NNSBQ_answers_146-6-8-20-33-34-35-40-43-50-22JAN2015.pdf

PDF 665 KB Posted

Attached to
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH)
Solicitation number
N0002415R4300
Issued by

About this file

Responses to NNS Questions 6 8 20 33 34 35 40 43 50 and 146

View the file

Other files

File Type Posted
amendment_20.doc DOC document
amendment_0019_USS_COLUMBUS_revised.pdf PDF
CJA_41069.20_SSN_765_and_762_Redacted.pdf PDF
SEA07B_Approved_Clarifying_6_4_15_Attachment_2.pdf PDF
amendment_18.pdf PDF
Amendment_18_Attachment_3.pdf PDF
Amendment_17.pdf PDF
Attachment_1_to_amendment_0016.doc DOC document
Amendment_16.doc DOC document
amendment_0015.doc DOC document
amendment_0014.pdf PDF
Final_amendment_13.pdf PDF
Final_amendment_12.doc DOC document
HII-NNS_762_BQ_12_answer.pdf PDF
EBC_BQ_125_revised_clarification_5FEB2015.pdf PDF
HII-NNS_RFP_Bidders'_Question__5_020515.docx DOCX document
EBC_INDUSTRY_DAY_BIDDERS_QUESTIONS.pdf PDF
EBC_pending_answers_4_11_78_79_116_134_135.pdf PDF
Final_amendment.doc DOC document
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
HII-NNS_RFP_Bidders'_final_RFP_questions.docx DOCX document
N00024-15-R-4300-0010.doc DOC document
Final_HII-NNS_Final_Questions.pdf PDF
EB_questions_27 _51 _52 _54 _57 _59 _67 _83 _82 _121 _126 _130 _131 _132 _133 _136 _137 _138 _139 _140 _and_141.pdf PDF
HII_questions_47 _48 _49 _51 _56 _6 _8 _13 _14 _25 _39 _50.pdf PDF
amendment_09.doc DOC document
N00024-15-R-4300-0008.doc DOC document
HII-NNS_RFP_bidders_questions_legal_response_sent_to_Marina.docx DOCX document
amendment_0007_approved.doc DOC document
20150123_HII-NNS_answers.pdf PDF
EBBQ_96-110_114_115_answers.pdf PDF
EBBQ_15-16-22-23-28-31-32-40-81.pdf PDF
amendment_0006_posting.pdf PDF
2015Jan14-EBC_BQ_answers_1_14_26_41_47_49_53_56_58_64_post_01222015.pdf PDF
amendment_05_post_01222015.pdf PDF
HII-NNS_RFP_Bidders'_Question__18_011515_Response_011615.pdf PDF
EBC_BQ_113__Final_011615.pdf PDF
Final_amendment_0004_FBO.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
20150115-USS_MONTPELIER_IDD_Q7 8_revision.pdf PDF
EB__74_-__Corp_cost_est__765_IDD.xlsx XLSX spreadsheet
HII-NNS_RFP_Bidders'_Question__41_011515_response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
2015Jan12-EBC_BQ_answers.pdf PDF
EB__74_Corp_Cost_est_762_EOH.xlsx XLSX spreadsheet
EBC_BQ_74.docx DOCX document
2015JAN14_HII-NNS_Answers.pdf PDF
HII-NNS_RFP_Bidders'_Question__34_011515_response_011615.pdf PDF
Bidders_question_112_FinalRev_011615.pdf PDF
Pre-Proposal_Conf_final_slides_01132015.pptx PPTX presentation
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER) 16 Januarv 2015

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 05-Jan-15

NA VSEA SOLICIT AT! ON NUMBER: N00024- I 5-R-4300 QUESTION# fi

SHIPS: USS COLUMBUS SSN-762

SPECIFICATION NO: 558A01 PARAGRAPH NO. 48.0180.0663

TITLE: AUX FRESHWATER COOLING MAINT PAGENO. l

QUESTION:

Should AWP contain Paragraph instructing SY to replace cathodic protection anodes within ERFW and EAFW heal exchangers during cleaning similar to SSN765 DRA V-02 AWP SWLIN 558Z01 Para. 88.0000.2200? SWLIN 201A06 Para.

74.0080.C6DB instructs SY to perform this action on main condensers and it has been traditionally done on ERFW and EAFW heat exchangers during cleaning as well.

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

paul.stence Sticky Note Marked set by paul.stence paul.stence Typewritten Text Ship's Force has a PMS requirement to inspect and replaced anodes whenever the coolers are open. They should be taking care of the anodes during the cleaning, unlike the main condensers. SF PMS is not normally specified in the work package, and Ship's Force should coordinate anode replacement in conjunction with SY cleaning of the heat exchangers.

paul.stence Sticky Note Marked set by paul.stence paul.stence Sticky Note Accepted set by paul.stence paul.stence Sticky Note Marked set by paul.stence perry.wilford Typewritten Text Concur with NNS "Engineering is basing their bid summary that all 16 holes require repair."

(NO QUESTIONS WILL BE ACCEPTED AFTER) 16 January 2015

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING

NA VSEA SOLICITATION NUMBER: N00024- I 5-R-4300

SHIPS: USS COLUMBUS SSN-762

SPECIFICATION NO: 201A05

TITLE: MAIN SHAFf THRUST BEARING AND VIBRATION

REDUCER MAINTENANCE

QUESTION:

DATE: 05-Jan-15

QUESTION# 20

PARAGRAPH NO. 28.1760.2100

PAGENO. l

Has Ships Force reported operational problems with the thrust hearing/vibration reducer to justify the restoration of the vibration reducer? When was the thrust bearing thrust clearance last taken?

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

perry.wilford Typewritten Text

1. Ships Force has not reported any operational problems. The reason why the restoration of the vibration reducer is in the EOH work package is that it has a last maintenance action date of 1/1/07 and its 120 month periodicity will be due by the start of EOH. The 120 month periodicity is a engineered periodicity based on the historical feedback condition of steel pistons in the vibration reducer found to be galled/scored. This condition can lead to one or more pistons to become immobile, limiting the axial movement of the shaft. Uneven loading on the thrust collar will cause a torsional imbalance leading to torsional vibration in the aft end of the ship.

2. The main thrust bearing thrust clearance measurements were last taken during the DMP availability ending 1/1/07.

paul.stence Sticky Note Unmarked set by paul.stence paul.stence Sticky Note Accepted set by paul.stence paul.stence Sticky Note Marked set by paul.stence paul.stence Sticky Note Marked set by paul.stence paul.stence

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 05-Jan-15

NA VSEA SOLICITATION NUMBER: N00024- I 5-R-4300 QUESTION # 33

SHIPS: USS COLUMBUS SSN-762

SPECIFICATION NO: 502AOI PARAGRAPH NO. 07.0065.06A3

TITLE: AIR CONDITIONING MAINT PAGENO. Jof3

QUESTION:

Inspections required by Maintenance Standard (MS) 5140-081-030 are included as part of MS 5140-081-087 which is accomplished under SWLIN 502AOI paragraph 07.0065. I 629. Should parapgraph 07.0065.06A3 be deleted from the A WP?

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

perry.wilford Typewritten Text Delete paragraph 07.0065.06A3 from AWP. MS 5140-081-087 has a parent relationship to MS 5140-081-030 therefore, credit can be taken when MS 5140-081-030 is accomplished.

paul.stence Sticky Note Accepted set by paul.stence paul.stence Sticky Note Marked set by paul.stence paul.stence Sticky Note Marked set by paul.stence paul.stence

(NO QUESTIONS WILL BE ACCEPTED AFI'ER) 16 January 2015

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING

NA VSEA SOLICITATION NUMBER: N00024- I 5-R-4300

SHIPS: USS COLUMBUS SSN-762

SPECIFICATION NO: 20JC36

TITLE: SHIPALT SSN3827(D) MODIFY MAIN REDUCTION GEAR

TURNING GEAR

QUESTION:

DATE: 05-Jan-15

QUESTION# 34

PARAGRAPH NO. 92.0100.4101

PAGENO. l

Although not included inS/A 3827D Jist of material, SY intends to replace disturbed gaskets/seals as well as thrust bearing that must be removed from first reduction worm to allow retainer ring groove modification. Docs gov't concur?

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

perry.wilford Typewritten Text Reference Dwg 663E432 (Shaft Turning Gear Assembly), which is Tech Man 0942-LP-005-2010 Fig FO-6. SUBMEPP concurs with the mandatory replacement of (1) seals/software and (2) the Thrust Bearing, pc 32, that will be removed for Retaining Ring, pc 35, replacement. During diassembly/reassembly, software needs to be replaced. Additionally, it is good maintenance practice to replace the thrust bearing within the Turning Gear reduction gear assembly since that bearing has been subject to wear during service.

paul.stence

Accepted set by paul.stence

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 05-Jan-15

NA VSEA SOLICIT AT10N NUMBER: NOD024-15-R-4300 QUESTION# 35

SHIPS: USS COLUMBUS SSN-762

SPECIFICATION NO: 415A01 PARAGRAPH NO. 31.0140.2200

TITLE: NA V. PERISCOPES MAINT PAGE NO. Enter PaQe #

QUESTION:

Is the intent to have SY perform MS5850-081-094

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

perry.wilford Typewritten Text 1.) Negative. It is not the intent to have SY perform MS 5850-081-094, "Restore periscope hoist cylinder" when accomplishing 415A01 / GCMA: 31.0140.2200.

Rationale:

1.) SWLIN: 415A01; GCMA: 31.0140.2200 = "Replace periscope hoist cylinder softgoods."

2.) This is a baseline, "Execution Requirement" added to "Each major availability" by PNS, approved by TYCOMs for risk mitigation purposes.

3.) Requirement was not a CMP requirement.

4.) There is no SUBMEPP MID required.

5.) MA is accomplished via local documentation.

6.) It is not the intent to perform a complete periscope host cylinder overhaul @ "Each major availability".

7.) Periscope hoist cylinder restoration is GCMA 31.0140.2100; is a situational periodicity, "Not scheduled"; accomplished as a CBM requirement.

paul.stence Sticky Note Accepted set by paul.stence paul.stence Sticky Note Marked set by paul.stence paul.stence Sticky Note Marked set by paul.stence paul.stence

TITLE:

SPECIFICATION NO: PARAGRAPH NO.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

132A01 82.0060.2809

NON-PRESSURE HULL MAINT

This paragraph authorizes the accomplishment of a URO MRC 003 inspection of EGL Items 8A, 8E, 8F, and 8G. Based on a review of the CCIMS database there are 10 of these recesses as well as 4 tanks (identified under SWLIN 176A01) where no preservation data has been entered.Attachment 7 of MS 6310-081-015 is invoked for recesses and tanks throughout the AWP for preservation (Attachments 12 and 14 respectively are invoked for the VLS bathtub and the RPB recess). Paragraph 1.a.(2) of Attachment 7 provides guidance for evaluation of the existing paint system to determine whether touch up or complete represervation is required. Can the government provide any preservation data for areas where preservation information is not entered in CCIMS in order for the SY to evaluate the preservation requirements or should the SY make the assumption that only touch up will be required?

Recesses AN/BSY-1 recess fr 12/13, AN/BSY-1 recess fr 13/14, AN/BQN-13 recess fr 15/16P, Towed sonar array cable handling recess, Anchor housing recess, Missile tube cooling sea chest Fr 24-25 Stbd, AN/WSQ-9 recess fr 13-15 port, AN/WSQ-9 recess fr 13-15 stbd, AN/WSQ-9 recess on horizontal stabilizer port, and AN/WSQ-9 recess on horizontal stabilizer stbd.

Tanks Clean Fuel Oil Tank - Preserved with MIL-P-24441 at new construction per 8300-120 which agrees with 009-32 Table 8 (MIL-

DTL-24441)

Lube Oil Sludge Tank - Preserved with Lube Oil at new construction per 8300-120. 009-32 Table 8 identifies MIL-DTL- 24441) Reserve Hydraulic Oil Tank 1 - Preserved with MIL-P-23236 at new construction per 8300-120. 009-32 Table 8 identifies

MIL-DTL-24441)

Reserve Hydraulic Oil Tank 2 - Preserved with MIL-P-23236 at new construction per 8300-120. 009-32 Table 8 identifies

MIL-DTL-24441)

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. 6

16 January 2015

NEWPORT NEWS SHIPBUILDING

perry.wilford Typewritten Text SUBMEPP confirms for planning and estimating purposes, the Contractor should plan on full coating system replacement for the non-pressure hull interior free flood area and recesses area surfaces.

URO MRC 003 requires MA 2809 which calls out Attachment 7. The coating system in the NPH interior will be 10 or more years old at EOH. Attachment 7 preservation is accomplished based on an as-arrived condition assessment. However, for planning purposes, there are indicators in the attachment that apply directly to financial planning.

First - Note 1 of Table 20 states "1. Plan for complete replacement of coating during major availabilities." An EOH is a major availability, therefore in the absence of conflicting superseding guidance, a complete replacement of the coating should be planned for.

Second - step 1.a.(2) also gives guidance on how to financially plan for coating jobs using this attachment. In part, step 1.a.(2) states, "Activities should plan on full coating system replacement for all other coating systems, including all solvent based systems in service for more than 4 years since the last condition rating, high solids systems that have been in service longer than 10 years, and any coating that had a prior condition rating of "C" or worse." The SSN 762 EOH is scheduled to start in January of 2017, at which point the coating system will be over 10 years old. Therefore, it is appropriate to plan for an Attachment 8 coating system replacement.Reserve Hydraulic Oil tanks 1 & 2 have inspection reports from 2010 identifying the coating system as an A in the tanks with no defects at the time of the inspection.The Lube Oil Sludge Tank and Clean Fuel Oil Tank have not received inspection since PSA in 1994, preservation data does not exist for these tanks. Extent of preservation must be based on the as arrived condition.

paul.stence

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

606A01 20.0020.2200

COVERING MAINTENANCE

This paragraph states to replace all vinyl deck tile throughout the ship. Is it the government's intent to replace all of the tile on the ship or just that identified by Ship's Force?

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. 1

16 January 2015

NEWPORT NEWS SHIPBUILDING

perry.wilford Typewritten Text The government's intent is to replace all of the vinyl on the ship. This is a 120 month habitability requirement in all EOH work packages.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

518A02 08.0025.2009

STEERING & DIVING (STRUC, MECH & ELEC)

Paragrapgh states to clear DFS on UT indications on RBP Guide Rails. Historically, other ships temporary departures on RBP Guide Rails are extended for continued monitoring without repairs or replacement of Guide Rails. SY assumes that previously reported indications will not significantly change based on past community experience. It is expected that DFS will be extended or cleared with hardware as is. Any repairs (or replacement) based on the findings and technical evauluation of UT/PT results found during completion of MS 5660-081-062 (AWP 08.0025.1380) during the EOH will be considered growth work. Does Government concur?

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. 2

16 January 2015

NEWPORT NEWS SHIPBUILDING

perry.wilford Typewritten Text Standard practice has been to temporarily depart (or extend existing departures of) any UT/PT indications on the RBP guide rails to the next scheduled depot availability, and forward findings to the Planning Yard for monitoring purposes. Besides initial repair attempts on SSN752 and SSN754 at DMP, there have been no other NAVSEA authorized repairs to this component throughout the Fleet.

SUBMEPP recently completed a thorough class-wide review of all UT/PT findings on the RBP guide rails since the elevated NDT inspections became a requirement in 2001. The results are documented in LAR PY-82358, and evidence showed no appreciable growth in depth of indications, and no evidence of indications penetrating past the weld heat affected zone and into the bulk HY-100 rail material. The indications are considered a delamination of the Ferralium overlay, and not detrimental to the structural integrity of the rails.

As a result of these findings, SUBMEPP and NAVSEA determined further elevated UT/PT inspections on forward guide rail, piece 26, and aft guide rail, piece 27 were not necessary and were subsequently deleted from MS 5660-081-062 via UACS SUBMEP-14-096. A visual check for cracks in Ferralium and HY-100 material was retained. This will be reflected in the next Rev B Chg-12 of the MS.

This resolution was agreed upon by NAVSEA PMS392T314 (M. Babicki) on 5/28/14. The intent is to approve all existing departures of the guide rails as permanent.

paul.stence Sticky Note Accepted set by paul.stence paul.stence

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

DATE:

QUESTION #

503A01 84.0000.1100

REFRIGERATION MAINTENANCE

Does required preliminary leak test include valve seat leakage or just external leakage to atmosphere. If limited to external leakage is testing with electronic halide detector per MRC 61 7CRY N sufficient or should pressure test and vacuum hold test per MRC 21 7DKD U.

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: UUS MONTPELIER SSN-765

N00024-15-R-4300

PAGE NO. Page 1 of 1

01 January 2015

NEWPORT NEWS SHIPBUILDING

perry.wilford Typewritten Text

1. No, preliminary leak checks verify external leakage to atmosphere.

2. MRC 21 7DKD U should be accomplished during a Major Availability.

Rationale:

The preliminary checks so not include seat leakage, just external leakage to atmosphere. During a Major Availability MRC 21 7DKD U should be accomplished.

paul.stence

Accepted set by paul.stence

HII Bidders Question #06 SUBMEPP Response
HII Bidders Question #20 SUBMEPP Response
HII Bidders Question #33 SUBMEPP Response
HII Bidders Question #34 SUBMEPP Response
HII Bidders Question #35 SUBMEPP Response
HII Bidders Question #41 SUBMEPP Response
HII Bidders Question #42 SUBMEPP Response
HII Bidders Question #47 SUBMEPP Response
HII Bidders Question #48 SUBMEPP Response
HII Bidders Question #49 SUBMEPP Response
HII Bidders Question #50 SUBMEPP Response
HII Bidders Question #146 SUBMEPP Response