Bidder's Question 112 Response

View the file

Other files for this federal contract opportunity

Other files attached to USS COLUMBUS (SSN 762) Engineering Overhaul (EOH), newest first.
File Type Posted
amendment_20.doc DOC document
amendment_0019_USS_COLUMBUS_revised.pdf PDF
CJA_41069.20_SSN_765_and_762_Redacted.pdf PDF
amendment_18.pdf PDF
Amendment_18_Attachment_3.pdf PDF
SEA07B_Approved_Clarifying_6_4_15_Attachment_2.pdf PDF
Amendment_16.doc DOC document
amendment_0014.pdf PDF
Final_amendment_13.pdf PDF
HII-NNS_762_BQ_12_answer.pdf PDF
EBC_BQ_125_revised_clarification_5FEB2015.pdf PDF
HII-NNS_RFP_Bidders'_Question__5_020515.docx DOCX document
Final_amendment_12.doc DOC document
HII_BQ_149_01_02_03_14_18_24_28_44_55_answers.pdf PDF
Final_amendment.doc DOC document
EBC_pending_answers_4_11_78_79_116_134_135.pdf PDF
EBC_INDUSTRY_DAY_BIDDERS_QUESTIONS.pdf PDF
Final_HII-NNS_Final_Questions.pdf PDF
N00024-15-R-4300-0010.doc DOC document
EB_questions_27 _51 _52 _54 _57 _59 _67 _83 _82 _121 _126 _130 _131 _132 _133 _136 _137 _138 _139 _140 _and_141.pdf PDF
N00024-15-R-4300-0008.doc DOC document
20150123_HII-NNS_answers.pdf PDF
amendment_0007_approved.doc DOC document
EBBQ_15-16-22-23-28-31-32-40-81.pdf PDF
amendment_0006_posting.pdf PDF
amendment_05_post_01222015.pdf PDF
2015Jan14-EBC_BQ_answers_1_14_26_41_47_49_53_56_58_64_post_01222015.pdf PDF
20150115-USS_MONTPELIER_IDD_Q7 8_revision.pdf PDF
EB__74_-__Corp_cost_est__765_IDD.xlsx XLSX spreadsheet
HII-NNS_RFP_Bidders'_Question__41_011515_response_011615.pdf PDF
HII-NNS_RFP_Bidders'_Question__18_011515_Response_011615.pdf PDF
HII-NNS_RFP_Bidders'_Question__16_011515_Response_011615.pdf PDF
EBC_BQ_125_shift_to_CLIN_5-11_response_011615.docx DOCX document
EBC_BQ_113__Final_011615.pdf PDF
Final_amendment_0004_FBO.pdf PDF
USS_Montpelier_Bidders'_Questions_147_ _148.pdf PDF
N00024-15-R-4300_DD254_(correction)_7_Jan_15.pdf PDF
HII_AmendedResponses.pdf PDF
2015Jan12-EBC_BQ_answers.pdf PDF
amendment_0003.doc DOC document
amendment_0002.doc DOC document
EBC_BQ_Answer_Q33.pdf PDF
USS_Montpelier_IDD_RfC_answers_134.pdf PDF
EBC_BQ_Answer_Q2.pdf PDF
REQUEST_FOR_CLARIFICATION_2.doc DOC document
SSN_762_CDRLS_12.11.14.ppt PPT presentation
Solicitation_N00024-15-R-4300.doc DOC document
SSN_762_CDRLS_12.11.14.ppt PPT presentation
SSN_765_CDRLS_12_4_14.ppt PPT presentation
N0002415R4300_Section_B_through_K_Draft_Post_121614.doc DOC document
Show all 50

USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DYNAMICS

Electric Boat

REQUEST FOR CLARIFICATION

Name of Offeror: Electric Boat Corporation Date: January 7, 2015

NAVSEA Contract No.: N00024-15-R-4300 Question No.: 112 REV

Ship(s): SSN 765 IDD and 762 EOH

Solicitation Related: Yes

Section Letter: Schedule B, Note D, Note I Page No.: 11, 16

AWP Related Yes

SWLIN No.: VARIOUS Title: RFP

Section/Paragraph No.:

Question:

The RFP for both SSN765 IDD and SSN762 EOH state the following regarding supplemental and emergent work:

“It is understood that all emergent work and material (i.e. including growth from execution of emergent repair actions to successfully restore each system and component to full readiness) related to CLIN 0004 (and CLIN 0010 for SSN 762), as defined in Section C, is authorized as basic work, and is to be performed by the contractor under the provisions of the Cost Plus Fixed Fee, Level-of- Effort (LOE) ceiling amount” {68,000 man-days (MDs) for CLIN 0004, and 92,700 man-days (MDs) for CLIN 0010 respectively}.

Is the intent of the above statement to mean that “all emergent work and material” includes, but is not limited to, troubleshooting efforts to determine corrective actions required, development of technical work documents (TWDs), material procurement and receipt inspection efforts, repair efforts, testing, inspection, etc.?

DO NOT WRITE BELOW THIS LINE ---- (SPACE BELOW FOR GOV'T USE ONLY)

The intention and expectation of the government is the contractor shall complete all efforts required to prepare, develop technical work documentation, procure long lead material, open, inspect, evaluate, troubleshoot, procure mandatory repair material, repair both mandatory and contingent items, procure contingent material, modify technical work documentation, restore, test, correct test failures, retest, and certify each AWP work item, such that the submarine is fully functional, operational and certified upon the completion of the availability. It is recognized the full scope to execute each work item requires coordination between multiple SWLINs (i.e. trade labor, engineering, logistics, certification, etc.) and these SWLINs are separated between of both

GENERAL DYNAMICS

Electric Boat

CLIN 0003/0009 fixed priced efforts and CLIN 0004/0010 level of effort (LOE) cost plus efforts.

It is recognized that execution and completion of work items requires actions that involve multiple SWLINs in both the fix and cost CLINs (i.e. program management in CLIN 0003, machine shop trade labor in CLIN 0004).

Should a work item require repairs outside or beyond the scope of the referenced standard maintenance documentation, and exceed the MDs available in the CLIN(s) in which the work is being accomplished, the contractor shall provide a proposal for any additional costs against the same SWLINs being charged for the base work as required to complete the growth work effort and request authorization from the government prior to proceeding with completion of the work item. Additionally, the contractor is expected to maintain all costs by SWLIN and the associated CLIN(s) throughout the execution of the contract.

Should completion of any work item result in exceeding the authorized LOE of any LOE CLIN (i.e. 0004/0010; 0005/0011; 0006/0012) the contractor shall provide a proposal for any and all expected and estimated additional costs against the same SWLINs being charged for the base work as required to complete all work effort and request authorization from the government prior to proceeding with completion of the remaining work items. This proposal shall be provided at least 30 days prior to fully expending the LOE. Additionally, the contractor is expected to maintain all costs by SWLIN and associated CLIN throughout the execution of the contract.

In the event a specific work item requires growth work authorization outside or beyond the referenced standard maintenance documentation, or the original baseline LOE is exceeded, the contractor shall review the Integrated Master Schedule, identify any change to the incentive key event dates, and request a change in the incentive dates to the PCO via the ACO.

All proposals for growth work required beyond that authorized in the base contract should state the increase required for the touch labor, associated services and any additional duration (if applicable) and the CLIN(s) in which the work will be accomplished.

It is assumed most proposals will require an increase in both the FFP CLIN and the associated Cost CLIN to include both touch labor efforts and associated services. Work should be charged the same (CLIN(s) and SWLIN(s)) for the additional growth work as the work is being charged for the base work.