EB101 Rev 3.pdf
PDF 223 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This document package includes a partial electrical site plan drawing and specifications for a vessel maintenance facility project. The project will construct a berthing pier, trestle, maintenance building, parking area, and fuel storage facilities to support the Maritime Force Protection Unit in Bangor, Washington. The electrical site plan drawing shows plans for installing site lighting, communications conduits, transformer pads, and connections to existing utility poles and buildings. Electrical work includes installing underground conduits and cables for site lighting, communications infrastructure, connections to a fire alarm system, and a conduit to monitor a detention tank level indicator. The project is being conducted by the Department of the Navy Naval Facilities Engineering Command to support the Nuclear Weapons Security mission.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
YD
H
YD
H
YD
WV
WV
W
VW
V
W V
W V
WV
H
Y D
W V
W V
S
D
D D
D
D
D
D
D
IM
P
ER
VI
O U S (P
AV
IN
G
SF
(2 .2
AC
D R
AI
N
FI
EL
D
IS
4X B O X
C U
LV
ER
T
WP,G WP,G WP,G
PAD MOUNTED
TERMINATING CABINET
F410 VMFJC
(2) 4"C TO COMMUNICATION ROOM 120
MANHOLE
TURNED UP EXISTING
UTILITY POLE TO
96" AFG
PAD MOUNTED
TRANSFORMER
VMFMVT
U2 M1
XL-03
XL-03
XL-03
XL-03
XL-03
XL-03
XL-03
XL-03
XL-03
XL-03XL-03XL-03
C1
EB502
XL-03
XL-03XL-03XL-03
U2 H3
U2 H3
A1
EB502
12R1/4312R1/4512R1/47 12R1/43,45,47
1-1/2"C, 6#8, 1#8 EGC
14L1/7K VIA LCP-1
1"C, 2#8, 1#8 EGC (TYP)
14L1/9L VIA LCP-1
1"C, 2#8, 1#8 EGC (TYP)
PAD MOUNTED
TERMINATING CABINET
F412 VMFJC
(1) 2"C TO FIRE ALARM MASTER BOX
LOCATED ON SIDE OF BUILDING. REFER
TO FIRE PROTECTION DRAWINGS FOR LOCATION
TO ELECTRICAL ROOM 121
5"
14L1/9L
C3
EB502
14L1/9L
14L1/9L
14L1/9L
14L1/9L 14L1/9L
14L1/9L
14L1/9L
14L1/9L
14L1/9L
14L1/7K 14L1/7K14L1/7K
14L1/7K14L1/7K14L1/7K
5"
5"
B3
EB403
B1
EB403
(TYP)
MATCHLINE SEE DWG EB102
S
TU
R G
E O
N S
TR
E
E T
VESSEL
MAINTENANCE
FACILITY
4"
WP,G
12R1/4212R1/42
WP,G WP,G
12R1/40
12R1/40
WP,G
12R1/44
12R1/44
WP,G
WP,G
TO DDC PANEL IN MECHANICAL ROOM 122
DETENTION TANK LIQUID
LEVEL INDICATOR (LLI-1)
12E1/60
EB505
A1
EB505
B1
(TYP)
EB501
A4
SCALE:
EPROJECT NO.:
CONSTR. CONTR. NO.
NAVFAC DRAWING NO.
SHEET OF
DRAWFORM REVISION: 31 JANUARY 2017
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
AS NOTED
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
D E P A R T M E N T
O F
T H E
N A V Y
N A V F A C
N W
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
S
IL
V E R D A L E W A S H
IN
G T O N
N A V A L
B A S E
K
IT
S A P B A N G O R
S
IL
V E R D A L E W A S H
IN
G T O N
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
S
YM
D
ES
C R
IP
TI
O N
D A
TE
A P P R
FIRE PROTECTION
D. GIBSON/T. BOLING
1389895
:3 :4
A M
C U s e rs S b o ll e n D o c u m e n ts P B L D G E L E C R S b o ll e n .r vt
F Y
M
C O
N P
R O
J E
C T
P -9
T P
P P
IE
R
A N
D M
A
IN
T E
N A
N C
E F
A C
IL
IT
Y
P
AR
TI
A L
EL
EC
TR
IC
AL
SI
TE
P
LA
N
N A V A L
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O M M A N D
N O R
TH
W
ES
T
BCPSMB BGA
EB101
113 135
16046738
D. BUSSARD
B. GALLOWAY
B. NIXON
SCALE:
40' 40'
1" = 40'-0"
80'80'
GENERAL NOTES:
SHEET KEYNOTES:
1. CORE DRILL EXISTING MANHOLE TO ALLOW INSTALLATION OF
CONDUITS.
2. PROVIDE RECEPTACLE EITHER FLUSH MOUNTED IN LIGHT POLE BASE
OR BY STRUCTURAL METAL CHANNEL ABOVE POLE BASE.
3. PROVIDE (2) 4"C FOR COMMUNICATIONS AND (1) 2"C FOR FIRE ALARM.
4. PROVIDE (1) 2"C TO FIRE ALARM MASTER BOX.
5. PROVIDE (1) 2"C FOR FIRE ALARM TO EXISTING POLE.
6. SEE THE P-876 PROJECT AS-BUILTS FOR EXACT LOCATION.
7. COMMUNICATION CABLE ROUTE TO BUILDING B7074.
8. PROVIDE (1) 1"C, 2#12, 1#12 GND TO ELECTRICAL ROOM 121, AND (1)
1-1/2" C TO DDC PANEL IN MECHANICAL ROOM 122 FOR DETENTION
TANK LEVEL INDICATOR. COORDINATE CONDUITS WITH LOCATION OF
LEVEL INDICATOR. SEE CIVIL DRAWINGS FOR ADDITIONAL
INFORMATION.
1. REFER TO SHEET EB504, EB505 AND EB606 FOR LUMINAIRE DETAILS AND
SCHEDULE.
2. LETTERS GIVEN AFTER THE CIRCUIT NUMBER ARE THE RELAY NUMBER IN
THE LIGHTING CONTROL PANEL LOCATED ON SHEET .
3. PROVIDE (3) 3-CELL FABRIC INNERDUCTS IN EACH 4" COMMUNICATIONS
CONDUIT.
N
SCALE: 1" = 40'-0"
PARTIAL ELECTRICAL SITE PLAN
A1
P
PI
9/
P
AL
P
PI
S M B
P
PI
0/
S M B
| Sheets |
| EB101 - PARTIAL ELECTRICAL SITE PLAN |
| EB131 - SYSTEMS FLOOR PLAN |
File details come from the government source that posted it. Updated .