Final_amendment_0004_FBO.pdf
PDF 271 KB Posted
- Attached to
- USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) Federal contract opportunity
- Solicitation number
- N0002415R4300
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
Show all 50
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002415NR92204
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE ATTACHED.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 59
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jan-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-15-R-4300
X 9B. DATED (SEE ITEM 11)
19-Dec-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jan-2015
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
SEA 02433 1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-15-R-4300
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The purpose of Amendment 0004 to Solicitation N00024-15-R-4300 is to 1) provide responses to REQUEST FOR CLARIFICATION questions received, 2) revise Section B Item 0005 and 0011 efforts; 3) incorporate procedures to determine impact on special incentive fee when execution of new work occurs during performance of the contract;
4) revise section B paragraph titled “Incentive for prompt proposals for Growth & New Work Procedures” for CLINs 0004, 0006, 0010 and 0012; 5) incorporate additional inspection terms, and 6) delete FAR clauses 52.211-11, c 52.236-14, and 252.217-7007 and add FAR clauses 52.232-20, 52.232-22 and 52.215-16. Based on the above description, changes are made to solicitation N00024-15-R-4300 as follows:
1. NAVSEA response REQUESTS FOR CLARIFICATION numbers for EB Bidder's Questions 1, 14, 26, 41, 47, 49,53,56,58,64, 74, 113, 112, and 125 and HII Bidder’s Questions 7, 8, 15, 16, 26, 27, 29,31, 32, attached hereto.
2. Under SECTION B – SUPPLIES OR SERVICES AND PRICES,
a. CLIN 0005 is hereby restated as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
OPTION OPN Funded Program Alterations (Nuclear and Non-Nuclear) for USS MONTPELIER (SSN 765) Accomplish the total effort for planning and execution of Nuclear & Non- Nuclear Program Alterations (Ship Alterations & Ordnance Alterations), including labor, non-labor and services on USS MONTPELIER (SSN 765) during its scheduled FY16 Interim Dry Docking (IDD) in accordance with the Statement of Work (SOW) described in Section C.
Furthermore, the effort is to provide services in support of the Ship Alterations being accomplished by the Alteration Installation Teams (AITs)/Customer Contracted Teams (CCTs). The service requirements will be specified by an AIT provided service request, Lead Maintenance Activity (LMA) statement of work, or a division of responsibilities document for each alteration or group of alterations. AIT/CCT Support Requirements Checklists will be provided to define the AIT support service requirements.
The total effort authorized is 6,750 MDs for alterations, non-labor and services.
Requirements in excess of 6,750 MDs will be authorized as a separate contractual action.
Cost-Plus-Fixed-Fee FOB: Origin
PURCHASE REQUEST NUMBER: N0002415NR92204
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
b. CLIN 0011 is hereby restated to the following:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
OPTION OPN Funded Program Alterations (Nuclear & Non-Nuclear) for USS COLUMBUS (SSN 762) Accomplish the total effort for planning and execution of Nuclear & Non- Nuclear Program Alterations (Ship Alterations & Ordnance Alterations), including labor, non-labor and services on USS COLUMBUS (SSN 762) during its scheduled FY17 Engineered Overhaul (EOH) in accordance with the Statement of Work (SOW) described in Section C.
Furthermore, this effort is also to provide services in support of the Ship Alterations being accomplished by the Alteration Installation Teams (AITs)/Customer Contracted Teams (CCTs). The service requirements will be specified by an AIT provided service request, Lead Maintenance Activity (LMA) statement of work, or a division of responsibilities document for each alteration or group of alterations. AIT/CCT Support Requirements Checklists will be provided to define the AIT support service requirements.
The total effort authorized is 6,750 MDs for alterations, non-labor and services.
Requirements in excess of 6,750 MDs will be authorized as a separate contractual action.
Cost-Plus-Fixed-Fee FOB: Origin
PURCHASE REQUEST NUMBER: N0002415NR92204
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
c. the following section B paragraphs are hereby changed:
i. the pricing sheet for Lot 1 USS MONTPELIER and Lot 2 USS COLUMBUS are hereby revised to (changes are made in red and bold):
LOT 1 PRICING SHEET USS MONTPELIER
TYPE CLIN MAN
DAYS
Estimated Cost Base
Fee/Profit Special Incentive Fee/Profit
FCCOM
Cost
Total Est.
Cost Plus Fee/Price
CPFF/Comp 0001
NSP 0002 NA
FFP 0003
CPFF-LOE 0004 68,000
CPFF-LOE 0005 6,750
CPFF-LOE 0006 10,000
Total LOT 1
LOT 2 PRICING SHEET USS COLUMBUS
TYPE CLIN MAN
DAYS
Estimated Cost
Base Fee/Profit
Special Incentive Fee/Profit
FCCOM
Cost
Total Est.
Cost Plus Fee/Price
CPFF/Comp 0007
NSP 0008 NA
FFP 0009
CPFF-LOE 0010 92,700
CPFF-LOE 0011 6,750
CPFF-LOE 0012 16,000
ii. paragraph stating: “B. Opening, Inspecting and Reporting Requirements/Special Incentive (CLIN 0003)” is hereby revised to: (changes are highlighted in red and bold):
B. Opening, Inspecting and Reporting Requirements/Special Incentive (CLIN 0003)
This incentive requires the Contractor to perform all open, inspect and report requirements early enough in the availability to identify unknowns or unexpected problems which could potentially impact cost and/or schedule. This incentive can be earned by the Contractor for fulfillment of the following:
a. The full amount of this incentive shall be paid for completion of all open, inspect and reporting requirements for items listed on the USS MONTPELIER (SSN 765) IDD OPEN AND INSPECT PLAN , if accomplished on or before the date identified as the incentive fee date. The Open and Inspect Plan (CDRL
019) shall be proposed by the contractor and submitted to the Supervisor for approval by the government by A-1 Month, and include specific document numbers that fully encompass all open and inspect activities reflected in the AWP and proposed completion dates that reflect accomplishment of each document. Each item (defined as one of the line items in the Open and Inspect Plan subject to the incentive clause) which does not meet the incentive fee date will result in a downward adjustment from the incentive amount, as determined by the Incentive Determination Procedure.
b. If either of the two scenarios below is true, none of the incentive fee shall be deemed to have been earned by the Contractor:
(1) On _____ (day to reflect the midpoint of the docking period) (adjusted, if necessary, due to IDD start date change) any outstanding open, inspect and reportable items remain.
(2) If 10% of the total line items or more items are not accomplished in accordance with the Open and Inspect Plan incentive fee date schedules.
c. Within (5) business days of completing an open and inspect item, a report, procedures as agreed upon between the Supervisor and contractor, should be generated and submitted to the Supervisor. This report should provide full disclosure of the results of the inspection. Each report should clearly state the title of the inspection (as identified in the Open and Inspect Plan), the purpose of the inspection, a clear description of the condition found, all deficiencies for the specific item including any conjunctive maintenance required, a recommended corrective action for all noted deficiencies, a list of any contingency/additional material required, any impact that the condition may pose to schedule, and an estimated cost for correction of the problem found. The contractor shall provide a weekly status report of progress completing Open and Inspects actions to the Open and Inspect Plan.
The contractor shall propose up to an 11% base profit for CLIN 0003. This incentive will be an additional 1% of the profit available to be earned against the total cost established under CLIN 0003.
The Navy recognizes that additional growth and new work may have an effect on schedule (docking period, undocking, and fast cruise) which will be negotiated on a case-by-case basis by the Administrative Contracting Officer. The Government will make best and reasonable efforts to definitize all growth work in a timely manner.
iii. Paragraph “C. Milestone Schedule Incentive (CLIN 0003)” is hereby revised to:
(changes are highlighted in red and bold):
C. Milestone Schedule Incentive (CLIN 0003)
Submarine maintenance and modernization is required at prescribed intervals within the life cycle of a submarine to sustain its safety and tactical integrity for extended periods of deployment. Submarine maintenance and modernization is directly related to ensuring the safety of the crew. The goal of this availability is to complete the work required within the AWP and return the ship back to the fleet so that the submarine can perform assigned missions and continue to be an operating asset to the Navy.
The nature of submarine repair realizes a certain amount of normal and usual repair work within the basic contract.
In addition, growth and new work will come from open and inspect requirements. This should be assumed in planning the execution of the availability. Since the contractor is an expert in the accomplishment of submarine maintenance, they should be knowledgeable in the expectations of growth work. The contractor should develop a schedule to manage accomplishment of all repair work, including normal and usual repairs within the period of performance set forth for execution of this availability. This is required to ensure the government will have all repairs and modernization completed as quickly and as accurately as possible.
This incentive requires the contractor to ensure the availability is progressing, and adhering to the approved contractor milestone schedule, and to ensure that the availability does not exceed the specified period of performance. The contractor’s performance will be evaluated by the reviewing official at two separate milestones:
(1) Completion of Undocking, and (2) Start of Fast Cruise.
CNO availability dates - 15 September 2016 through 15 December 2017.
The contractor shall propose up to an 11% base profit for CLIN 0003. This incentive will be an additional 3% (1.5% for completion of undocking and 1.5% for start of Fast Cruise) of the profit available to be earned against the total cost established under CLIN 0003.
The Navy recognizes that additional growth and new work may have an effect on schedule (docking period, undocking, and fast cruise) which will be negotiated on a case-by-case basis by the Administrative Contracting Officer. The Government will make best and reasonable efforts to definitize all growth work in a timely manner.
iv. Paragraphs “D Incentive for Prompt Proposals for Growth & New Work (CLINs 0004 and 0006)” is hereby changed to as follows:
D. Incentive for Prompt Proposals for Growth & New Work (CLINs 0004 and 0006)
As required by DFARS 217.7404-6, the profit/fee for any undefinitized action negotiated after a substantial portion of the required performance has been completed shall reflect the reduced cost risk to the contractor for costs incurred during contract performance before negotiation of the final price and the contractor's reduced cost risk for costs incurred during performance of the remainder of the contract. The timely negotiation of undefinitized contract actions requires timely receipt of qualifying proposals. Consequently, the profit/fee allowed for undefinitized contract actions for which qualifying proposals are not received within 30 days of the authorization of the undefinitized action shall be reduced by 1%.
Note: Proposal requirements to determine if a proposal is qualifying are detailed in FAR Part 15 Table 15- 2, FAR 15.408. The definition of undefinitized contract action is found at DFARS 217.7401.
The ACO will make a determination if a proposal is qualifying within 10 calendar days after proposal receipt.
v. Paragraph “B. Opening, Inspecting and Reporting Requirements/Special Incentive (CLIN 0009)” is hereby changed to (changes made in red and bold):
B. Opening, Inspecting and Reporting Requirements/Special Incentive (CLIN 0009)
This incentive requires the Contractor to perform all open, inspect and report requirements early enough in the availability to identify unknowns or unexpected problems which could potentially impact cost and/or schedule. This incentive can be earned by the Contractor for fulfillment of the following:
a. The full amount of this incentive shall be paid for completion of all open, inspect and reporting requirements for items listed on the USS COLUMBUS (SSN 762) EOH OPEN AND INSPECT PLAN , if accomplished on or before the date identified as the incentive fee date. The Open and Inspect Plan (CDRL
019) shall be proposed by the contractor and submitted to the Supervisor for approval by the government prior to A-1 Month, and include specific document numbers and proposed completion dates that reflect accomplishment. Each item (defined as one of the line items in the Open and Inspect Plan subject to the incentive clause) which does not meet the incentive fee date will result in a downward adjustment from the incentive amount.
b. If either of the two scenarios below is true, none of the incentive fee shall be deemed to have been earned by the Contractor:
(1) On ____ (day to reflect the mid-point of the docking period) (adjusted, if necessary due to EOH start date change) any outstanding open, inspect and reportable items remain.
(2) If 10% of the total line items or more items are not accomplished in accordance with the Open and Inspect Plan incentive fee date schedules.
c. Within (5) business days of completing an open and inspect item, a report, procedures as agreed upon between the Supervisor and contractor, should be generated and submitted to the Supervisor. This report should provide full disclosure of the results of the inspection. Each report should clearly state the title of the inspection (as identified on the Open and Inspect Plan CDRL A019), the purpose of the inspection, a clear description of the condition found, all deficiencies for the specific item including any conjunctive maintenance required, a recommended corrective action for all noted deficiencies, a list of any contingency/additional material required, any impact that the condition may pose to schedule, and an estimated cost for correction of the problem found. The contractor shall provide a weekly status report of progress completing Open and Inspects actions to the Open and Inspect Plan.
The contractor shall propose up to an 11% base profit for CLIN 0009. This incentive will be an additional 1% of the profit available to be earned against the total cost established under CLIN 0009.
The Navy recognizes that additional growth and new work may have an effect on schedule (docking period, undocking, and fast cruise) which will be negotiated on a case-by-case basis by the
vi. Paragraph “Milestone Schedule Incentive (CLIN 0009)” is hereby changed to: (changes are made in red and bold)
C. Milestone Schedule Incentive (CLIN 0009)
Submarine maintenance and modernization is required at prescribed intervals within the life cycle of a submarine to sustain its safety and tactical integrity for extended periods of deployment. Submarine maintenance and modernization is directly related to ensuring the safety of the crew. The goal of this availability is to complete the work required within the AWP and return the ship back to the fleet so that the submarine can perform assigned missions and continue to be an operating asset to the Navy.
The nature of submarine repair realizes a certain amount of normal and usual repair work within the basic contract. In addition, growth and new work will come from open and inspect requirements. This should be assumed in planning the execution of the availability. Since the contractor is an expert in the accomplishment of submarine maintenance, they should be knowledgeable in the expectations of growth work. The contractor should develop a schedule to manage accomplishment of all repair work, including normal and usual repairs within the period of performance set forth for execution of this availability. This is required to ensure the government will have all repairs and modernization completed as quickly and as accurately as possible.
This incentive requires the contractor to ensure the availability is progressing, and adhering to the approved contractor milestone schedule, and to ensure that the availability does not exceed the specified period of performance. The contractor’s performance will be evaluated by the reviewing official at two separate milestones: (1) Completion of Undocking, and (2) Start of Fast Cruise.
CNO availability dates - 25 January 2017 through 12 September 2018.
The contractor shall propose up to an 11% base profit for CLIN 0009. This incentive will be an additional 3% (1.5% for completion of undocking and 1.5% for start of Fast Cruise) of the profit available to be earned against the total cost established under CLIN 0009.
The Navy recognizes that additional growth and new work may have an effect on schedule (docking period, undocking, and fast cruise) which will be negotiated on a case-by-case basis by the
vii. Paragraph “Incentive for Prompt Proposals for Growth & New Work (CLINs 0010 and 0012)” is hereby changed to as follows:
D. Incentive for Prompt Proposals for Growth & New Work (CLINs 0010, and 0012)
As required by DFARS 217.7404-6, the profit/fee for any undefinitized action negotiated after a substantial portion of the required performance has been completed shall reflect the reduced cost risk to the contractor for costs incurred during contract performance before negotiation of the final price and the contractor's reduced cost risk for costs incurred during performance of the remainder of the contract. The timely negotiation of undefinitized contract actions requires timely receipt of qualifying proposals. Consequently, the profit/fee allowed for undefinitized contract actions for which qualifying proposals are not received within 30 days of the authorization of the undefinitized action shall be reduced by 1%.
Note: Proposal requirements to determine if a proposal is qualifying are detailed in FAR Part 15 Table 15- 2, FAR 15.408. The definition of undefinitized contract action is found at DFARS 217.7401.
The ACO will make a determination if a proposal is qualifying within 10 calendar days after proposal receipt.
3. Under Section C-Descriptions and Specifications,
a. Under item 0001, the below paragraph is changed:
From:
(d) The Contractor shall accomplish the following work for all authorized non-nuclear “K” and “D&F” SHIPALTs and Alterations and Improvements (A&I) Items:
TO:
(d) The Contractor shall accomplish the following work for all authorized non-nuclear Ordnance Alterations, “K” and “D&F” SHIPALTs and Alterations and Improvements (A&I) Items:
b. Under Item 0003, chart illustrating ship work line item numbers (SWLINs) from the AWP is revised to the following (deletion made in strikethrough text):
HULL AVAIL SWLIN TYPE CONTRACT SWLIN SYSTEM ASSIGNMENT
765 IDD01 013K03 FFP CLIN 0003 Engineering and Design Services SY
765 IDD01 033A01 FFP CLIN 0003
Ship Handling and Worksite Preparations SY
765 IDD01 034A01 FFP CLIN 0003
Ship Handling and Worksite Preparations SY
765 IDD01 035A01 FFP CLIN 0003
Ship Handling and Worksite Preparations SY
765 IDD01 036I01 FFP CLIN 0003
Ship Handling and Worksite Preparations SY
765 IDD01 041A01 FFP CLIN 0003 Ship Support SY 765 IDD01 042A01 FFP CLIN 0003 Ship Support SY 765 IDD01 044A01 FFP CLIN 0003 Ship Support SY 765 IDD01 045A01 FFP CLIN 0003 Ship Support SY 765 IDD01 051U01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 052I01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 054A01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 055I01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 066A01 FFP CLIN 0003 Inspection and Quality Control SY 765 IDD01 073A01 FFP CLIN 0003 Shipboard Test Program SY 765 IDD01 082A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 091I01 FFP CLIN 0003 Special Services SY/SF 765 IDD01 248A01 FFP CLIN 0003 Main Storage Battery and Support SY/SF 765 IDD01 558A01 FFP CLIN 0003 Auxiliary Fresh Water Cooling SY
765 IDD01 609A01 FFP CLIN 0003 Equipment (Utility Spaces, Workshops, Laboratories, Test Areas) SY
765 IDD01 709A01 FFP CLIN 0003 Weapons Handling and Stowage SY 765 IDD01 901I01 FFP CLIN 0003 General Requirements SY 765 IDD01 903I01 FFP CLIN 0003 General Requirements SY 765 IDD01 904I02 FFP CLIN 0003 General Requirements SY 765 IDD01 905A01 FFP CLIN 0003 Inspection and Certification SY/SF/SA 765 IDD01 014B01 FFP CLIN 0003 Reactor Plant - General SY/FA 765 IDD01 080B01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 080B02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 080B03 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 083B01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 608D24 FFP CLIN 0003 Storerooms, Stowage and Lockers SY 765 IDD01 612D24 FFP CLIN 0003 Furnishings SY
765 IDD01 831B02 FFP CLIN 0003 Coolant Purification SY 765 IDD01 831D33 FFP CLIN 0003 Coolant Purification SY 765 IDD01 840D27 FFP CLIN 0003 Steam Generating SY 765 IDD01 844D20 FFP CLIN 0003 Nuclear Instrumentation SY 765 IDD01 847D42 FFP CLIN 0003 Primary Plant Control SY 765 IDD01 848D11 FFP CLIN 0003 Steam Generator Water Level Control SY 765 IDD01 848E12 FFP CLIN 0003 Steam Generator Water Level Control SY 765 IDD01 853E11 FFP CLIN 0003 Radiation Monitoring SY 765 IDD01 860L01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L06 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L09 FFP CLIN 0003 Reactor Plant - General SY/FA 765 IDD01 861L01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L03 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L04 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L06 FFP CLIN 0003 Reactor Plant - General SY
c. Under Item 0004, chart illustrating ship work line item numbers (SWLINs) from the AWP is
HULL AVAIL SWLIN TYPE CONTRACT SWLIN SYSTEM ASSIGNMENT
765 IDD01 022A01 CPFF CLIN 0004 Pre-Availability Planning
NSWCCD/SY
SF
765 IDD01 025A01 CPFF CLIN 0004 Pre-Availability Planning SY/SF
TYCOM
765 IDD01 025A02 CPFF CLIN 0004 Pre-Availability Planning SY
765 IDD01 032A01 CPFF CLIN 0004
Ship Handling and Worksite Preparations SY/SF
765 IDD01 037A01 CPFF CLIN 0004
Ship Handling and Worksite Preparations SY
765 IDD01 043I01 CPFF CLIN 0004 Ship Support SY 765 IDD01 071A01 CPFF CLIN 0004 Shipboard Test Program SY 765 IDD01 076A01 CPFF CLIN 0004 Shipboard Test Program SY 765 IDD01 083A01 CPFF CLIN 0004 Trials and Certification SY 765 IDD01 087A01 CPFF CLIN 0004 Trials and Certification SY 765 IDD01 111A01 CPFF CLIN 0004 Superstructure and Fairwater SY 765 IDD01 131A01 CPFF CLIN 0004 Pressure Hull SY 765 IDD01 132A01 CPFF CLIN 0004 Non-Pressure Hull SY 765 IDD01 156I01 CPFF CLIN 0004 Ballast SY
765 IDD01 170A01 CPFF CLIN 0004 Watertight Hatches (Pressure Hull), Trunks and Enclosures SY
765 IDD01 176A01 CPFF CLIN 0004 Tanks, Built-in SY 765 IDD01 177A01 CPFF CLIN 0004 Internal Structural Bulkheads SY
765 IDD01 178A01 CPFF CLIN 0004 Platforms, Walking Flats and Non- Structural Bulkheads SY
765 IDD01 178C10 CPFF CLIN 0004 Platforms, Walking Flats and Non- Structural Bulkheads SY
765 IDD01 178C11 CPFF CLIN 0004 Platforms, Walking Flats and Non- Structural Bulkheads SY
765 IDD01 201A05 CPFF CLIN 0004
Main Shaft Thrust Bearing and Vibration Reducer SY
765 IDD01 201A06 CPFF CLIN 0004 Main Condensers SY 765 IDD01 203A01 CPFF CLIN 0004 Shafting, Bearings and Propellers SY
765 IDD01 204A01 CPFF CLIN 0004 Snorkel SY 765 IDD01 209A01 CPFF CLIN 0004 Main Sea Water SY 765 IDD01 211A01 CPFF CLIN 0004 Propulsion Lube Oil SY 765 IDD01 236A01 CPFF CLIN 0004 SSTG Lube Oil SY 765 IDD01 237A01 CPFF CLIN 0004 Lube Oil Transfer and Purification SY 765 IDD01 246A01 CPFF CLIN 0004 Secondary Propulsion SY
765 IDD01 300A02 CPFF CLIN 0004 Electric Power Generation (Diesel Generator Set)
SF/SY
TYCOM
765 IDD01 307A01 CPFF CLIN 0004 Ship's Service Motor Generator Sets SY 765 IDD01 308A01 CPFF CLIN 0004 AC Power Distribution Switchboards SY 765 IDD01 309A01 CPFF CLIN 0004 DC Power Distribution Switchboards SY
765 IDD01 404A01 CPFF CLIN 0004
Electronic Warfare Support Measures
(ESM) SY
765 IDD01 406A01 CPFF CLIN 0004 Acoustic Countermeasure SY 765 IDD01 408A01 CPFF CLIN 0004 Radar; General SY 765 IDD01 425A01 CPFF CLIN 0004 Sonar; Passive SY 765 IDD01 426A01 CPFF CLIN 0004 Sonar; Active SY 765 IDD01 429A01 CPFF CLIN 0004 Sonar; Utility SY 765 IDD01 430A01 CPFF CLIN 0004 Sonar; Hydrophones and Transducers SY
765 IDD01 435A01 CPFF CLIN 0004
Interior Communications; Order, Safety and Warning SY
765 IDD01 437A01 CPFF CLIN 0004
Interior Communications; Metering and Indicating SY
765 IDD01 437C28 CPFF CLIN 0004
Interior Communications; Metering and Indicating SY
765 IDD01 440A01 CPFF CLIN 0004 Radio; Medium Frequency and High Frequency (MF/HF) SY
765 IDD01 442A01 CPFF CLIN 0004 Radio; Ultra High Frequency (UHF) SY 765 IDD01 501A01 CPFF CLIN 0004 Ventilation SY 765 IDD01 502A01 CPFF CLIN 0004 Air Conditioning SY 765 IDD01 503A01 CPFF CLIN 0004 Refrigeration SY 765 IDD01 505A01 CPFF CLIN 0004 Plumbing SY 765 IDD01 505C06 CPFF CLIN 0004 Plumbing SY 765 IDD01 508A01 CPFF CLIN 0004 Trim SY 765 IDD01 509A01 CPFF CLIN 0004 Potable Water SY 765 IDD01 513A01 CPFF CLIN 0004 High Pressure Air SY 765 IDD01 513C24 CPFF CLIN 0004 High Pressure Air SY 765 IDD01 515A01 CPFF CLIN 0004 Buoyancy Control SY 765 IDD01 518A01 CPFF CLIN 0004 Steering and Diving (Hydraulics) SY
765 IDD01 518A02 CPFF CLIN 0004 Steering and Diving (Structural, Mechanical and Electrical Control) SY
765 IDD01 520A01 CPFF CLIN 0004
Mooring, Towing and Anchor Handling SY
765 IDD01 529A01 CPFF CLIN 0004 Low Pressure Blow SF/SY 765 IDD01 530A01 CPFF CLIN 0004 Service Air SY
765 IDD01 533A01 CPFF CLIN 0004
Oxygen (Main Oxygen and Oxygen Generator) SY
765 IDD01 534A01 CPFF CLIN 0004 Rescue, Salvage and Survival SY 765 IDD01 539A01 CPFF CLIN 0004 Outboard Greasing SY 765 IDD01 540A01 CPFF CLIN 0004 Emergency Ballast Tank Blow SY 765 IDD01 552A01 CPFF CLIN 0004 Ship's Service Hydraulic SY 765 IDD01 553A01 CPFF CLIN 0004 External Hydraulic SY/SF 765 IDD01 561A01 CPFF CLIN 0004 Auxiliary Sea Water SY
765 IDD01 562A01 CPFF CLIN 0004 Drain SY 765 IDD01 562C12 CPFF CLIN 0004 Drain SY 765 IDD01 564A01 CPFF CLIN 0004 Hovering and Depth Control SY 765 IDD01 567A01 CPFF CLIN 0004 Diesel Supporting SY 765 IDD01 568A01 CPFF CLIN 0004 Trash Disposal SY 765 IDD01 605A01 CPFF CLIN 0004 Painting, Interior and Bilges SY 765 IDD01 607A01 CPFF CLIN 0004 Insulation (Hull, Bulkhead, Deck) SY 765 IDD01 608A01 CPFF CLIN 0004 Storerooms, Stowage and Lockers SY/SF 765 IDD01 612P25 CPFF CLIN 0004 Furnishing SY 765 IDD01 708A01 CPFF CLIN 0004 Torpedo Tubes SY 765 IDD01 708F02 CPFF CLIN 0004 Torpedo Tubes/Torpedoes SY 765 IDD01 708F03 CPFF CLIN 0004 Torpedo Tubes/Torpedoes SY 765 IDD01 714A01 CPFF CLIN 0004 3 Inch Launcher SY 765 IDD01 715A01 CPFF CLIN 0004 Vertical Launch SY 765 IDD01 717A01 CPFF CLIN 0004 Torpedo Ejection SY 765 IDD01 028B01 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 040B01 CPFF CLIN 0004 Temporary Utilities and Services SY 765 IDD01 087B02 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 131B01 CPFF CLIN 0004 Hull Decontamination SY 765 IDD01 177B01 CPFF CLIN 0004 Reactor Compartment SY 765 IDD01 823B01 CPFF CLIN 0004 Nuclear Steam Generator SY 765 IDD01 826B01 CPFF CLIN 0004 Reactor Coolant SY 765 IDD01 827B01 CPFF CLIN 0004 Coolant Charging SY 765 IDD01 827B02 CPFF CLIN 0004 Valve Operating SY 765 IDD01 828B01 CPFF CLIN 0004 Coolant Pressurizing SY 765 IDD01 830B01 CPFF CLIN 0004 Coolant Discharge SY 765 IDD01 832B01 CPFF CLIN 0004 Coolant Sampling SY 765 IDD01 835B01 CPFF CLIN 0004 Reactor Air SY 765 IDD01 836B01 CPFF CLIN 0004 Reactor Plant Fresh Water Cooling SY 765 IDD01 837B01 CPFF CLIN 0004 Primary Shield Water FA/SY 765 IDD01 839B01 CPFF CLIN 0004 Main Steam (Nuclear) SY 765 IDD01 840B01 CPFF CLIN 0004 Steam Generating SY 765 IDD01 841B01 CPFF CLIN 0004 Condensate and Feed (Nuclear) SY 765 IDD01 843B01 CPFF CLIN 0004 Reactor Rod Control SY 765 IDD01 847B01 CPFF CLIN 0004 Primary Plant Control SY 765 IDD01 848B01 CPFF CLIN 0004 Steam Generator Water Level Control SY 765 IDD01 849B01 CPFF CLIN 0004 Primary Nuclear Instrumentation SY 765 IDD01 853B01 CPFF CLIN 0004 Radiation Monitoring and Surveys SY 765 IDD01 854B01 CPFF CLIN 0004 Radiation Shielding (Primary) SY 765 IDD01 860L03 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 860L04 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 860L05 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 860L07 CPFF CLIN 0004 Reactor Plant - General SY
d. Item 0005 description is hereby revised to state the following:
Item 0005 –
The contractor shall accomplish the total effort for planning and execution of Nuclear & Non-Nuclear Program Alterations (Ship Alterations & Ordnance Alterations), including labor, non-labor and services on USS MONTPELIER (SSN 765) during its scheduled FY16 Interim Dry Docking (IDD) in accordance with the Statement of Work (SOW) described in Section C. The following SWLINs authorize alterations for Shipyard accomplishment:
Non Nuclear:
765 IDD01 708F02 CPFF CLIN 0005 Torpedo Tubes/Torpedoes SY 765 IDD01 708F03 CPFF CLIN 0005 Torpedo Tubes/Torpedoes SY
Nuclear:
765 IDD01 848E12 CPFF CLIN 0005 Steam Generator Water Level Control SY 765 IDD01 853E11 CPFF CLIN 0005 Radiation Monitoring SY
Furthermore, the contractor will be required to provide services in support of the Ship Alterations being accomplished by the Alteration Installation Teams (AITs) and Customer Contracted Teams (CCTs). The service requirements will be specified by an AIT/CCT provided service request, Lead Maintenance Activity (LMA) statement of work or a division of responsibilities document for each alteration or group of alterations and processed as a point change to this work item. Services contemplated under this work item include: crane services, material handling, packaging and shipping, rigging, compressed air, storage/lay down areas, office space, tank work, welding services, sandblasting/painting services, insulation/lagging services, staging, temporary electrical services, ventilation/temporary air conditioning, special tools, sheet metal services and hazardous waste disposal.
This contract line item (CLIN) provides a Not-to-Exceed (NTE) number of man days, within the fully burdened man day rate, required to accomplish Nuclear and Non-Nuclear Program alterations and support the AIT/CCT efforts for this availability. The authorized man days will be negotiated, as necessary, drawing from the man days established for this CLIN. During the availability any additional shipyard alterations or support service requirements identified by the AIT/CCT will be authorized by a separate point change to the work item and, when authorized, will be deducted from the established NTE man days. The man days within this CLIN shall be accomplished within the established period of performance for the availability. AIT/CCT support service requirements in excess of this CLIN will be authorized as separate contractual action.
The total effort authorized is 6,750 MDs for alterations, non-labor and services. Requirements in excess of 6,750 MDs will be authorized as a separate contractual action.
e. Under item 0007, the below paragraph is changed:
From:
(d) The Contractor shall accomplish the following work for all authorized non-nuclear “K” and “D&F” SHIPALTs and Alterations and Improvements (A&I) Items:
To:
(d) The Contractor shall accomplish the following work for all authorized non-nuclear Ordnance Alterations, “K” and “D&F” SHIPALTs and Alterations and Improvements (A&I) Items:
f. Under Item 0009, chart illustrating ship work line item numbers (SWLINs) from the AWP is
HULL AVAIL SWLIN TYPE CONTRTACT SWLIN SYSTEM ASSIGNMENT
762 EOH01 013K03 FFP CLIN 0009 Engineering and Design Services SY 762 EOH01 032A01 FFP CLIN 0009 Ship Handling and Worksite
Preparations
SY/SF
762 EOH01 033A01 FFP CLIN 0009 Ship Handling and Worksite Preparations
SY
762 EOH01 034A01 FFP CLIN 0009 Ship Handling and Worksite Preparations
SY
762 EOH01 035A01 FFP CLIN 0009 Ship Handling and Worksite Preparations
SY
762 EOH01 036I01 FFP CLIN 0009 Ship Handling and Worksite Preparations
SY
762 EOH01 037A01 FFP CLIN 0009 Ship Handling and Worksite Preparations
SY
762 EOH01 041A01 FFP CLIN 0009 Ship Support SY 762 EOH01 042A01 FFP CLIN 0009 Ship Support SY 762 EOH01 044A01 FFP CLIN 0009 Ship Support SY 762 EOH01 045A01 FFP CLIN 0009 Ship Support SY 762 EOH01 051U01 FFP CLIN 0009 Production Services and Support SY 762 EOH01 052I01 FFP CLIN 0009 Production Services and Support SY 762 EOH01 054A01 FFP CLIN 0009 Production Services and Support SY 762 EOH01 055I01 FFP CLIN 0009 Production Services and Support SY 762 EOH01 073A01 FFP CLIN 0009 Shipboard Test Program SY 762 EOH01 082A01 FFP CLIN 0009 Trials and Certification SY 762 EOH01 083A01 FFP CLIN 0009 Trials and Certification SY 762 EOH01 084H01 FFP CLIN 0009 Trials and Certification SY 762 EOH01 091I01 FFP CLIN 0009 Special Services SY/SF 762 EOH01 111C15 FFP CLIN 0009 Superstructure and Fairwater SY
762 EOH01 170C04 FFP CLIN 0009 Watertight Hatches (Pressure Hull), Trunks, and Enclosures SY
762 EOH01 248A01 FFP CLIN 0009 Main Storage Battery and Support SY/SF 762 EOH01 248C15 FFP CLIN 0009 Main Storage Battery and Support SY 762 EOH01 302C23 FFP CLIN 0009 Power Distribution and Electric Plant
Control
SY
762 EOH01 509A01 FFP CLIN 0009 Potable Water SY 762 EOH01 513C25 FFP CLIN 0009 High Pressure Air SY 762 EOH01 532C16 FFP CLIN 0009 Atmosphere Control SY 762 EOH01 608C27 FFP CLIN 0009 Storerooms, Stowage and Lockers SY 762 EOH01 609A01 FFP CLIN 0009 Equipment (Utility Spaces, Workshops, Laboratories, Test Areas)
SY
762 EOH01 609C08 FFP CLIN 0009 Equipment (Utility Spaces, Workshops, Laboratories, Test Areas)
SY
762 EOH01 611A01 FFP CLIN 0009 Equipment (Galley, Pantry, Scullery, Commissary)
SY
762 EOH01 709A01 FFP CLIN 0009 Weapons Handling and Stowage SY 762 EOH01 714C07 FFP CLIN 0009 3 Inch Launcher SY 762 EOH01 714C11 FFP CLIN 0009 3 Inch Launcher SY 762 EOH01 901I01 FFP CLIN 0009 General Requirements SY 762 EOH01 903I01 FFP CLIN 0009 General Requirements SY/SA 762 EOH01 904I02 FFP CLIN 0009 General Requirements SY 762 EOH01 905A01 FFP CLIN 0009 Inspection and Certification SY/SF/SA 762 EOH01 080B01 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 080B02 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 080B03 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 083B01 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 087B02 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 087L01 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 831B01 FFP CLIN 0009 Coolant Purification SY 762 EOH01 831B02 FFP CLIN 0009 Coolant Purification SY 762 EOH01 831D33 FFP CLIN 0009 Coolant Purification SY 762 EOH01 837B01 FFP CLIN 0009 Primary Shield Water SY 762 EOH01 839D16 FFP CLIN 0009 Main Steam (Nuclear) SY 762 EOH01 853E11 FFP CLIN 0009 Radiation Monitoring SY
762 EOH01 854B01 FFP CLIN 0009 Radiation Shielding (Primary) SY 762 EOH01 860L06 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 861L04 FFP CLIN 0009 Reactor Plant - General SY 762 EOH01 861L06 FFP CLIN 0009 Reactor Plant - General SY
g. Under Item 0009, chart illustrating ship work line item numbers (SWLINs) from the AWP is
HULL AVAI
L
SWLIN TYP
E
CONTRACT SWLIN SYSTEM ASSIGNME
NT
762 EOH01 022A01 CPFF CLIN 0010 Pre-Availability Planning
NSWCCD/S
Y
SF
762 EOH01 025A01 CPFF CLIN 0010 Pre-Availability Planning SY/SF
TYCOM
762 EOH01 025A02 CPFF CLIN 0010 Pre-Availability Planning SY 762 EOH01 026H01 CPFF CLIN 0010 Pre-Availability Planning SY 762 EOH01 032A01 CPFF CLIN 0010 Ship Handling and Worksite Preparations SY/SF 762 EOH01 043I01 CPFF CLIN 0010 Ship Support SY 762 EOH01 066A01 CPFF CLIN 0010 Inspection and Quality Control SY 762 EOH01 071A01 CPFF CLIN 0010 Shipboard Test Program SY 762 EOH01 076A01 CPFF CLIN 0010 Shipboard Test Program SY 762 EOH01 087A01 CPFF CLIN 0010 Trials and Certification SY 762 EOH01 111A01 CPFF CLIN 0010 Superstructure and Fairwater SY 762 EOH01 131A01 CPFF CLIN 0010 Pressure Hull SY 762 EOH01 132A01 CPFF CLIN 0010 Non-Pressure Hull SY 762 EOH01 156I01 CPFF CLIN 0010 Ballast SY 762 EOH01 170A01 CPFF CLIN 0010 Watertight Hatches (Pressure Hull), Trunks and Enclosures
SY
762 EOH01 176A01 CPFF CLIN 0010 Tanks, Built-in SY 762 EOH01 177A01 CPFF CLIN 0010 Internal Structural Bulkheads SY 762 EOH01 178A01 CPFF CLIN 0010 Platforms, Walking Flats and Non-
Structural Bulkheads
SY
762 EOH01 178C10 CPFF CLIN 0010 Platforms, Walking Flats and Non- Structural Bulkheads
SY
762 EOH01 178C11 CPFF CLIN 0010 Platforms, Walking Flats and Non- Structural Bulkheads
SY
762 EOH01 201A01 CPFF CLIN 0010 Main Propulsion Complex SY 762 EOH01 201A02 CPFF CLIN 0010 Reduction Gear SY 762 EOH01 201A04 CPFF CLIN 0010 Emergency Propulsion Motor SY 762 EOH01 201A05 CPFF CLIN 0010 Main Shaft Thrust Bearing and
Vibration Reducer
SY
762 EOH01 201A06 CPFF CLIN 0010 Main Condensers SY 762 EOH01 201C36 CPFF CLIN 0010 Reduction Gear SY 762 EOH01 203A01 CPFF CLIN 0010 Shafting, Bearings and Propellers SY 762 EOH01 203C17 CPFF CLIN 0010 Shafting, Bearings and Propellers SY 762 EOH01 204A01 CPFF CLIN 0010 Snorkel SY 762 EOH01 206A01 CPFF CLIN 0010 Propulsion Control Equipment (Non-
Nuclear)
SY
762 EOH01 207A01 CPFF CLIN 0010 Main Steam (Non-Nuclear) SY 762 EOH01 209A01 CPFF CLIN 0010 Main Sea Water SY 762 EOH01 211A01 CPFF CLIN 0010 Propulsion Lube Oil SY 762 EOH01 231C07 CPFF CLIN 0010 High Pressure Steam Drain (Non- SY
Nuclear) 762 EOH01 236A01 CPFF CLIN 0010 SSTG Lube Oil SY 762 EOH01 236C10 CPFF CLIN 0010 SSTG Lube Oil SY 762 EOH01 237A01 CPFF CLIN 0010 Lube Oil Transfer and Purification SY 762 EOH01 246A01 CPFF CLIN 0010 Secondary Propulsion SY
762 EOH01 300A01 CPFF CLIN 0010 Electric Power Generation (Ship Service Turbine Generators) SY
762 EOH01 300A02 CPFF CLIN 0010 Electric Power Generation (Diesel Generator Set)
SF/SY
TYCOM
762 EOH01 302A01 CPFF CLIN 0010 Power Distribution and Electric Plant Control
SY
762 EOH01 303A01 CPFF CLIN 0010 Lighting Distribution and Fixtures SY 762 EOH01 307A01 CPFF CLIN 0010 Ship's Service Motor Generator Sets SY 762 EOH01 308A01 CPFF CLIN 0010 AC Power Distribution Switchboards SY 762 EOH01 309A01 CPFF CLIN 0010 DC Power Distribution Switchboards SY 762 EOH01 310A01 CPFF CLIN 0010 Group Control Switchboards SY 762 EOH01 404A01 CPFF CLIN 0010 Electronic Warfare Support Measures
(ESM)
SY
762 EOH01 406A01 CPFF CLIN 0010 Acoustic Countermeasure SY 762 EOH01 408A01 CPFF CLIN 0010 Radar; General SY 762 EOH01 415A01 CPFF CLIN 0010 Navigation; Periscopes SY 762 EOH01 425A01 CPFF CLIN 0010 Sonar; Passive SY 762 EOH01 429A01 CPFF CLIN 0010 Sonar; Utility SY 762 EOH01 430A01 CPFF CLIN 0010 Sonar; Hydrophones and Transducers SY 762 EOH01 435A01 CPFF CLIN 0010 Interior Communications; Order, Safety and Warning
SY
762 EOH01 437A01 CPFF CLIN 0010 Interior Communications; Metering and Indicating
SY
762 EOH01 437C28 CPFF CLIN 0010 Interior Communications; Metering and Indicating
SY
762 EOH01 440A01 CPFF CLIN 0010 Radio; Medium Frequency and High Frequency (MF/HF)
SY
762 EOH01 442A01 CPFF CLIN 0010 Radio; Ultra High Frequency (UHF) SY 762 EOH01 501A01 CPFF CLIN 0010 Ventilation SY 762 EOH01 502A01 CPFF CLIN 0010 Air Conditioning SY 762 EOH01 503A01 CPFF CLIN 0010 Refrigeration SY 762 EOH01 503C08 CPFF CLIN 0010 Refrigeration SY 762 EOH01 505A01 CPFF CLIN 0010 Plumbing SY 762 EOH01 508A01 CPFF CLIN 0010 Trim SY 762 EOH01 513A01 CPFF CLIN 0010 High Pressure Air SY 762 EOH01 515A01 CPFF CLIN 0010 Buoyancy Control SY 762 EOH01 518A01 CPFF CLIN 0010 Steering and Diving (Hydraulics) SY
762 EOH01 518A02 CPFF CLIN 0010 Steering and Diving (Structural, Mechanical and Electrical Control) SY
762 EOH01 520A01 CPFF CLIN 0010 Mooring, Towing and Anchor Handling SY 762 EOH01 529A01 CPFF CLIN 0010 Low Pressure Blow SF/SY 762 EOH01 530A01 CPFF CLIN 0010 Service Air SY 762 EOH01 533A01 CPFF CLIN 0010 Oxygen (Main Oxygen and Oxygen
Generator)
SY
762 EOH01 533C25 CPFF CLIN 0010 Oxygen (Main Oxygen and Oxygen Generator)
SY
762 EOH01 534A01 CPFF CLIN 0010 Rescue, Salvage and Survival SY 762 EOH01 538A01 CPFF CLIN 0010 Depth Gages SY
762 EOH01 539A01 CPFF CLIN 0010 Outboard Greasing SY 762 EOH01 540A01 CPFF CLIN 0010 Emergency Ballast Tank Blow SY 762 EOH01 542A01 CPFF CLIN 0010 Chill Water SY 762 EOH01 552A01 CPFF CLIN 0010 Ship's Service Hydraulic SY 762 EOH01 553A01 CPFF CLIN 0010 External Hydraulic SY 762 EOH01 558A01 CPFF CLIN 0010 Auxiliary Fresh Water Cooling SY 762 EOH01 561A01 CPFF CLIN 0010 Auxiliary Sea Water SY 762 EOH01 562A01 CPFF CLIN 0010 Drain SY 762 EOH01 562C12 CPFF CLIN 0010 Drain SY 762 EOH01 564A01 CPFF CLIN 0010 Hovering and Depth Control SY 762 EOH01 567A01 CPFF CLIN 0010 Diesel Supporting SY 762 EOH01 568A01 CPFF CLIN 0010 Trash Disposal SY 762 EOH01 605A01 CPFF CLIN 0010 Painting, Interior and Bilges SY 762 EOH01 606A01 CPFF CLIN 0010 Coverings SY 762 EOH01 607A01 CPFF CLIN 0010 Insulation (Hull, Bulkhead, Deck) SY 762 EOH01 608A01 CPFF CLIN 0010 Storerooms, Stowage and Lockers SY/SF 762 EOH01 708A01 CPFF CLIN 0010 Torpedo Tubes SY 762 EOH01 708F02 CPFF CLIN 0010 Torpedo Tubes/Torpedoes SY 762 EOH01 708F03 CPFF CLIN 0010 Torpedo Tubes/torpedoes SY 762 EOH01 714A01 CPFF CLIN 0010 3 Inch Launcher SY 762 EOH01 715A01 CPFF CLIN 0010 Vertical Launch SY 762 EOH01 717A01 CPFF CLIN 0010 Torpedo Ejection SY 762 EOH01 903I01 CPFF CLIN 0010 General Requirements SY 762 EOH01 014B01 CPFF CLIN 0010 Reactor Plant - General SY/FA 762 EOH01 028B01 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 040B01 CPFF CLIN 0010 Temporary Utilities and Services SY 762 EOH01 040B02 CPFF CLIN 0010 Temporary Utilities and Services SY 762 EOH01 087B02 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 131B01 CPFF CLIN 0010 Hull Decontamination SY 762 EOH01 177B01 CPFF CLIN 0010 Reactor Compartment SY 762 EOH01 823B01 CPFF CLIN 0010 Nuclear Steam Generator SY 762 EOH01 826B01 CPFF CLIN 0010 Reactor Coolant SY 762 EOH01 826D08 CPFF CLIN 0010 Decay Heat Removal SY 762 EOH01 827B01 CPFF CLIN 0010 Coolant Charging SY 762 EOH01 827B02 CPFF CLIN 0010 Valve Operating SY 762 EOH01 828B01 CPFF CLIN 0010 Coolant Pressurizing SY 762 EOH01 830B01 CPFF CLIN 0010 Coolant Discharge SY 762 EOH01 832B01 CPFF CLIN 0010 Coolant Sampling SY 762 EOH01 835B01 CPFF CLIN 0010 Reactor Air SY 762 EOH01 836B01 CPFF CLIN 0010 Reactor Plant Fresh Water Cooling SY 762 EOH01 839B01 CPFF CLIN 0010 Main Steam (Nuclear) SY 762 EOH01 840B01 CPFF CLIN 0010 Steam Generating SY 762 EOH01 841B01 CPFF CLIN 0010 Condensate and Feed (Nuclear) SY 762 EOH01 843B01 CPFF CLIN 0010 Reactor Rod Control SY 762 EOH01 844B01 CPFF CLIN 0010 Nuclear Instrumentation SY 762 EOH01 847B01 CPFF CLIN 0010 Primary Plant Control SY 762 EOH01 848B01 CPFF CLIN 0010 Steam Generator Water Level Control SY 762 EOH01 848E12 CPFF CLIN 0010 Steam Generator Water Level Control SY 762 EOH01 849B01 CPFF CLIN 0010 Primary Nuclear Instrumentation SY 762 EOH01 853B01 CPFF CLIN 0010 Radiation Monitoring and Surveys SY 762 EOH01 860L01 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 860L02 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 860L03 CPFF CLIN 0010 Reactor Plant - General SY
762 EOH01 860L04 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 860L05 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 860L07 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 860L09 CPFF CLIN 0010 Reactor Plant - General SY/FA 762 EOH01 861L01 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 861L02 CPFF CLIN 0010 Reactor Plant - General SY 762 EOH01 861L03 CPFF CLIN 0010 Reactor Plant - General SY
h. Item 0011 description is hereby revised to state the following:
Item 0011 –
The contractor shall accomplish the total effort for planning and execution of Nuclear & Non-Nuclear Program Alterations (Ship Alterations & Ordnance Alterations), including labor, non-labor and services on USS COLUMBUS (SSN 762) during its scheduled FY17 Engineered Overhaul (EOH) in accordance with the Statement of Work (SOW) described in Section C. The following SWLINs authorize alterations for Shipyard accomplishment:
Non-Nuclear:
762 EOH01 708F02 CPFF CLIN 0011 Torpedo Tubes/Torpedoes SY 762 EOH01 708F03 CPFF CLIN 0011 Torpedo Tubes/Torpedoes SY
Nuclear:
762 EOH01 848E12 CPFF CLIN 0011 Steam Generator Water Level Control SY 762 EOH01 853E11 CPFF CLIN 0011 Radiation Monitoring SY
Furthermore, the contractor will be required to provide services in support of the Ship Alterations being accomplished by the Alteration Installation Teams (AITs) and Customer Contracted Teams (CCTs). The service requirements will be specified by an AIT/CCT provided service request, Lead Maintenance Activity (LMA) statement of work or a division of responsibilities document for each alteration or group of alterations and processed as a point change to this work item. Services contemplated under this work item include: crane services, material handling, packaging and shipping, rigging, compressed air, storage/lay down areas, office space, tank work, welding services, sandblasting/painting services, insulation/lagging services, staging, temporary electrical services, ventilation/temporary air conditioning, special tools, sheet metal services and hazardous waste disposal.
This contract line item (CLIN) provides a Not-to-Exceed (NTE) number of man days, within the fully burdened man day rate, required to accomplish Nuclear and Non-Nuclear Program alterations and support the AIT/CCT efforts for this availability. The authorized man days will be negotiated, as necessary, drawing from the man days established for this CLIN. During the availability any additional shipyard alterations or support service requirements identified by the AIT/CCT will be authorized by a separate point change to the work item and, when authorized, will be deducted from the established NTE man days. The man days within this CLIN shall be accomplished within the established period of performance for the availability. AIT/CCT support service requirements in excess of this CLIN will be authorized as separate contractual action.
The total effort authorized is 6,750 MDs for alterations, non-labor and services. Requirements in excess of 6,750 MDs will be authorized as a separate contractual action
i. The below paragraph that references liquidated damages clause is hereby deleted in its entirety (changes are marked in red and strikethrough).
LIQUIDATED DAMAGES
As re-delivery of the individual submarines in a complete and mission ready condition on the contracted delivery date is of paramount to Commander, Submarine Force Atlantic, the provisions of FAR 52.211-11 are to be invoked as follows:
LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, or any extension, the Contractor shall, in place of actual damages, pay to the Government as fixed, agreed, and liquidated damages, for each calendar day of delay the sum of $35,616 per day.
(b) Alternatively, if delivery or performance…