Final_amendment_13.pdf
PDF 193 KB Posted
- Attached to
- USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) Federal contract opportunity
- Solicitation number
- N0002415R4300
About this file
amendment 13.
View the file
Other files for this federal contract opportunity
Show all 50
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002415NR92204
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See attached pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 42
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Feb-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-15-R-4300
X 9B. DATED (SEE ITEM 11)
19-Dec-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Feb-2015
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
SEA 02433 1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-15-R-4300
The purpose of this amendment is to make transfer SWLIN 087A01 that presentedly appears under CLIN 0003 to CLIN 0004. Based on the above, solicitation N00019-15-R-4300 is hereby changed to as follows:
1. Under section C, descriptions of supplies and services,
a. The SWLIN charts for CLINs 0003, and 0004 is hereby revised:
i. For CLIN 0003, the final SWLIN chart is provided below (changes marked in red and strikethrough):
HULL AVAIL SWLIN TYPE CONTRACT SWLIN SYSTEM ASSIGNMENT
765 IDD01 013K03 FFP CLIN 0003 Engineering and Design Services SY
IDD01
033A01
FFP
CLIN 0003
Ship Handling and Worksite Preparations
SY
034A01
035A01
036I01
765 IDD01 037A01 FFP CLIN 0003 Ship Handling and Worksite Preparations
SY
765 IDD01 040B02 FFP CLIN 0003 Temporary Utilities and Services SY 765 IDD01 041A01 FFP CLIN 0003 Ship Support SY 765 IDD01 042A01 FFP CLIN 0003 Ship Support SY 765 IDD01 044A01 FFP CLIN 0003 Ship Support SY 765 IDD01 045A01 FFP CLIN 0003 Ship Support SY 765 IDD01 051U01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 052I01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 054A01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 055I01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 073A01 FFP CLIN 0003 Shipboard Test Program SY 765 IDD01 082A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 083A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 087A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 091I01 FFP CLIN 0003 Special Services SY/SF 765 IDD01 248A01 FFP CLIN 0003 Main Storage Battery and Support SY/SF
609A01
CLIN 0003 Equipment (Utility Spaces, Workshops, Laboratories, Test Areas)
765 IDD01 709A01 FFP CLIN 0003 Weapons Handling and Stowage SY 765 IDD01 901I01 FFP CLIN 0003 General Requirements SY 765 IDD01 903I01 FFP CLIN 0003 General Requirements SY 765 IDD01 904I02 FFP CLIN 0003 General Requirements SY 765 IDD01 905A01 FFP CLIN 0003 Inspection and Certification SY/SF/SA 765 IDD01 080B01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 080B02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 080B03 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 083B01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 608D24 FFP CLIN 0003 Storerooms, Stowage and Lockers SY 765 IDD01 612D24 FFP CLIN 0003 Furnishings SY 765 IDD01 831B02 FFP CLIN 0003 Coolant Purification SY 765 IDD01 831D33 FFP CLIN 0003 Coolant Purification SY 765 IDD01 840D27 FFP CLIN 0003 Steam Generating SY
765 IDD01 844D20 FFP CLIN 0003 Nuclear Instrumentation SY 765 IDD01 847D42 FFP CLIN 0003 Primary Plant Control SY 765 IDD01 848D11 FFP CLIN 0003 Steam Generator Water Level Control SY 765 IDD01 860L01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L06 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L09 FFP CLIN 0003 Reactor Plant - General SY/FA 765 IDD01 861L01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L03 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L04 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L06 FFP CLIN 0003 Reactor Plant - General SY
ii. For CLIN 0004: The final SWLIN chart is provided below (changes marked in red and bold):
022A01
CPFF
CLIN 0004
Pre-Availability Planning
NSWCCD/SY
SF
025A01
Pre-Availability Planning SY/SF
TYCOM
765 IDD01 025A02 CPFF CLIN 0004 Pre-Availability Planning SY
032A01
SY/SF
765 IDD01 043I01 CPFF CLIN 0004 Ship Support SY 765 IDD01 066A01 CPFF CLIN 0004 Inspection and Quality Control SY 765 IDD01 071A01 CPFF CLIN 0004 Shipboard Test Program SY 765 IDD01 076A01 CPFF CLIN 0004 Shipboard Test Program SY 765 IDD01 076A02 CPFF CLIN 0004 Shipboard Test Program SY 765 IDD01 111A01 CPFF CLIN 0004 Superstructure and Fairwater SY 765 IDD01 131A01 CPFF CLIN 0004 Pressure Hull SY 765 IDD01 132A01 CPFF CLIN 0004 Non-Pressure Hull SY 765 IDD01 156I01 CPFF CLIN 0004 Ballast SY
170A01
CLIN 0004 Watertight Hatches (Pressure Hull), Trunks and Enclosures
765 IDD01 176A01 CPFF CLIN 0004 Tanks, Built-in SY 765 IDD01 177A01 CPFF CLIN 0004 Internal Structural Bulkheads SY
178A01
CLIN 0004 Platforms, Walking Flats and Non-
Structural Bulkheads
178C10
178C11
201A05
Main Shaft Thrust Bearing and Vibration Reducer
765 IDD01 201A06 CPFF CLIN 0004 Main Condensers SY 765 IDD01 203A01 CPFF CLIN 0004 Shafting, Bearings and Propellers SY 765 IDD01 204A01 CPFF CLIN 0004 Snorkel SY 765 IDD01 209A01 CPFF CLIN 0004 Main Sea Water SY 765 IDD01 211A01 CPFF CLIN 0004 Propulsion Lube Oil SY 765 IDD01 236A01 CPFF CLIN 0004 SSTG Lube Oil SY 765 IDD01 237A01 CPFF CLIN 0004 Lube Oil Transfer and Purification SY 765 IDD01 246A01 CPFF CLIN 0004 Secondary Propulsion SY
300A02
CLIN 0004 Electric Power Generation (Diesel
Generator Set)
SF/SY
TYCOM
765 IDD01 307A01 CPFF CLIN 0004 Ship's Service Motor Generator Sets SY 765 IDD01 308A01 CPFF CLIN 0004 AC Power Distribution Switchboards SY 765 IDD01 309A01 CPFF CLIN 0004 DC Power Distribution Switchboards SY
404A01
Electronic Warfare Support Measures
(ESM)
765 IDD01 406A01 CPFF CLIN 0004 Acoustic Countermeasure SY 765 IDD01 408A01 CPFF CLIN 0004 Radar; General SY 765 IDD01 425A01 CPFF CLIN 0004 Sonar; Passive SY 765 IDD01 426A01 CPFF CLIN 0004 Sonar; Active SY 765 IDD01 429A01 CPFF CLIN 0004 Sonar; Utility SY 765 IDD01 430A01 CPFF CLIN 0004 Sonar; Hydrophones and Transducers SY
435A01
Interior Communications; Order, Safety and Warning
437A01
Interior Communications; Metering and Indicating
437C28
Interior Communications; Metering and Indicating
440A01
CLIN 0004 Radio; Medium Frequency and High
Frequency (MF/HF)
765 IDD01 442A01 CPFF CLIN 0004 Radio; Ultra High Frequency (UHF) SY 765 IDD01 501A01 CPFF CLIN 0004 Ventilation SY 765 IDD01 502A01 CPFF CLIN 0004 Air Conditioning SY 765 IDD01 503A01 CPFF CLIN 0004 Refrigeration SY 765 IDD01 505A01 CPFF CLIN 0004 Plumbing SY 765 IDD01 505C06 CPFF CLIN 0004 Plumbing SY 765 IDD01 508A01 CPFF CLIN 0004 Trim SY 765 IDD01 509A01 CPFF CLIN 0004 Potable Water SY 765 IDD01 513A01 CPFF CLIN 0004 High Pressure Air SY 765 IDD01 513C24 CPFF CLIN 0004 High Pressure Air SY 765 IDD01 515A01 CPFF CLIN 0004 Buoyancy Control SY 765 IDD01 518A01 CPFF CLIN 0004 Steering and Diving (Hydraulics) SY
518A02
CLIN 0004 Steering and Diving (Structural, Mechanical and Electrical Control)
520A01
Mooring, Towing and Anchor Handling
765 IDD01 529A01 CPFF CLIN 0004 Low Pressure Blow SF/SY 765 IDD01 530A01 CPFF CLIN 0004 Service Air SY
533A01
Oxygen (Main Oxygen and Oxygen Generator)
765 IDD01 534A01 CPFF CLIN 0004 Rescue, Salvage and Survival SY 765 IDD01 539A01 CPFF CLIN 0004 Outboard Greasing SY 765 IDD01 540A01 CPFF CLIN 0004 Emergency Ballast Tank Blow SY 765 IDD01 552A01 CPFF CLIN 0004 Ship's Service Hydraulic SY 765 IDD01 553A01 CPFF CLIN 0004 External Hydraulic SY/SF 765 IDD01 558A01 CPFF CLIN 0004 Auxiliary Fresh Water Cooling SY 765 IDD01 561A01 CPFF CLIN 0004 Auxiliary Sea Water SY 765 IDD01 562A01 CPFF CLIN 0004 Drain SY 765 IDD01 562C12 CPFF CLIN 0004 Drain SY 765 IDD01 564A01 CPFF CLIN 0004 Hovering and Depth Control SY 765 IDD01 567A01 CPFF CLIN 0004 Diesel Supporting SY 765 IDD01 568A01 CPFF CLIN 0004 Trash Disposal SY
765 IDD01 605A01 CPFF CLIN 0004 Painting, Interior and Bilges SY 765 IDD01 607A01 CPFF CLIN 0004 Insulation (Hull, Bulkhead, Deck) SY 765 IDD01 608A01 CPFF CLIN 0004 Storerooms, Stowage and Lockers SY/SF 765 IDD01 708A01 CPFF CLIN 0004 Torpedo Tubes SY 765 IDD01 714A01 CPFF CLIN 0004 3 Inch Launcher SY 765 IDD01 715A01 CPFF CLIN 0004 Vertical Launch SY 765 IDD01 717A01 CPFF CLIN 0004 Torpedo Ejection SY 765 IDD01 014B01 CPFF CLIN 0004 Reactor Plant – General SY/FA 765 IDD01 028B01 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 040B01 CPFF CLIN 0004 Temporary Utilities and Services SY 765 IDD01 087B02 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 131B01 CPFF CLIN 0004 Hull Decontamination SY 765 IDD01 177B01 CPFF CLIN 0004 Reactor Compartment SY 765 IDD01 823B01 CPFF CLIN 0004 Nuclear Steam Generator SY 765 IDD01 826B01 CPFF CLIN 0004 Reactor Coolant SY 765 IDD01 827B01 CPFF CLIN 0004 Coolant Charging SY 765 IDD01 827B02 CPFF CLIN 0004 Valve Operating SY 765 IDD01 828B01 CPFF CLIN 0004 Coolant Pressurizing SY 765 IDD01 830B01 CPFF CLIN 0004 Coolant Discharge SY 765 IDD01 832B01 CPFF CLIN 0004 Coolant Sampling SY 765 IDD01 835B01 CPFF CLIN 0004 Reactor Air SY 765 IDD01 836B01 CPFF CLIN 0004 Reactor Plant Fresh Water Cooling SY 765 IDD01 837B01 CPFF CLIN 0004 Primary Shield Water FA/SY 765 IDD01 839B01 CPFF CLIN 0004 Main Steam (Nuclear) SY 765 IDD01 840B01 CPFF CLIN 0004 Steam Generating SY 765 IDD01 841B01 CPFF CLIN 0004 Condensate and Feed (Nuclear) SY 765 IDD01 843B01 CPFF CLIN 0004 Reactor Rod Control SY 765 IDD01 847B01 CPFF CLIN 0004 Primary Plant Control SY 765 IDD01 848B01 CPFF CLIN 0004 Steam Generator Water Level Control SY 765 IDD01 848E12 CPFF CLIN 0004 Steam Generator Water Level Control SY 765 IDD01 849B01 CPFF CLIN 0004 Primary Nuclear Instrumentation SY 765 IDD01 853B01 CPFF CLIN 0004 Radiation Monitoring and Surveys SY 765 IDD01 854B01 CPFF CLIN 0004 Radiation Shielding (Primary) SY 765 IDD01 860L03 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 860L04 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 860L05 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 860L07 CPFF CLIN 0004 Reactor Plant - General SY 765 IDD01 087A01 CPFF CLIN 0004 Trials and Certification SY
2. In Section L, Instruction to offerors, the final SWLIN Charts for CLINs 0003 (Firm Fixed Price CLINs) is revised to as follows: (changes marked in strikethrough text and red)
765 IDD01 013K03 FFP CLIN 0003 Engineering and Design Services SY
033A01
034A01
035A01
036I01
765 IDD01 037A01 FFP CLIN 0003 Ship Handling and Worksite
SY
765 IDD01 040B02 FFP CLIN 0003 Temporary Utilities and Services SY 765 IDD01 041A01 FFP CLIN 0003 Ship Support SY 765 IDD01 042A01 FFP CLIN 0003 Ship Support SY 765 IDD01 044A01 FFP CLIN 0003 Ship Support SY 765 IDD01 045A01 FFP CLIN 0003 Ship Support SY 765 IDD01 051U01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 052I01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 054A01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 055I01 FFP CLIN 0003 Production Services and Support SY 765 IDD01 073A01 FFP CLIN 0003 Shipboard Test Program SY 765 IDD01 082A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 083A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 087A01 FFP CLIN 0003 Trials and Certification SY 765 IDD01 091I01 FFP CLIN 0003 Special Services SY/SF 765 IDD01 248A01 FFP CLIN 0003 Main Storage Battery and Support SY/SF
609A01
CLIN 0003 Equipment (Utility Spaces, Workshops, Laboratories, Test Areas)
765 IDD01 709A01 FFP CLIN 0003 Weapons Handling and Stowage SY 765 IDD01 901I01 FFP CLIN 0003 General Requirements SY 765 IDD01 903I01 FFP CLIN 0003 General Requirements SY 765 IDD01 904I02 FFP CLIN 0003 General Requirements SY 765 IDD01 905A01 FFP CLIN 0003 Inspection and Certification SY/SF/SA 765 IDD01 080B01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 080B02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 080B03 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 083B01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 608D24 FFP CLIN 0003 Storerooms, Stowage and Lockers SY 765 IDD01 612D24 FFP CLIN 0003 Furnishings SY 765 IDD01 831B02 FFP CLIN 0003 Coolant Purification SY 765 IDD01 831D33 FFP CLIN 0003 Coolant Purification SY 765 IDD01 840D27 FFP CLIN 0003 Steam Generating SY 765 IDD01 844D20 FFP CLIN 0003 Nuclear Instrumentation SY 765 IDD01 847D42 FFP CLIN 0003 Primary Plant Control SY 765 IDD01 848D11 FFP CLIN 0003 Steam Generator Water Level Control SY 765 IDD01 860L01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L06 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 860L09 FFP CLIN 0003 Reactor Plant - General SY/FA 765 IDD01 861L01 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L02 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L03 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L04 FFP CLIN 0003 Reactor Plant - General SY 765 IDD01 861L06 FFP CLIN 0003 Reactor Plant - General SY