TITLE:
SPECIFICATION NO: PARAGRAPH NO.
QUESTION:
NAME OF OFFEROR:
REQUEST FOR CLARIFICATION
(NO QUESTIONS WILL BE ACCEPTED AFTER)
DATE:
QUESTION #
076A01 YR.0441.1523 & 1524
STAND CS TEST PROGRAM
SWILN 076A01 assigns performance of SUBMEPP TPs 441-5-1523 and 441-5-1524 for CSRR VLF System Testing to SY.
These TPs have not yet been promulgated by SUPMEPP. The CSRR S/A 4697(KP) is assigned to AIT under SWILN 441G92 in which the AIT is responsible for required Shipalt Testing. The SUBMEPP Work to Test Matrix (WTTM) [SWILN 441G92) Note 1 states “Initial S/A installation will be tested by the installing activity using their tests”; also the WTTM states that TP 441-5-1523 and 441-6-1524 are not required for S/A 4697 KP installation. Request that SWILN 076A01 lines YR.0441-1523 and YR.0441-1524 be deleted from the AWP or assigned to the AIT performing S/A 4697 KP under SWILN 441G92.
DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)
ANSWER:
NAVSEA SOLICITATION NUMBER:
SHIPS: UUS MONTPELIER SSN-765
N00024-15-R-4300
PAGE NO. 2 of 3
16 January 2015
NEWPORT NEWS SHIPBUILDING
paul.stence Typewritten Text TPs listed are still going to be required to support the mandatory EMI testing requirement from the AWP.
paul.stence Typewritten Text The Government will remove this line item from the AWP.
SAR does not indicate that any EAFW piping is to be removed on 762. Piping removal is called out for certain units, 762 is not one of them. The Government intends to leave this A&I in the AWP.
The Government concurs.
perry.wilford
Concur. Plan to restore all four valves. The Government will modify the line item in the AWP to make it clear.
SY should assume material is LLTM and should procure under CLIN 0007.
Yes.
The Government will provide the radar pedestal as GFM.
QUESTION:
NAME OF OFFEROR:
REQUEST FOR CLARIFICATION
(NO QUESTIONS WILL BE ACCEPTED AFTER)
13-Jan-15DATE:
QUESTION #
076A01 YR.0441.1523 AND 15
STAND CS TEST PROGRAM
SWILN 076A01 assigns performance of SUBMEPP TPs 441-5-1523 and 441-5-1524 for CSRR VLF System Testing to SY.
These TPs have not yet been promulgated by SUPMEPP. The CSRR S/A 4697(KP) is assigned to AIT under SWILN 441G92 in which the AIT is responsible for required Shipalt Testing. The SUBMEPP Work to Test Matrix (WTTM) [SWILN 441G92) Note 1 states "Initial S/A installation will be tested by the installing activity using their tests"; also the WTTM states that TP 441-5-1523 and 441-6-1524 are not required for S/A 4697 KP installation. Request that SWILN 076A01 lines YR.0441-1523 and YR.0441-1524 be deleted from the AWP or assigned to the AIT performing S/A 4697 KP under SWILN 441G92.
DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)
ANSWER:
NAVSEA SOLICITATION NUMBER:
SHIPS: USS COLUMBUS SSN-762
N00024-15-R-4300
PAGE NO. 2
16 January 2015
NEWPORT NEWS SHIPBUILDING
paul.stence Typewritten Text TPs listed are still going to be required to support the mandatory EMI testing requirement from the AWP.
paul.stence Sticky Note Marked set by paul.stence
QUESTION:
NAME OF OFFEROR:
REQUEST FOR CLARIFICATION
(NO QUESTIONS WILL BE ACCEPTED AFTER)
16-Jan-15DATE:
QUESTION #
307A01 ALL
SHIP'S SERVICE MOTER GENERATOR SETS
Will all material required for the restoration of the MG sets (such as brushes, bearings, gaskets, etc) be provided as GFM? If not all, what material will be furnished GFM?
DO NOT WRITE BELOW THIS LINE --- (SPACE BELOW FOR GOV'T USE ONLY)
ANSWER:
NAVSEA SOLICITATION NUMBER:
SHIPS: USS COLUMBUS SSN-762
N00024-15-R-4300
PAGE NO. All
20 January 2015
NEWPORT NEWS SHIPBUILDING
paul.stence Typewritten Text The only GFM being provided by the Navy for 762 EOH SWLIN 307A01 are 500KW SSMG set rotors being provided by Advanced Equipment Repair Program under SGCMA 3070.35.0902.2222.
The Accomplishing Activity is responsible for ordering all remaining material required to complete:
| a. | SGCMA 3070.35.0900.06BH In-place clean, inspect, and repair of ac stators of #1 and #2 500KW MG sets |
| b. | SGCMA 3070.35.0900.061R Accomplish Shop reconditioning of commutating poles, dc brush rigging, and static exciters. |
| c. | SGCMA 3070.35.0900.2200 Replace DC main poles on #1 and #2 500KW MG sets |
| d. | SGCMA 3070.35.0903.0613 Inspect and repair the 500KW MG set Control and Regulating equipment |
| e. | SGCMA 3070.58.0340.0613 Inspect and repair 500 KW MG set Starter |
NOTE the NSN for ordering replacement DC main poles is 6115-01-152-5666.
| HII Bidders Question #149 SUBMEPP Response |
| HII Bidders Question #01 answer |
| HII Bidders Question #02 answer |
| HII Bidders Question #03 answer |
| HII Bidders Question #14 SUBMEPP Response |
| HII Bidders Question #18 SUBMEPP Response |
| HII Bidders Question #44 SUBMEPP Response |
| HII Bidders Question #55 SUBMEPP Response |
File details come from the government source that posted it. Updated .