement sweeping of building perimeter areas. This is included in 1503010, Custodial.
· Emptying of exterior waste containers is included in 1503030, Integrated Solid Waste Management.
1503060 - Pavement Clearance
| Spec Item |
| Title |
| Description |
| 2 |
| Management And Administration |
| 2.1 |
| Definitions and Acronyms |
| Definitions and Acronyms are listed in J-1503060-01. |
| 2.2 |
| Personnel |
| The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently provide pavement sweeping services. |
| 2.3.1 |
| Equipment Restrictions |
| Equipment used shall have rubber type tires, tracks are not acceptable. |
| 2.3.2 |
| Work Identification |
| The Contractor shall identify and recommend IDIQ work as appropriate to the KO. |
1503060 - Pavement Clearance
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 3 |
| FFP Work |
| Contractor shall provide pavement clearance to achieve a cleared appearance and safe use of paved surfaces. |
Common Output Level Standards (COLS) are defined by Commander, Navy Installations Command (CNIC) for Navy Shore Commands. Services and associated frequencies are specified for the Base Measures of COL3 and COL4 as shown in J-1503050-02. The Contractor shall provide services at the frequencies specified based on the awarded CLINs (for the selected COL level) listed in Section B.
Customers not funded by CNIC receive services at the associated frequencies shown in J-1503010-03.
Paved surfaces are clear, safe, and passable in accordance with the specified COLS.
| 3.1 |
| Pavement Sweeping Services |
| The Contractor shall sweep paved surfaces to ensure paved surfaces are clear. |
| The Contractor shall provide pavement sweeping to remove winter abrasives and other debris, improve the appearance of paved areas, improve the safety of paved areas, reduce maintenance costs by keeping the drainage systems clean and reduce pollutants entering the storm drain system. |
Sweeping operations may be either manual or mechanical, at Contractor’s option.
Paved surfaces are swept per the schedule and in accordance with specified COLS and/or specified frequencies, as applicable.
| 3.1.1 |
| Roads and Other Paved Surfaces |
| The Contractor shall sweep roads and other paved surfaces to ensure they are clear. |
| Roads and other paved surfaces include roads, parking areas, sidewalks, walkways, porch areas, entrance/ canopy areas, external stairs/steps, recreational areas, bleachers, running track, and other similar areas identified on Site Maps provided in J-1503060-03. |
The Contractor shall identify specific times of performance for each road and other paved surface.
For areas funded by CNIC, the Contractor shall develop a schedule for pavement sweeping services consistent with the specified COLS in J-1503060-02 and submit per Section F.
Informational Note: The Government has found on previous contracts that a weekly sweeping of CNIC areas has maintained services at an acceptable level.
For areas not funded by CNIC, the Contractor shall provide pavement sweeping services at the frequencies specified in J-1503060-03.
Roads and other paved surfaces are clear in accordance with specified COLS and/or specified frequencies, as applicable.
| 3.2 |
| Washing of Schools’ External Stairs |
| The Contractor shall wash down School’s external stairs to ensure all spots, dirt, grease, and food residues are removed. |
| There are seven external stairs (total for both schools), concrete/marble type, leading from ground to first floor. |
The Contractor shall provide services at the frequency specified in J-1503060-03.
External stairs are washed at the specified frequency.
All spots, dirt, grease, and food residues are removed.
1503060 – Pavement Clearance
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 4 |
| IDIQ Work |
| IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The number of Contractor working days will be specified in each ELIN. |
| Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable. |