EBC_pending_answers_4_11_78_79_116_134_135.pdf

PDF 96 KB Posted

Attached to
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH)
Solicitation number
N0002415R4300
Issued by

About this file

EB answers

View the file

Other files

File Type Posted
amendment_20.doc DOC document
amendment_0019_USS_COLUMBUS_revised.pdf PDF
CJA_41069.20_SSN_765_and_762_Redacted.pdf PDF
SEA07B_Approved_Clarifying_6_4_15_Attachment_2.pdf PDF
amendment_18.pdf PDF
Amendment_18_Attachment_3.pdf PDF
Amendment_17.pdf PDF
Attachment_1_to_amendment_0016.doc DOC document
Amendment_16.doc DOC document
amendment_0015.doc DOC document
amendment_0014.pdf PDF
Final_amendment_13.pdf PDF
Final_amendment_12.doc DOC document
HII-NNS_762_BQ_12_answer.pdf PDF
EBC_BQ_125_revised_clarification_5FEB2015.pdf PDF
HII-NNS_RFP_Bidders'_Question__5_020515.docx DOCX document
EBC_INDUSTRY_DAY_BIDDERS_QUESTIONS.pdf PDF
Final_amendment.doc DOC document
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
HII-NNS_RFP_Bidders'_final_RFP_questions.docx DOCX document
N00024-15-R-4300-0010.doc DOC document
Final_HII-NNS_Final_Questions.pdf PDF
EB_questions_27 _51 _52 _54 _57 _59 _67 _83 _82 _121 _126 _130 _131 _132 _133 _136 _137 _138 _139 _140 _and_141.pdf PDF
HII_questions_47 _48 _49 _51 _56 _6 _8 _13 _14 _25 _39 _50.pdf PDF
amendment_09.doc DOC document
N00024-15-R-4300-0008.doc DOC document
HII-NNS_RFP_bidders_questions_legal_response_sent_to_Marina.docx DOCX document
amendment_0007_approved.doc DOC document
20150123_HII-NNS_answers.pdf PDF
EBBQ_96-110_114_115_answers.pdf PDF
EBBQ_15-16-22-23-28-31-32-40-81.pdf PDF
amendment_0006_posting.pdf PDF
NNSBQ_answers_146-6-8-20-33-34-35-40-43-50-22JAN2015.pdf PDF
2015Jan14-EBC_BQ_answers_1_14_26_41_47_49_53_56_58_64_post_01222015.pdf PDF
amendment_05_post_01222015.pdf PDF
HII-NNS_RFP_Bidders'_Question__18_011515_Response_011615.pdf PDF
EBC_BQ_113__Final_011615.pdf PDF
Final_amendment_0004_FBO.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
20150115-USS_MONTPELIER_IDD_Q7 8_revision.pdf PDF
EB__74_-__Corp_cost_est__765_IDD.xlsx XLSX spreadsheet
HII-NNS_RFP_Bidders'_Question__41_011515_response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
2015Jan12-EBC_BQ_answers.pdf PDF
EB__74_Corp_Cost_est_762_EOH.xlsx XLSX spreadsheet
EBC_BQ_74.docx DOCX document
2015JAN14_HII-NNS_Answers.pdf PDF
HII-NNS_RFP_Bidders'_Question__34_011515_response_011615.pdf PDF
Bidders_question_112_FinalRev_011615.pdf PDF
Pre-Proposal_Conf_final_slides_01132015.pptx PPTX presentation
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DYNAMICS

Electric Boat

REQUEST FOR CLARIFICATION

Name of Offeror: Electric Boat Corporation Date: December 23, 2014

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 4

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 826D08 Title: DHR Pump Removal

Section/Paragraph No.:

Question:

Request clarification regarding note 1 of the SWLIN which indicates “Accomplish if DHR System is used…”

DO NOT WRITE BELOW THIS LINE ---- (SPACE BELOW FOR GOV'T USE ONLY)

Answer:

Performance of ShipAlt, if not already accomplished based on FCR-03 report, would only be accomplished if pump has been unshipped in order to be used (system operation) or if the pump needed to be removed for some other purpose (interference).

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 11

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 860L04 Title: RP Prepare RC

Section/Paragraph No.: KM.0020.0000

Question:

Request clarification regarding shielding requirements in this SWLIN vs those in SWLIN 860L09.

History shows shielding captured in 860L04 only.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 78

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 823B01 Title: NUCLEAR STEAM

GENERATOR

Section/Paragraph No.: 27.0129.1300

Question:

SWLIN states “Inspect steam generator secondary side internals (when steam generator is opened for other purposes).” and refers to RMR 6-M-R-2.

Since there are no requirements within the AWP to open the Steam Generators for any other purpose, can it be assumed that this work will not be required and therefore not be part of the bid estimate?

The Government concurs.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 79

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 827B01 Title: CHARGING

SYSTEM

Section/Paragraph No.: 50.0780.1303

Question:

SWLIN states “Inspect inside the storage tanks and replace the manhole gaskets.” and refers to

RMR 8-M-C-5.

Is there any history with regard to the extent to rework required as a result of the 8-M-C-5 inspections?

Yes, but minor. Past history shows that there is difficulty in the manufacturing of new gaskets for covers, and cleanliness issues occasionally arise during inspection of piping internal to tank.

Work inside the tank is rare after technical disposition.

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 80

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 836B01 Title: REACTOR PLANT

FRESH WATER

COOLING

Section/Paragraph No.: 48.0180.0663 & 48.0180.0684

Question:

48.0180.0663 & 48.0180.0684 require both the FA and SY to inspect and clean the heat exchangers in accordance with 15-M-Q-1R.

1. Will this work be performed jointly by FA and SY?

2. Will the FA issue a REC form for this work in accordance with NAVSEA 0989-037-2000 and NAVSEA 0924-LP-062-0010 and issue a RPWAR in accordance with NAVSEA 0989- 037-2000, or will the SY be responsible for issuing the REC and the RPWAR?

SY should plan on generating work control documents.

Assignments in AWP will remain as is. SY will perform clean and inspect along with maintaining work controls.

Name of Offeror: Electric Boat Corporation Date: January 7, 2015

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 116

Ship(s): SSN 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 201A02 Title: REDUCTION GEAR

(SOUND

ISOLATION

COUPLING

ASSEMBLY)

Section/Paragraph No.: 28.0180.410A

Question:

Is it the Government’s intention to clear DFS 762-1010-2010 by replacing the sound isolation fwd & aft hubs and the matching fwd and aft sound isolation coupling sleeves along with associated hardware? Replacement will require a hull cut, as defined in the DFS. If so, please define material availability and add the required parts to schedule A of the solicitation.

SY should assume material is LLTM and should procure under CLIN 0007.

Name of Offeror: Electric Boat Corporation Date: January 16, 2014

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 134

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 131A01 Title: MAINTENANCE

Section/Paragraph No.: 27.0305.1302

Question:

1. Will the tapped holes and sealing surface for CD-4 and CD-35 hull connections be inspected during these availabilities?

2. What document will be used for the inspection criteria to inspect the tapped holes and sealing surface for CD-4 and CD-35 hull connections?

1. Yes

2. URO MRC 003.

Name of Offeror: Electric Boat Corporation Date: January 16, 2014

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 135

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: N/A

Section Letter: Page No.:

AWP Related Yes

SWLIN No.: 087L01 Title: GENERAL

REQUIREMENTS

RP I&C

EQUIPMENT

Section/Paragraph No.: BT.0140.000

Question:

The Subject SWLIN invokes NAVSEA 0989-0310-4000 for inspection and repair for all Reactor Plant Instrumentation and Control Equipment. This manual provides several levels of inspection requirements based on equipment’s Effective Time in Service (ETIS) and other criteria. Since both ships have received upgrades to Type II I &C, as well as other Field Changes, EB considers the ETIS category to be “SHORT”, requiring only Limited Internal Inspection defined as no disassembly, as required by G/I 21.4.2.

EB requests NAVSEA concurrence regarding the level of inspection identified above. This effects the following CPFF SWLINs:

848B01, 849B01, 847B01, 843B01

The Government concurs. With respect to G/I 21.4.1 of NAVSEA 0989-0310-4000, there are no instances based on NAVSEA08 knowledge of this equipment in which NAVSEA08 intends to direct a different specific category be utilized.

EBC BQ 4 11 78 79 answers
EBC BQ 116 answer
EBC BQ 135 answer