HII-NNS_RFP_Bidders'_Question__5_020515.docx

DOCX document 20 KB Posted

Attached to
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) Federal contract opportunity
Solicitation number
N0002415R4300
Issued by
Department of the Navy Naval Sea Systems Command

About this file

RFI Response

View the file

Other files for this federal contract opportunity

Other files attached to USS COLUMBUS (SSN 762) Engineering Overhaul (EOH), newest first.
File Type Posted
amendment_0019_USS_COLUMBUS_revised.pdf PDF
CJA_41069.20_SSN_765_and_762_Redacted.pdf PDF
amendment_18.pdf PDF
Amendment_18_Attachment_3.pdf PDF
Amendment_17.pdf PDF
Amendment_16.doc DOC document
amendment_0015.doc DOC document
amendment_0014.pdf PDF
Final_amendment_13.pdf PDF
HII-NNS_762_BQ_12_answer.pdf PDF
EBC_BQ_125_revised_clarification_5FEB2015.pdf PDF
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
HII-NNS_RFP_Bidders'_final_RFP_questions.docx DOCX document
Final_HII-NNS_Final_Questions.pdf PDF
EB_questions_27 _51 _52 _54 _57 _59 _67 _83 _82 _121 _126 _130 _131 _132 _133 _136 _137 _138 _139 _140 _and_141.pdf PDF
amendment_09.doc DOC document
HII_questions_47 _48 _49 _51 _56 _6 _8 _13 _14 _25 _39 _50.pdf PDF
N00024-15-R-4300-0008.doc DOC document
20150123_HII-NNS_answers.pdf PDF
amendment_0007_approved.doc DOC document
EBBQ_15-16-22-23-28-31-32-40-81.pdf PDF
amendment_0006_posting.pdf PDF
NNSBQ_answers_146-6-8-20-33-34-35-40-43-50-22JAN2015.pdf PDF
amendment_05_post_01222015.pdf PDF
20150115-USS_MONTPELIER_IDD_Q7 8_revision.pdf PDF
EB__74_-__Corp_cost_est__765_IDD.xlsx XLSX spreadsheet
HII-NNS_RFP_Bidders'_Question__41_011515_response_011615.pdf PDF
HII-NNS_RFP_Bidders'_Question__18_011515_Response_011615.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
EB__74_Corp_Cost_est_762_EOH.xlsx XLSX spreadsheet
EBC_BQ_74.docx DOCX document
2015JAN14_HII-NNS_Answers.pdf PDF
2015Jan12-EBC_BQ_answers.pdf PDF
Bidders_question_112_FinalRev_011615.pdf PDF
USS_Montpelier_Bidders'_Questions_147_ _148.pdf PDF
N00024-15-R-4300_DD254_(correction)_7_Jan_15.pdf PDF
amendment_0002.doc DOC document
EBC_BQ_Answer_Q33.pdf PDF
USS_Montpelier_IDD_RfC_answers_134.pdf PDF
NNS-USS_Montpelier_IDD_Bidders_Answer_145.pdf PDF
amendment_0001.doc DOC document
REQUEST_FOR_CLARIFICATION_1.doc DOC document
SSN_762_CDRLS_12.11.14.ppt PPT presentation
Solicitation_N00024-15-R-4300.doc DOC document
N00024-15-R-4300_DD254.pdf PDF
SSN_765_CDRLS_12_4_14.ppt PPT presentation
SSN_762_CDRLS_12.11.14.ppt PPT presentation
SSN_765_CDRLS_12_4_14.ppt PPT presentation
N0002415R4300_Section_B_through_K_Draft_Post_121614.doc DOC document
Show all 50

USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR CLARIFICATION

(NO QUESTIONS WILL BE ACCEPTED AFTER) 16 January 2015

NAME OF OFFEROR: NEWPORT NEWS SHIPBUILDING DATE: 12-Jan-15

NAVSEA SOLICITATION NUMBER: N00024-15-R-4300 QUESTION# 5 (RFP) REVISED

SHIPS: USS MONTPELIER SSN 765/USS COLUMBUS SSN 762

SPECIFICATION NO: RFP PARAGRAPH NO.: SECTION E

TITLE: PAGE NO.: 70

QUESTION:

Will the Government include the following clarification in any contract resulting from this solicitation and subsequent proposal submittal?

CLARIFICATION OF "INSURANCE AND LIABILITY" CLAUSE

The following clarification applies to paragraph (b)(3)(i) of the “Insurance and Liability” clause in Section I:

The risks of loss and damage assumed by the Government addressed in paragraph (b)(1) include, but are not limited to, losses or damages which are consequences of defective workmanship or defective materials or equipment, or workmanship or materials which do not conform to the requirements of the contract. The contractor is responsible for the inspection, repair, replacement, or renewal of such defects themselves.

DO NOT WRITE BELOW THIS LINE--- (SPACE BELOW FOR GOV'T USE ONLY) ANSWER:

Yes. The clarification is included in Solicitation N00024-15-R-4300 and will be included in any contract resulting from this solicitation.