HII_questions_47 _48 _49 _51 _56 _6 _8 _13 _14 _25 _39 _50.pdf

PDF 93 KB Posted

Attached to
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH)
Solicitation number
N0002415R4300
Issued by

About this file

HII responses

View the file

Other files

File Type Posted
amendment_20.doc DOC document
amendment_0019_USS_COLUMBUS_revised.pdf PDF
CJA_41069.20_SSN_765_and_762_Redacted.pdf PDF
SEA07B_Approved_Clarifying_6_4_15_Attachment_2.pdf PDF
amendment_18.pdf PDF
Amendment_18_Attachment_3.pdf PDF
Amendment_17.pdf PDF
Attachment_1_to_amendment_0016.doc DOC document
Amendment_16.doc DOC document
amendment_0015.doc DOC document
amendment_0014.pdf PDF
Final_amendment_13.pdf PDF
Final_amendment_12.doc DOC document
HII-NNS_762_BQ_12_answer.pdf PDF
EBC_BQ_125_revised_clarification_5FEB2015.pdf PDF
HII-NNS_RFP_Bidders'_Question__5_020515.docx DOCX document
EBC_INDUSTRY_DAY_BIDDERS_QUESTIONS.pdf PDF
EBC_pending_answers_4_11_78_79_116_134_135.pdf PDF
Final_amendment.doc DOC document
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
HII-NNS_RFP_Bidders'_final_RFP_questions.docx DOCX document
N00024-15-R-4300-0010.doc DOC document
Final_HII-NNS_Final_Questions.pdf PDF
EB_questions_27 _51 _52 _54 _57 _59 _67 _83 _82 _121 _126 _130 _131 _132 _133 _136 _137 _138 _139 _140 _and_141.pdf PDF
amendment_09.doc DOC document
N00024-15-R-4300-0008.doc DOC document
HII-NNS_RFP_bidders_questions_legal_response_sent_to_Marina.docx DOCX document
amendment_0007_approved.doc DOC document
20150123_HII-NNS_answers.pdf PDF
EBBQ_96-110_114_115_answers.pdf PDF
EBBQ_15-16-22-23-28-31-32-40-81.pdf PDF
amendment_0006_posting.pdf PDF
NNSBQ_answers_146-6-8-20-33-34-35-40-43-50-22JAN2015.pdf PDF
2015Jan14-EBC_BQ_answers_1_14_26_41_47_49_53_56_58_64_post_01222015.pdf PDF
amendment_05_post_01222015.pdf PDF
HII-NNS_RFP_Bidders'_Question__18_011515_Response_011615.pdf PDF
EBC_BQ_113__Final_011615.pdf PDF
Final_amendment_0004_FBO.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
20150115-USS_MONTPELIER_IDD_Q7 8_revision.pdf PDF
EB__74_-__Corp_cost_est__765_IDD.xlsx XLSX spreadsheet
HII-NNS_RFP_Bidders'_Question__41_011515_response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
2015Jan12-EBC_BQ_answers.pdf PDF
EB__74_Corp_Cost_est_762_EOH.xlsx XLSX spreadsheet
EBC_BQ_74.docx DOCX document
2015JAN14_HII-NNS_Answers.pdf PDF
HII-NNS_RFP_Bidders'_Question__34_011515_response_011615.pdf PDF
Bidders_question_112_FinalRev_011615.pdf PDF
Pre-Proposal_Conf_final_slides_01132015.pptx PPTX presentation
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE:

SPECIFICATION NO: PARAGRAPH NO.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

708F02 94.0101.8000

TORPEDO TUBES/TORPEDOS ORDALT

ACCOMPLISHMENT

•Kitted material defined in section 12.1.1 of ORDALT 18000 is listed as provided by NUWC for 4 tubes (1 kit per ship). NNS requests clarification that this material is considered GFE without cost to the bidder and is readily available, not considered long lead material, for installation.

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. 1

16 January 2015

NEWPORT NEWS SHIPBUILDING

paul.stence Typewritten Text OA 18000 material requirements will be provided by separate correspondence (CITIS).

Table 12.2.1.1 is the NAVSEA provided kitted material Table 12.3.1 is the material the industrial activity must provide (consumable type stuff) Table 12.3.2 is the tools/test equipment necessary for the work.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

708F03 94.0101.8009

TORPEDO TUBES/TORPEDOS ORDALT

ACCOMPLISHMENT

Performance of ORDALT 18009 is only required when measurements taken during performance of ORDALT 18000 are found to be unsatisfactory. For bidding purposes, is SY to assume ORDALT 18009 will be required on all four torpedo tubes?

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. 1

16 January 2015

NEWPORT NEWS SHIPBUILDING

paul.stence Typewritten Text For proposal purposes, assume ORDALT 18009 will be required on all four torpedo tubes.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

708F03 94.1010.8009

TORPEDO TUBES/TORPEDOS ORDALT

ACCOMPLISHMENT

•Kitted material defined in section 12.2 of ORDALT 18009 is listed as provided by NUWC for 1 tube (4 kits per ship). NNS requests clarification that this material is considered GFE without cost to the bidder and is readily available, not considered long lead material, for installation.

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. 1

16 January 2015

NEWPORT NEWS SHIPBUILDING

paul.stence

The kit is provided by NUWCDIVNPT Code 4123 and is available upon request.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

13-Jan-15DATE:

QUESTION #

503A01 84-000-1100

REFRIGERATION MAINTENANCE

Does required preliminary leak test include valve seat leakage or just external leakage to atmosphere. If limited to external leakage is testing with electronic halide detector per MRC 61 7CRY N sufficient or should pressure test and vacuum hold test per MRC 21 7DKD U.

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. Page 1 of 1

16 January 2015

NEWPORT NEWS SHIPBUILDING

paul.stence

The paragraph 84-000-1100 leak test is an overall system tightness test. No plant disassembly is required or desired. The MRC 7DKD pressure test/deep vacuum test should be accomplished. 7DKD is a more reliable test for atmospheric leaks than the electronic detector, especially for small leaks, and it also verifies that the isolation valves at the vacuum's boundary are not leaking by.

QUESTION:

NAME OF OFFEROR:

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER)

16-Jan-15DATE:

QUESTION #

518A02 08.0200.2009

STEERING & DIVING (STRUC, MECH & ELEC)

The paragraph instructs the SY to clear DFS 762-1005-1012, Syntactic foam used in voids in the port & starboard stabilizer and port & starboard pods does not meet mechanical properties required by specifications. Is it the Governments intention to have the SY remove the subject foam and replace it with foam that meets specifications or to perform inspections and testing to attempt to permanently depart the condition?

DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

NAVSEA SOLICITATION NUMBER:

SHIPS: USS COLUMBUS SSN-762

N00024-15-R-4300

PAGE NO. Page 3 of 6

20 January 2015

NEWPORT NEWS SHIPBUILDING

paul.stence

Inspect and repair deficiencies to clear the Departure.

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER) 16 January 2015

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 12-Jan-15

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 6 (RFP)

SHIPS: USS MONTPELIER SSN 765/USS COLUMBUS SSN 762

SPECIFICATION NO: RFP PARAGRAPH NO.: SECTION B

TITLE: PAGE NO.:

QUESTION:

The RFP establishes CLIN 0006 & 0012 to be utilized for the authorization of new work resulting from either contractor or Government proposed changes to the work package.

Is it the Government’s intent to utilize CLIN 0006 & 0012 to authorize new work during the planning period?

If not, how does the Government intend to authorize new work during the planning period?

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY)

ANSWER:

Yes, work identified after contract award will be authorized as new work, on CLINs 0006 and 0012 respectively.

Yes, all new work identified after contract award will be authorized utilizing either CLINs 0001, 0006, 0007 or

0012 as applicable.

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 15-Jan-15

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 8 (RFP)

SPECIFICATION NO: RFP PARAGRAPH NO.: SECTION B

Can the Government provide the Offeror with an example of additional planning effort(s) the ACO may authorize under CLIN’s 0001 & 0007 that will result in an increase in the CPFF for the Item, pursuant to FAR 52.243-2, CHANGES – COST REIMBURSEMENT as noted in Notes A & F?

An example of a change to be authorized under CLINs 0001 or 0007 would be procurement of additional long lead material, or government direction to accelerate procurement of material from normal to long lead.

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 13 (RFP)

SPECIFICATION NO: RFP PARAGRAPH NO.:

How does the Government intend to handle material costs of EMERGENT WORK or SUPPLEMENTAL WORK for items associated with CLIN’s 0004, 0006, 0009 & 0012 during the execution period?

The contractor is expected to propose material costs based upon his expected needs for completion of the outstanding work, and the government will authorize any additional material needs by an associated contract change.

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 14 (RFP)

Acknowledging information discussed with industry by the Government during the 13 January 2015 pre-proposal conference, it is understood by the contractor that all special incentives, for Lot’s 1 & 2, as specified in Section B of the solicitation, will in fact be a percentage of the total awarded cost for each associated CLIN as adjusted for any remedy granting clause that provides for an adjustment of fee.. Is this correct? Will an amendment to the solicitation be issued to codify the contractors understanding of the special incentives as stated?

The Government concurs with KTR acknowledgement of government pre-proposal conference response. The language in the solicitation is clear and therefore, further amendment is not needed.

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 25 (RFP)

For the purposes of the special incentives, how does the Government define “completion of the availability”? How does the Government define “start of the availability”? How does the Government define “start of the execution of the availability”?

Incentive timelines are specified in Section B, paragraph B and paragraph C. Start dates are CNO determined.

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 39 (RFP)

Acknowledging information discussed with industry by the Government during the 13 January 2015 pre-proposal conference, the Contractor understands it shall be entitled to a schedule adjustment for any growth work or new work that is demonstrated to cause impact to the execution period critical path schedule. Such schedule adjustment will also be made to any other impacted CLIN as well as all criteria and dates used for incentive profit/fee determinations, undocking, fast cruise, redelivery, liquidated damages, and any other schedule dependent term of the contract. To reflect this understanding, however, recommend that the following sentence be added to Note D: For supplemental and emergent work within the amounts identified in Notes D and E, the Contractor shall be entitled to an equitable adjustment to all affected CLINs (both fixed price and cost-reimbursement) and any incentives associated therewith only if the Contractor‘s critical path analysis shows that the supplemental or emergent work will delay the schedule. Equitable adjustments will be processed in accordance with the “Changes” clauses of this Contract.”

Impact of growth will be addressed on a case by case basis as stated in the amendment 04.

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 16-Jan-15

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 50 (RFP)

Will the Government agree to a date by which it will authorize all supplemental work under CLINs 0006 and 0012?

The nature of submarine repair work does not allow assignment of a specific date at which all new work will be identified.

20150126-HII-NNS BQ 47 48 49 51 56 answers
USS COLUMBUS Bidders Question #47 answer
USS COLUMBUS Bidders Question #48 answer
USS COLUMBUS Bidders Question #49 answer
USS COLUMBUS Bidders Question #51 answer
USS COLUMBUS Bidders Question #56 answer

HII-NNS RFP Bidders' Question 6, 8, 13, 14, 25, 39, 50