Responses to EB Questions 1 14 26 41 47 49 53 56 58 and 64

View the file

Other files

File Type Posted
amendment_20.doc DOC document
amendment_0019_USS_COLUMBUS_revised.pdf PDF
CJA_41069.20_SSN_765_and_762_Redacted.pdf PDF
SEA07B_Approved_Clarifying_6_4_15_Attachment_2.pdf PDF
amendment_18.pdf PDF
Amendment_18_Attachment_3.pdf PDF
Amendment_17.pdf PDF
Attachment_1_to_amendment_0016.doc DOC document
Amendment_16.doc DOC document
amendment_0015.doc DOC document
amendment_0014.pdf PDF
Final_amendment_13.pdf PDF
Final_amendment_12.doc DOC document
HII-NNS_762_BQ_12_answer.pdf PDF
EBC_BQ_125_revised_clarification_5FEB2015.pdf PDF
HII-NNS_RFP_Bidders'_Question__5_020515.docx DOCX document
EBC_INDUSTRY_DAY_BIDDERS_QUESTIONS.pdf PDF
EBC_pending_answers_4_11_78_79_116_134_135.pdf PDF
Final_amendment.doc DOC document
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
HII-NNS_RFP_Bidders'_final_RFP_questions.docx DOCX document
N00024-15-R-4300-0010.doc DOC document
Final_HII-NNS_Final_Questions.pdf PDF
EB_questions_27 _51 _52 _54 _57 _59 _67 _83 _82 _121 _126 _130 _131 _132 _133 _136 _137 _138 _139 _140 _and_141.pdf PDF
HII_questions_47 _48 _49 _51 _56 _6 _8 _13 _14 _25 _39 _50.pdf PDF
amendment_09.doc DOC document
N00024-15-R-4300-0008.doc DOC document
HII-NNS_RFP_bidders_questions_legal_response_sent_to_Marina.docx DOCX document
amendment_0007_approved.doc DOC document
20150123_HII-NNS_answers.pdf PDF
EBBQ_96-110_114_115_answers.pdf PDF
EBBQ_15-16-22-23-28-31-32-40-81.pdf PDF
amendment_0006_posting.pdf PDF
NNSBQ_answers_146-6-8-20-33-34-35-40-43-50-22JAN2015.pdf PDF
amendment_05_post_01222015.pdf PDF
HII-NNS_RFP_Bidders'_Question__18_011515_Response_011615.pdf PDF
EBC_BQ_113__Final_011615.pdf PDF
Final_amendment_0004_FBO.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
20150115-USS_MONTPELIER_IDD_Q7 8_revision.pdf PDF
EB__74_-__Corp_cost_est__765_IDD.xlsx XLSX spreadsheet
HII-NNS_RFP_Bidders'_Question__41_011515_response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
2015Jan12-EBC_BQ_answers.pdf PDF
EB__74_Corp_Cost_est_762_EOH.xlsx XLSX spreadsheet
EBC_BQ_74.docx DOCX document
2015JAN14_HII-NNS_Answers.pdf PDF
HII-NNS_RFP_Bidders'_Question__34_011515_response_011615.pdf PDF
Bidders_question_112_FinalRev_011615.pdf PDF
Pre-Proposal_Conf_final_slides_01132015.pptx PPTX presentation
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DYNAMICS

Electric Boat

REQUEST FOR CLARIFICATION

Name of Offeror: Electric Boat Corporation Date: December 23, 2014

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 1

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 552A01 Title: Maintenance

Section/Paragraph No.:

Question:

Does either SSN765 or SSN762 have any history of issues in passing URO-MRC 025 or URO-MRC 026?

DO NOT WRITE BELOW THIS LINE ---- (SPACE BELOW FOR GOV'T USE ONLY)

Answer:

Looking at the maintenance history for each URO MRC for each hull, there is no history of issues evident in passing UROs. There are a few records of adjustments and re-tests needed, but this has never encumbered passing the URO.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 14

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 007Y01 Title: Common Work Requirements

Section/Paragraph No.: FB.0020.0200

Question:

AWP for SSN 762 EOH requires replacement of resilient and shock mounts for rotating equipment removed by the shipyard. All others not supporting rotating equipment shall be inspected and replaced if fail inspection criteria. All DIM shall be replaced except for electrical equipment. AWP for SSN 765 IDD requires replacement of all DIM, resilient and shock mounts for equipment removed. It is unclear why requirements are significantly different. The requirement for SSN 762 is much more concise allowing for a more accurate estimate. The requirement for SSN 765 is open ended until interferences for contracted work can be evaluated via ship checks. Can the latest updated SWLIN Line Item identified in SSN 762 be used for SSN 765 availability? If not, does the government have an estimate of how many mounts are replaced during availability the size SSN 765 IDD? In instances where all components supported by mounts are not fully removed, are the mounts required to be replaced, which would potentially require significantly more interference removal?

Past guidance provided by the government indicated only mounts unloaded by more than 50% were required to be replaced. Is this accurate guidance to use?

Yes, the requirements in the SSN762 package are the latest direction on replacing resilient mounts and the same instruction should be used for the SSN765. This acceptance of the change should answer the issues with partial removals or 50% unloaded.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 26

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 518A02 Title: Maintenance

Section/Paragraph No.: 08.0020.U003

Question:

Does Note 1 of Section 08.0020.U003 refer to replacement of SHT tiles?

Yes, Note 1 refers to the replacement of 100% SHT tiles to support full blast and re-preserve, and URO003 inspections of upper and lower rudder control surfaces at EOH.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 41

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 002Y06 Title: INDUSTRIAL

ELECTROMAGNETIC

COMPATIBILITY

(IEMC) PROGRAM

Section/Paragraph No.: FC.0020.000

Question:

DOD-STD-2003 has been superseded since 2009. Should it be listed as MIL-STD-2003?

Yes. MIL-STD-2003 should be listed in GCMA FC.0020.000.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 47

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 201A06 Title: MAIN

CONDENSERS

MAINT

Section/Paragraph No.: 41.0020.9020

Question:

Subject paragraph requires SY to perform heat exchanger and condenser cleanliness inspections IAW 9460-1-b of DDGOS. This section of DDGOS contains a requirement to perform tightness inspection on waterhead main flange bolting. SY assumes that waterhead main flange bolting refers to waterbox bolt studs. SY also assumes that tightness inspection requirement is not invoked by Para. 41.0020.9020 and is therefore not required during this availability. Does government concur?

Tightness inspection of waterhead main flange bolting IAW DDGOS 9460-1-b is not required during the availability.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 49

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 708A01 Title: TORPEDO TUBES

Section/Paragraph No.: 44.0020.2200

Question:

Valves TD-25, TD-26, TD-27 and TD-28 are being replaced with CCRP assets. Will the CCRP supplied valves come with actuators?

TD-25, TD-26, TD-27 and TD-28 do not include actuators.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 53

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 567A01 Title: DIESEL

SUPPORTING

MAINTENANCE

Section/Paragraph No.: 44.0020.2100

Question:

Hull and back up valve DSW-1/2 has been assigned to be replaced per the AWP. Will the new valve come with sea chest blow valve DSW-23 attached? This valve is welded to DSW-1/2.

The sea chest blow valve DSW-23 will be attached with DSW-1/2 from the CCRP.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 56

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 552A01 Title: SHIP'S SERVICE

HYDRAULIC

MAINT

Section/Paragraph No.: 38.0130.U026

Question:

Flood Control Hydraulics System

a. SWLIN 552A01 Section 38.0130.U026 states "Accomplish URO MRC 026, Test Flood Control Accumulator Air Flask and Isolation Check Valves" with Assignment SY.

b. Shipyard does not conduct URO MRC 026. Based on scope of work in the AWP, Shipyard will be conducting SUBMEPP TP 552-5503 which "accomplishes the intent of URO MRC 026."

Is it acceptable to use TP No. 552-5503 in lieu of URO-MRC 026 to record flood control hydraulic system test data?

No, it is not acceptable to use SUBMEPP TP 552-5503 "in lieu of" URO MRC 026. TP 552-5503 accomplishes the intent of URO MRC 026, meaning it satisfies the technical requirements. URO MRC 026 MOD 1 is to remain the applicable standard for 38.0130.U026 as it contains the reporting requirements for URO MRC 026.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 58

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 552A01 Title: SHIP'S SERVICE

HYDRAULIC

MAINT

Section/Paragraph No.: 84.0140.U025

Question:

Flood Control System Operation

a. SWLIN 071A01 states "Conduct SSN688 Mandatory TP No. 552-5185, Flood Control System - Operation" with Assignment SY.

b. SWLIN 552A01 states "Accomplish URO MRC 025, Conduct in-port waterborne operational tests of the emergency flood control system" with Assignment SY.

Is it acceptable to use TP No. 552-5185 in lieu of URO-MRC 025 to record flood control hydraulic system test data?

No, it is not acceptable to use SUBMEPP TP 552-5185 "in lieu of" URO MRC 025. TP 552-5185 accomplishes the intent of URO MRC 025, meaning it satisfies the technical requirements. URO MRC 025 MOD 40 is to remain the applicable standard for 84.0140.U025 as it contains the reporting requirements for URO MRC 025.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 64

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 515A01 Title: BUOYANCY

CONTROL MAINT

Section/Paragraph No.: Note 2

Question:

SWLIN 515A01 Note 2, states: "Note 2. Tightness of the MBT vent valves shall be verified in conjunction with the main ballast tank tests conducted under SWLIN 176A01." SWLIN 176A01 does not specify or address main ballast tank testing, as indicated in SWLIN 515A01.

1. Is it the intent to specify tightness testing of MBT vent valves in SWLIN 176A01?

2. Is it the intent to specify an MBT full tank completion test, or can an alternate completion test method be substituted?

1) No, testing is specified in the work to test matrix (WTTM).

2) Alternate completion tests may be substituted as allowed by HM&E

TP 176-5112.

File details come from the government source that posted it. Updated .