RFP Attachment J.C-1 J-1503060 Attachments

532 KB Posted

Attached to
Base Operating Services for NSA Gaeta and NSA Gricignano, Italy
Solicitation number
N6247013R3011
Issued by

About this file

J.C-1 J-1503060

Text of this file

N62470-13-R-3011

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER
ATTACHMENT TITLE
J-1503060-01
DEFINITIONS AND ACRONYMS
J-1503060-02
COMMON OUTPUT LEVEL STANDARDS – REGION
J-1503060-03
FREQUENCIES AND WORKING AREA – DODDS AREAS

J-1503060-01

DEFINITIONS AND ACRONYMS

DEFINITION/ACRONYMS
DESCRIPTION
Clear
Free of debris, as defined below.
Debris
Includes, but is not limited to, paper, cans, bottles, limbs and branches, pine straw and pinecones, leaves, sand, soil, aggregates, grass, metals, and other similar items.
Other Paved Surfaces
Include parking areas, sidewalks, walkways, porch areas, entrance/canopy areas, external stairs/steps, recreational areas, bleachers, running tracks, and other similar areas.

ATTACHMENT J-1503060-02

COMMON OUTPUT LEVEL STANDARDS - REGION

COMMON OUTPUT LEVEL STANDARDS

(COLS) CHART

SPEC ITEM
TASK
COL3

Base Measures

COL4

Base Measures

3.1.1
Roads and Other Paved Surfaces
Sweeping of primary and mission critical roads and piers.1

Prior to sweeping, roads and paved surfaces are free of visible sand, soil, aggregates, grass, leaves, debris, and other foreign matter with many allowable deviations.

IDIQ2

3.2
N/A
N/A
N/A

Note 1: Primary and mission critical roads and piers are indicated on the Site Map provided below.

Note 2: No recurring service is provided. This work will be ordered via IDIQ as required.

Gaeta Fleet Landing Map

ATTACHMENT J-1503060-03

FREQUENCIES AND WORKING AREA – DODDS AREAS

Spec Item
Task
Zone
Frequency
Approx. Area
3.1.1
Roads and Other Paved Surfaces
1A

On School Days(1): daily; work shall be completed by 0700 hr.

During Spring/Winter Recesses and Summer Period: 3 times a week (Mon-Wed-Fri) 8,900 m2

1B
On School Days(1): daily; work shall be performed after 1330 hr.

During Spring/Winter Recesses and Summer Period: 3 times a week (Mon-Wed-Fri) 21,600 m2

2
Weekly, throughout the year; work shall be performed after 1430 hr.
31,400 m2
3.2
Washing of Schools’ External Stairs (7 ea.)
n/a
3 times a week (Mon-Wed-Fri)
175 m2

(1) There are approx. 190 school days per year.

Support Site Schools Map

Primary Road

Other files

File Type Posted
Attachment_J.B-1_B-ELINs_(Revised_17_Jan_14).xlsx XLSX spreadsheet
SF30_0006.pdf PDF
0005_SF30.pdf PDF
GSS_BOS_J-1604000_Attachments_(Revised_24_Sept_13).doc DOC document
GSS_BOS_J-1503010-08 _Cust._Floor_Plans_(Revised_24_Sept_13).pdf PDF
SF30_0004.pdf PDF
Attachment_J.C-1_C-0200000_Management_and_Administration_(Revised_18_Sept_13).doc DOC document
SF30_0003.pdf PDF
Site_Visit_Roster.pdf PDF
Attachment_J.B-1_B-ELINs_(Revised_11_Sept_13).xlsx XLSX spreadsheet
0002_SF30.pdf PDF
Attachment_J.C-1_J-1604000_Attachments_(13_Sept_13).doc DOC document
13-3011_0001.pdf PDF
RFP Attachment J.C-1 C-1503020 Pest Control —
RFP Attachment J.M-1 Corporate Experience Questionaire.docx DOCX document
SF33_Solicitation.pdf PDF
RFP Attachment J.C-1 C-1503010 Custodial —
RFP Attachment J.C-1 J-1606000 Attachments —
RFP Attachment J.C-1 J-1700000 Attachments —
RFP Attachment J.C-1 J-1502000-08 PM Inventories —
RFP Attachment J.C-1 J-1503010-09 Cust. Room List —
RFP Attachment J.C-1 J-1503010-08 Cust. Floor Plans —
RFP Attachment J.C-1 C-1503050 Grounds Maint Landscaping —
RFP Attachment J.B-1 B-ELINs —
RFP Attachment J.C-1 C-1606000 Water —
RFP Attachment J.C-1 0100000 General Information —
RFP Attachment J.C-1 C-1503030 ISWM —
RFP Attachment J.C-1 J-1503020 Attachments —
RFP Attachment J.C-1 C-1604000 Wastewater —
RFP Attachment J.F-1 Sect F Deliverables —
RFP Attachment J.C-1 J-1604000 Attachments —
RFP Attachment J.C-1 J-1503010-00 Attachments —
RFP Attachment J.C-1 J-1503030 Attachments —
RFP Attachment J.B-2 Preaward Inquiry Form.xlsx XLSX spreadsheet
RFP Attachment J.C-1 C-1502000 C Facility Investment —
RFP Attachment J.C-1 C-1700000 BSVE —
RFP Attachment J.C-1 J-0200000 Attachments —
RFP Attachment J.M-2 Past Performance Questionaire.docx DOCX document
RFP Attachment J.B-3 Access Request Form.doc DOC document
RFP Attachment J.M-3 Full Time Equivalent —
RFP Attachment J.C-1 C-1503060 Pavement Clearance —
RFP Attachment J.E-1 JMC Instruction 4.pdf PDF
RFP Attachment J.C-1 C-0200000 Management and Administration —
RFP Attachment J.C-1 J-1503050 Attachments —
RFP Attachment J.C-1 J-1502000-00 Attachments —
RFP Attachment J.C-1 J-0100000 Attachments —
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .