USS COLUMBUS (SSN 762) Engineering Overhaul (EOH)

Awarded Award Notice Posted

Solicitation number
N0002415R4300
Agency
Naval Sea Systems Command Department of the Navy, Department of Defense
Awarded
to Electric Boat Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
N00024-15-C-4300 Federal contract award
NAICS code
336611 Ship Building and Repairing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

28 versions

Update #28 · Latest ·

Added: Sep 10, 2015 8:06 am

Huntington Ingalls Industries, Newport News Shipbuilding, is being awarded a $57,889,458 cost-plus-fixed-fee, delivery-incentive-fee contract to perform planning efforts needed to conduct maintenance, upgrades and modernization efforts on USS Columbus (SSN 762) during the engineered overhaul period. This scope of work encompasses planning as well as maintenance and modernization necessary to maintain full unrestricted operations and ensure the submarine is operating at full technical capability. This contract includes options which, if exercised, would bring the cumulative value of this contract to $288,642,249. Work will be performed in Newport News, Virginia, and is expected to be completed in May 2019.

Update #27 ·

Added: Oct 03, 2014 11:21 am Modified: Jun 09, 2015 11:55 amTrack Changes

The purpose of this notice is to post the redacted point change to the J&A for USS MONTPELIER Interim Dry Dock and USS COLUMBUS Engineering Overhaul Effort. 

Update #26 ·

Added: Jun 09, 2015 11:48 am

The purpose of this notification is to post the redacted point change to the J&A for the MONTPELIER IDD effort. 

Update #25 ·

Added: Oct 03, 2014 11:21 am Modified: Jun 04, 2015 1:27 pmTrack Changes

The purpose of this notice is to post amendment 0018 and its accompanying attachments to solicitation N00024-15-R-4300.

Update #24 ·

Added: Oct 03, 2014 11:21 am Modified: Apr 02, 2015 12:22 pmTrack Changes

The purpose of this notice is to post amendment 0016 and its accompying attachment to solicitation N00024-15-R-4300.

Update #23 ·

Added: Oct 03, 2014 11:21 am Modified: Feb 24, 2015 8:25 amTrack Changes

The purpose of this notice is to post amendment 0015 to solicitation N00024-15-R-4300.

Update #22 ·

Added: Oct 03, 2014 11:21 am Modified: Feb 13, 2015 1:02 pmTrack Changes

The purpose of this notice is to post amendment 0014 to solicitation N00024-15-R-4300 to provide response to a request for information question (RFI). 

Update #21 ·

Added: Oct 03, 2014 11:21 am Modified: Feb 12, 2015 12:59 pmTrack Changes

The purpose of this notice is to post amendment 0013 to solicitation N00024-15-R-4300 to provide response to a request for information question (RFI). 

Update #20 ·

Added: Oct 03, 2014 11:21 am Modified: Feb 05, 2015 2:02 pmTrack Changes

The purpose of this notice is to post amendment 0012 to solicitation N00024-15-R-4300 to provide responses to request for information questions (RFIs). 

Update #19 ·

Added: Oct 03, 2014 11:21 am Modified: Feb 03, 2015 12:58 pmTrack Changes

The purpose of this notice is to post amendment 0011 to solicitation N00024-15-R-4300 to provide responses to request for information questions (RFIs). 

Update #18 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 30, 2015 2:36 pmTrack Changes

The purpose of this notice is to post amendment 0010 to solicitation N00024-15-R-4300 to provide responses to request for information questions (RFIs). 

Update #17 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 29, 2015 11:56 amTrack Changes

The purpose of this notice is to post amendment 0009 to solicitation N00024-15-R-4300 to provide responses to request for information questions (RFIs).

Update #16 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 27, 2015 1:06 pmTrack Changes

The purpose of this notice is to post amendment 0008 to solicitation N00024-15-R-4300 to provide responses to request for information questions (RFIs).

Update #15 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 26, 2015 10:34 amTrack Changes

The purpose of this notice is to post amendment 0007 to solicitation N00024-15-R-4300 to 1) provide responses to request for information questions (RFIs) and 2) Extend the proposal submission date.

Update #14 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 22, 2015 2:21 pmTrack Changes

The purpose of this notice is to post amendment 0006 to solicitation N00024-15-R-4300 to 1) provide responses to request for information questions (RFIs) and 2) incorporate DFAR clause 252.204-7012, Safeguarding of Unclassified Controlled Technical Information. There is no extension to the proposal submission date as a result of this amendment.

Update #13 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 22, 2015 7:27 amTrack Changes

The purpose of this notice is to post amendment 0005 to solicitation N00024-15-R-4300 to 1) correct the page number on 1st page of amendment 04; 2)  provide the missing RFI responses to EB questions 1, 14, 26, 41, 47, 49, 53, 56, 58, and 64; 3) formally state responses for HII questions 18, 34, and 41 are provided in amendment 04; 4) clause 52.232-1 payment is hereby added to section I of the contract; 5) clause 252.235-7000 and 252.235-7001 is hereby deleted from section I of the contract; and 6) an alteration to contract section is hereby added to section I to outline definition of "nuclear risk" and unusual delay. There is no extension to the proposal submission date as a result of this amendment.

Added: Jun 09, 2015 12:43 pm

Naval Sea System Command (NAVSEA) awarded a cost plus fixed fee/delivery incentive fee contract to Electric Boat Corporation to perform planning efforts needed to conduct maintenance upgrades, modernization efforts on the USS MONTPELIER (SSN 765) submarine during its Interim Dry Docking (IDD) period.  The effort inclusive options is worth a total of $259,634,339. 

Update #12 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 16, 2015 2:11 pmTrack Changes

The purpose of this notice is to post amendment 0004 to solicitation N00024-15-R-4300 to 1) provide responses to REQUEST FOR CLARIFICATION questions received; 2) revise Section B Item 0005 and 0011 efforts; 3) incorporate procedures to determine impact on special incentive fee when execution of new work occurs during performance of the contract; 4) revise section B paragraph titled "Incentive for Prompt Proposals for Growth & New Work Procedures" for CLINs 0004, 0006, 0010 and 0012; 5) incorporate additional inspection terms, and 6) delete FAR clauses 52.211-11, c 52.236-14, and 252.217-7007 and add FAR clauses 52.232-20, 52.232-22 and 52.215-16.  . There is no extension to the proposal submission date as a result of this amendment.

Update #11 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 14, 2015 9:45 amTrack Changes

The purpose of this notice is to post the Government slide presentation from the pre-proposal conference on 13 January 2015. There is no extension to the proposal submission date as a result of this amendment.

Update #10 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 12, 2015 1:21 pmTrack Changes

The purpose of this notice is to issue amendment 0003 to Solicitation N00024-15-R-4300. This amendment provides responses to Request for Clarification Questions and a revised Contract Security Classification Specification, DD Form 254. There is no extension to the proposal submission date as a result of this amendment.

Update #9 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 06, 2015 7:57 amTrack Changes

The purpose of this notice is to issue amendment 0002 to Solicitation N00024-15-R-4300. This amendment provides responses to Request for Clarification Questions. There is no extension to the proposal submission date as a result of this amendment.

Update #8 ·

Added: Oct 03, 2014 11:21 am Modified: Jan 05, 2015 12:06 pmTrack Changes

The purpose of this notice is to issue amendment 0001 to Solicitation N00024-15-R-4300. This amendment provides responses to Request for Clarification Questions, adds clause HQ B-2-0015 Payment of Fee(s) (Level of Effort) (NAVSEA) (May 1993) to Section B - Supplies or Services and Prices, and adds clause 5252.216-9122 Level of Effort (Dec 2000) to Section H - Special Contract Requirements. There is no extension to the proposal submission date as a result of this amendment.

Added: Oct 17, 2014 7:37 am Modified: Jan 05, 2015 12:06 pmTrack Changes

Added: Dec 19, 2014 2:48 pm Modified: Jan 05, 2015 12:06 pmTrack Changes

Update #7 ·

Added: Dec 19, 2014 2:48 pm The purpose of this modification to the synopsis for solicitation N00024-15-R-4300 is to post the formal solicitation for responses. This solicitation is limited to Huntington Ingalls Industries and Electric Boat Corporation. Parties interested in subcontracting opportunities should contact Huntington Ingalls Industries and Electric Boat Corporation directly.

It is the intent of the Government to hold pre-proposal conferences the week of 12 January 2015. Additionally, offerors are advised that the responses to the draft solicitation submitted on 18 December 2014 are currently under Government review.

Questions regarding the attached solicitation should be submitted to marina.atchison@navy.mil and kevin.k.giardini@navy.mil.

Update #6 ·

Added: Oct 03, 2014 11:21 am Modified: Dec 16, 2014 12:51 pmTrack Changes

The purpose of this modification is to issue draft solicitation N00024-15-R-4300 Section B through K only. Sections L and M are not provided at this time. It is expected that the Government will post the final solicitation on 19 December 2014. The Contract Data Requirements List (CDRLs) are also being posted at this time and are not expected to be changed. Any comments regarding the attached draft solicitation N00024-15-R-4300 Sections B through K must be submitted to the Contracting Officer, Marina Atchison, at marina.atchison@navy.mil, no later than 1PM on 18 December 2014 for consideration. The Government reserves the right to change Sections B through K in the attached solicitation N00024-15-R-4300 as needed. 

Update #5 ·

Added: Oct 17, 2014 7:37 am The purpose of this modification to the synopsis is to clarify the two lot approach. Offerors should respond to the notice by 3 November 2014 indicating interest in Lot 1 (USS MONTPELIER), Lot 2 (USS COLUMBUS), or Lots 1 and 2 (USS MONTPELIER and USS COLUMBUS).

The Government's intent is not a "winner take all" approach for USS MONTPELIER and USS COLUMBUS. The Government's intent is to issue one solicitation containing the requirements for both USS MONTPELIER (Lot 1) and USS COLUMBUS (Lot 2). In responding to the solcitation an offeror may propose Lot 1 (USS MONTPELIER), Lot 2 (USS COLUMBUS), or Lots 1 and 2 (USS MONTPELIER and USS COLUMBUS). It is anticipated that the Government will evaluate proposal responses by Lot without tradeoffs.

Update #4 ·

Added: Oct 03, 2014 11:21 am Modified: Oct 16, 2014 12:47 pmTrack Changes

 The purpose of this modification is to combine the synopsis for the USS MONTPELIER (SSN 765) Interim Dry Docking (IDD) and the USS COLUMBUS (SSN 762) Engineering Overhaul (EOH).

The Naval Sea Systems Command (NAVSEA) intends to conduct a limited competition for the Fiscal Year (FY) 16 Interim Dry Docking (IDD) for the USS MONTPELIER (SSN 765) and the Fiscal Year (FY) 17 Engineering Overhaul (EOH) for the USS COLUMBUS (SSN 762). The USS MONTPELIER IDD includes advance planning, engineering and design efforts, prefabrication, and shipyard execution. The product of the USS MONTPELIER IDD is a repaired, mission-ready USS MONTPELIER (SSN 765). The USS COLUMBUS EOH includes advance planning, engineering and design efforts, prefabrication, and shipyard execution. The product of the USS COLUMBUS EOH is a repaired, mission-ready USS COLUMBUS.  


 


The Government's intent is to issue a single solicitation containing two Lots of contract line item numbers (CLINs). Lot 1 will be for the USS MONTPELIER IDD requirements including planning and execution. Lot 1 will include options for growth work and new work. Lot 2 will be for the USS COLUMBUS EOH requirements including planning and execution. Lot 2 will include options for growth work and new work. The solicitation is expected to include firm-fixed-price CLINs for planning and execution with special incentives and cost-plus-fixed-fee level-of-effort CLINs for growth work and new work.

This requirement will be competed between Huntington Ingalls Industries, Newport News Shipbuilding (HII-NNS) and General Dynamics, Electric Boat (EB). These two private shipyards are the only nuclear qualified and certified shipyards capable of performing this work. This proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source or a limited number of sources under the authority FAR 6.302. Interested persons may identify their interest and capability to respond to this requirement. 

This notice of intent is not a request for competitive proposals. The notice is for informational purposes only. Solicitation documents are not available at this time.

A determination of the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

The place of performance for this requirement will be determined based on the competition award decision(s). The USS MONTPELIER IDD is projected to start on 15 September 2016 with an expected duration of 15 months. The USS COLUMBUS EOH is projected to start on 25 January 2017 with an expected duration of 20 months.

This notice is for informational purposes only. Solicitation documents are not available at this time. The Government anticipates that an industry day may occur in early December. A separate notice regarding an industry day will be posted once a decision is made. The solicitation will be issued in the early part of FY15 with a tentative date for receipt of the proposal within sixty (60) days of issuance of the solicitation. Positive and negative responses are requested no later than 3 November 2014.

Update #3 ·

Added: Oct 03, 2014 11:21 am Modified: Oct 14, 2014 10:26 amTrack Changes The purpose of this modification is to change the response date to 3 November 2014.

The Naval Sea Systems Command (NAVSEA) intends to conduct a limited competition for the Fiscal Year (FY) 16 Interim Dry Docking (IDD) for the USS MONTPELIER (SSN 765). This IDD includes advance planning, engineering and design efforts, prefabrication, and shipyard execution work necessary to prepare and accomplish maintenance in support of the USS MONTPELIER. The product of this IDD is a repaired, mission-ready USS MONTPELIER (SSN 765).  

This requirement will be competed between Huntington Ingalls Industries, Newport News Shipbuilding (HII-NNS) and General Dynamics, Electric Boat (EB). These two private shipyards are the only nuclear qualified and certified shipyards capable of performing this work. This proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source or a limited number of sources under the authority FAR 6.302. Interested persons may identify their interest and capability to respond to this requirement. 

This notice of intent is not a request for competitive proposals. The notice is for informational purposes only. Solicitation documents are not available at this time.

A determination of the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

The place of performance for this requirement will be determined based on the competition award decision. The IDD is projected to start on 15 September 2016 with an expected duration of 15 months.

This notice is for informational purposes only. Solicitation documents are not available at this time. The solicitation will be issued in the early part of FY15 with a tentative date for receipt of the proposal within sixty (60) days of issuance of the solicitation. Positive and negative responses are requested no later than 3 November 2014.

Update #2 ·

Added: Oct 03, 2014 11:21 am Modified: Oct 14, 2014 10:12 amTrack Changes The purpose of this modification is to change the response date to 3 November 2014.

The Naval Sea Systems Command (NAVSEA) intends to conduct a limited competition for the Fiscal Year (FY) 16 Interim Dry Docking (IDD) for the USS MONTPELIER (SSN 765). This IDD includes advance planning, engineering and design efforts, prefabrication, and shipyard execution work necessary to prepare and accomplish maintenance in support of the USS MONTPELIER. The product of this IDD is a repaired, mission-ready USS MONTPELIER (SSN 765).  

This requirement will be competed between Huntington Ingalls Industries, Newport News Shipbuilding (HII-NNS) and General Dynamics, Electric Boat (EB). These two private shipyards are the only nuclear qualified and certified shipyards capable of performing this work. This proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source or a limited number of sources under the authority FAR 6.302. Interested persons may identify their interest and capability to respond to this requirement. 

This notice of intent is not a request for competitive proposals. The notice is for informational purposes only. Solicitation documents are not available at this time.

A determination of the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

The place of performance for this requirement will be determined based on the competition award decision. The IDD is projected to start on 15 September 2016 with an expected duration of 15 months.

This notice is for informational purposes only. Solicitation documents are not available at this time. The solicitation will be issued in the early part of FY15 with a tentative date for receipt of the proposal within sixty (60) days of issuance of the solicitation. Positive and negative responses are requested no later than 17 November 2014.

Update #1 ·

Added: Oct 03, 2014 11:21 am The Naval Sea Systems Command (NAVSEA) intends to conduct a limited competition for the Fiscal Year (FY) 16 Interim Dry Docking (IDD) for the USS MONTPELIER (SSN 765). This IDD includes advance planning, engineering and design efforts, prefabrication, and shipyard execution work necessary to prepare and accomplish maintenance in support of the USS MONTPELIER. The product of this IDD is a repaired, mission-ready USS MONTPELIER (SSN 765).  

This requirement will be competed between Huntington Ingalls Industries, Newport News Shipbuilding (HII-NNS) and General Dynamics, Electric Boat (EB). These two private shipyards are the only nuclear qualified and certified shipyards capable of performing this work. This proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source or a limited number of sources under the authority FAR 6.302. Interested persons may identify their interest and capability to respond to this requirement. 

This notice of intent is not a request for competitive proposals. The notice is for informational purposes only. Solicitation documents are not available at this time.

A determination of the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.

The place of performance for this requirement will be determined based on the competition award decision. The IDD is projected to start on 15 September 2016 with an expected duration of 15 months.

This notice is for informational purposes only. Solicitation documents are not available at this time. The solicitation will be issued in the early part of FY15 with a tentative date for receipt of the proposal within sixty (60) days of issuance of the solicitation. Positive and negative responses are requested no later than 17 November 2014.

Attachments

Files attached to this notice, newest first
File Type Posted
amendment_20.doc DOC document
amendment_0019_USS_COLUMBUS_revised.pdf PDF
SEA07B_Approved_Clarifying_6_4_15_Attachment_2.pdf PDF
Amendment_18_Attachment_3.pdf PDF
Amendment_17.pdf PDF
Attachment_1_to_amendment_0016.doc DOC document
amendment_0015.doc DOC document
Final_amendment_12.doc DOC document
HII-NNS_RFP_Bidders'_Question__5_020515.docx DOCX document
HII-NNS_RFP_Bidders'_final_RFP_questions.docx DOCX document
Final_amendment.doc DOC document
EBC_pending_answers_4_11_78_79_116_134_135.pdf PDF
EBC_INDUSTRY_DAY_BIDDERS_QUESTIONS.pdf PDF
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
N00024-15-R-4300-0010.doc DOC document
amendment_09.doc DOC document
HII_questions_47 _48 _49 _51 _56 _6 _8 _13 _14 _25 _39 _50.pdf PDF
HII-NNS_RFP_bidders_questions_legal_response_sent_to_Marina.docx DOCX document
NNSBQ_answers_146-6-8-20-33-34-35-40-43-50-22JAN2015.pdf PDF
EBBQ_96-110_114_115_answers.pdf PDF
amendment_0006_posting.pdf PDF
2015Jan14-EBC_BQ_answers_1_14_26_41_47_49_53_56_58_64_post_01222015.pdf PDF
amendment_05_post_01222015.pdf PDF
EB__74_Corp_Cost_est_762_EOH.xlsx XLSX spreadsheet
EBC_BQ_74.docx DOCX document
2015JAN14_HII-NNS_Answers.pdf PDF
2015Jan12-EBC_BQ_answers.pdf PDF
Bidders_question_112_FinalRev_011615.pdf PDF
HII-NNS_RFP_Bidders'_Question__34_011515_response_011615.pdf PDF
EBC_BQ_113__Final_011615.pdf PDF
Final_amendment_0004_FBO.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
Pre-Proposal_Conf_final_slides_01132015.pptx PPTX presentation
HII_AmendedResponses.pdf PDF
2015Jan12-EBC_BQ_answers.pdf PDF
amendment_0003.doc DOC document
USS_Montpelier_Bidders'_Questions_147_ _148.pdf PDF
N00024-15-R-4300_DD254_(correction)_7_Jan_15.pdf PDF
NNS-USS_Montpelier_IDD_Bidders_Answer_145.pdf PDF
EBC_BQ_Answer_Q2.pdf PDF
USS_Montpelier_IDD_RfC_answers_134.pdf PDF
amendment_0001.doc DOC document
REQUEST_FOR_CLARIFICATION_1.doc DOC document
REQUEST_FOR_CLARIFICATION_2.doc DOC document
N00024-15-R-4300_DD254.pdf PDF
SSN_765_CDRLS_12_4_14.ppt PPT presentation
SSN_762_CDRLS_12.11.14.ppt PPT presentation
SSN_765_CDRLS_12_4_14.ppt PPT presentation
N0002415R4300_Section_B_through_K_Draft_Post_121614.doc DOC document
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity