APPENDIX_C_CSDR__DD2794_Attachment.xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- KC-135 Aero-I SATCOM Replacement Federal contract opportunity
- Solicitation number
- KC-135_Aero-I
About this file
This document contains a cost and software data reporting plan template (DD Form 2794) for the KC-135 Aero-I SATCOM replacement program. The template requires reporting at the work breakdown structure (WBS) element level for cost, schedule, and software development data. Reporting is required for integrated program management reports, contract funds status reports, software resources data reports, and earned value management. Data must be reported for program milestones like requirements reviews, design reviews, testing events. Final data delivery is required at contract completion.
A related federal contract opportunity notice seeks sources to replace the KC-135 aircraft's aging Aero-I SATCOM system with an Iridium solution. A market survey is being conducted to identify potential offerors that can qualify production and provide an Iridium system, transceiver, antenna, and associated components for 400 aircraft. An industry day will be held on May 8, 2018 to provide information and accept written questions. Capability statements are requested by April 30, 2018 to assess offeror's production, software, repair, and technical data capabilities. The program aims to begin fielding replacements in fiscal year 2020 through 2022.
CSDR DD2794
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1
COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | Aero-I SATCOM | |||||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||||
| Pre-A | B | X | C-FRP | AERO-I | Electronic System | X | INITIAL | ||||||||
| A | X | C-LRIP | O&S | CHANGE | |||||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | ||||||||||||
| Jacqueline Burns/Bldg 3001 Ste 2AG1/88G, Tinker AFB, OK, 73145 | 405-734-2736 | ||||||||||||||
| B | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||||||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | RDT&E | ||||||||||
| CONTRACT (SUB) | TBD | X | PROCUREMENT | ||||||||||||
| O&M |
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | |||||
| X | X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||||
| (PCR) | e. DD 1921-5 | ||||||||||||
| (SFCHR) | f. EAC | ||||||||||||
| 1.0 | 1.0 | Electronic System | X | X | X | X | X | X | |||||
| 1.1 | 1.1 | Prime Mission Product (PMP) | X | X | X | X | X | ||||||
| 1.1.1 | 1.1.1 | PMP Integration, Assembly, Test, and Checkout | X | X | X | X | X | X | |||||
| 1.1.1.1 | 1.1.1.1 | Integration and Assembly | X | X | X | X | X | ||||||
| 1.1.1.2 | 1.1.1.2 | Test and Checkout | X | X | X | X | X | ||||||
| 1.1.1.3 | 1.1.1.3 | Hardware 1 (A Kit) | X | X | X | ||||||||
| 1.1.1.3.1 | 1.1.1.3.1 | Wiring Harness | X | X | X | ||||||||
| 1.1.1.3.2 | 1.1.1.3.2 | Mounting Plate | X | X | X | ||||||||
| 1.1.1.3.3 | 1.1.1.3.3 | Cabling and Associated Components | X | X | X | ||||||||
| 1.1.1.4 | 1.1.1.4 | Hardware 2 (B Kit) | X | X | X | X | X | ||||||
| 1.1.1.4.1 | 1.1.1.4.1 | Iridium Transciever | X | X | X | X | X | ||||||
| 1.1.1.4.2 | 1.1.1.4.2 | Iridium Antenna | X | X | X | X | X | ||||||
| 1.1.2 | 1.1.2 | PMP Software Release | X | X | X | X | X | ||||||
| 1.1.3.1 | 1.1.2.1 | Computer Software Configuration Item (CSCI) | X | X | X | X | |||||||
| 1.1.4 | 1.1.2.2 | PMP Software Integration, Assembly, Test, and Checkout | X | X | X | X | X | ||||||
| 1.2 | 1.2 | Integration, Assembly, Test, and Checkout | X | X | X | X | |||||||
| 1.2.1 | 1.2.1 | SIL Integration | X | X | X | X | X | ||||||
| 1.2.2 | 1.2.2 | Software Integration | X | X | X | X | |||||||
| 1.3 | 1.3 | Systems Engineering | X | X | X | X | X | ||||||
| 1.3.1 | 1.3.1 | Software Systems Engineering | X | X | X | X | X | X | |||||
| 1.3.2 | 1.3.2 | SEMP (annex) | X | X | X | X | |||||||
| 1.3.3 | 1.3.3 | Requirements management | X | X | X | X | |||||||
| 1.3.4 | 1.3.4 | Airworthiness manangement | X | X | X | X | |||||||
| 1.4 | 1.4 | Program Management | X | X | X | X | X | ||||||
| 1.4.1 | 1.4.1 | Software Program Management | X | X | X | X | X | X | |||||
| 1.4.3 | 1.4.2 | Cybersecurity Management | X | X | X | ||||||||
| 1.4.4 | 1.4.3 | Core Program Management | X | X | X | X | |||||||
| 1.4.4 | 1.4.4 | Other Program Management | X | X | X | X | |||||||
| 1.4.4.1 | 1.4.4.1 | LCSP/LCMP (annex) | X | X | X | X | |||||||
| 1.4.4.2 | 1.4.4.2 | Integrated Master Plan (IMP) | X | X | X | X | |||||||
| 1.4.4.3 | 1.4.4.3 | Integrated Master Schedule (IMS) | X | X | X | X | |||||||
| 1.4.4.4 | 1.4.4.4 | Risk Management Plan (Annex) | X | X | X | X | |||||||
| 1.4.4.5 | 1.4.4.5 | Product Support Elements | X | X | X | X | |||||||
| 1.4.4.5.1 | 1.4.4.5.1 | Group A Kit Number Allocation | |||||||||||
| 1.4.4.5.2 | 1.4.4.5.2 | Group A Kit Delivery Method | |||||||||||
| 1.4.4.5.3 | 1.4.4.5.3 | Group B Kit Number Allocation | |||||||||||
| 1.4.4.5.4 | 1.4.4.5.4 | Group B Kit Delivery Method | |||||||||||
| 1.4.4.6 | 1.4.4.6 | TEMP (Annex) | |||||||||||
| 1.4.5 | 1.4.5 | Cybersecurity Test and Evaluation | X | X | |||||||||
| 1.4.5.1 | 1.4.5.1 | Cybersecurity Development Test | X | X | |||||||||
| 1.4.5.2 | 1.4.5.2 | Cybersecurity Operational Test | X | X | |||||||||
| 1.4.6 | 1.4.6 | Mock-ups/System Integration Labs (SILs) | X | X | X | X | X | ||||||
| 1.4.7 | 1.4.7 | Test and Evaluation Support | X | X | X | X | X | ||||||
| 1.4.8 | 1.4.8 | Test Facilities | X | X | X | X | X | ||||||
| 1.4.8.1 | 1.4.8.1 | TBD | X | X | X | X | X | ||||||
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE |
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | |||||
| X | X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||
| (PCR) | e. DD 1921-5 | ||||||||||
| (SFCHR) | f. EAC | ||||||||||
| 1.5 | 1.5 | Training | |||||||||
| 1.5.1 | 1.5.1 | Training Materials | |||||||||
| 1.5.1.1 | 1.5.1.1 | CBT Trainer | |||||||||
| 1.5.1.2 | 1.5.1.2 | Training Manuals | |||||||||
| 1.5.2 | 1.5.2 | Maintenance Training | |||||||||
| 1.5.3 | 1.5.3 | Weapon System Trainer (SIM) Software | |||||||||
| 1.6 | 1.6 | Data | X | X | X | X | X | ||||
| 1.6.1.1 | 1.6.1 | Time Compliance Tech Order | X | X | X | X | X | ||||
| 1.6.2 | 1.6.2 | Technical Publications | X | X | X | X | X | ||||
| 1.6.2.1 | 1.6.2.1 | Maintenance Manuals/Tech Orders | X | X | X | X | X | ||||
| 1.6.2.2 | 1.6.2.2 | Aircrew Manuals | X | X | X | X | X | ||||
| 1.6.2.3 | 1.6.2.3 | Commodity Technical Orders | X | X | X | ||||||
| 1.6.3 | 1.6.3 | Engineering Data | X | X | X | X | |||||
| 1.6.3.1 | 1.6.3.1 | Drawings | X | X | X | X | |||||
| 1.6.3.2 | 1.6.3.2 | Source Data | X | X | X | X | |||||
| 1.6.3.3 | 1.6.3.3 | Airworthiness Data | X | X | X | X | |||||
| 1.6.4 | 1.6.4 | Management Data | X | X | X | X | |||||
| 1.6.4.1 | 1.6.4.1 | Integrated Program Management Report (IPMR) | X | X | X | X | |||||
| 1.6.4.2 | 1.6.4.2 | Contract Funds Status Report (CSR) | X | X | X | X | |||||
| 1.6.5 | 1.6.5 | Support Data | X | X | X | X | |||||
| 1.6.5.1 | 1.6.5.1 | Ram-C Data | X | X | X | X | |||||
| 1.6.5.2 | 1.6.5.2 | Provisioning Data | X | X | X | X | |||||
| 1.6.6 | 1.6.6 | Data Depository | X | X | X | X | |||||
| 1.6.6.1 | 1.6.6.1 | JEDMICS | X | X | X | X | |||||
| DD FORM 2794, AUGUST 2015 | PREVIOUS EDITION IS OBSOLETE |
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: | |||||
| X | X | X |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | |||||||
| (CDSR) | c. DD 1921-1 | ||||||
| (FCHR) | d. DD 1921-2 | ||||||
| (PCR) | e. DD 1921-5 | ||||||
| (SFCHR) | f. EAC | ||||||
| Subtotal Cost | X | X | X | ||||
| Reporting Contractor G&A | X | X | |||||
| Reporting Contractor Undistributed Budget | X | X | |||||
| Reporting Contractor Management Reserve | X | X | |||||
| Reporting Contractor FCCM | X | X | |||||
| Total Cost | X | X | X |
Reporting Contractor Profit/Loss or Fee X X
Total Price X X X
DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
DD Form 2794, Pg 2
| 14. CSDR SUBMISSION DATES | |||||||
| a. | |||||||
| SUBMISSION | b. | ||||||
| FORM(S) | c. | ||||||
| EVENT | d. | ||||||
| REPORT TYPE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | CWBS Dictionary | Contract Award (plus 12 months) | Initial | ||||
| 2 | 1921, 1921-1, 1921-2 | Contract Award (plus 12 months) | Initial | ||||
| 3 | SRDR Development | Contract Award (plus 12 months - Total Contract Estimate) | Initial | ||||
| 4 | SRDR Development | Start of each Software Release | Initial | ||||
| 5 | 1921, 1921-1 | Start of each Software Release (Coincident with SRDR Initial) | Initial | ||||
| 6 | 1921, 1921-1 | System Requirements Review (SRR) | Interim | ||||
| 7 | SRDR Development | System Requirements Review (SRR) | Interim | ||||
| 8 | 1921, 1921-1 | Preliminary Design Review (PDR) | Interim | ||||
| 9 | SRDR Development | Preliminary Design Review (PDR) | Interim | ||||
| 10 | 1921, 1921-1 | Critical Design Review (CDR) | Interim | ||||
| 11 | SRDR Development | Critical Design Review (CDR) | Interim | ||||
| 12 | 1921, 1921-1, 1921-2 | First Production Representative Unit Delivered | Interim | ||||
| 13 | 1921, 1921-1, 1921-2 | Annual Report 1...n | Interim | ||||
| 14 | SRDR Development | Annual Report 1...n | Interim | ||||
| 15 | 1921, 1921-1 | End of each Software Release (Coincident with SRDR Final) | Interim | ||||
| 16 | SRDR Development | End of each Software Release | Interim | ||||
| 17 | CWBS Dictionary | Contract Completion | Final | ||||
| 18 | 1921, 1921-1, 1921-2 | Contract Completion | Final | ||||
| 19 | SRDR Development | Contract Completion - Total Contract Actuals) | Final | ||||
| 20 | SRDR Development | Event 90 Days Prior to Production Decision | Interim | ||||
| 21 | 1921, 1921-1, 1921-2 | Event 90 Days Prior to Production Decision | Interim |
DD FORM 2794 (PAGE 2), AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
15. REMARKS
| CO-PLANNING |
| a. Integrated Program Management Report (IPMR) |
| 1. IPMR column 13.h reporting requirements shall be updated/annotated at the post-award conference. |
2. IPMR elements selected for reporting in column 13.h shall be updated to reflect the PMO’s programmatic risk and reporting visibility needs through contract award.
3. EVM reporting requirements shall be reflected in the contractual IPMR CDRL (DD FORM 1423-1).
4. For information on IPMR policy requirements, refer to DID DI-MGMT-81861A and the IPMR Implementation Guide.
| b. EAC Reporting |
| 1. EAC column 13.f reporting requirements shall be updated/annotated at the post-award conference. |
2. EAC column 13.f reporting
| c. As-of-Date |
| 1. When both an IPMR and CSDR are due in the same month, the data As-Of-Date shall be aligned to reflect the contractor’s accounting month end data. |
2. CSDR Due Date need not align with IPMR Due Date.
| FAC vs EAC | |||||
| All references refer to Forecast at Completion (FAC) unless stated otherwise. | Although the reporting entity may elect to report the Forecast at Completion (FAC) from its Electronic Industries Alliance (EIA) 748 Compliant Earned Value Management System (EVMS), there is no requirement that the FAC originate from the entity's Estimate At Completion (EAC) or any other derivative within EVMS. | ||||
| NON-RECURRING/RECURRING DEFINITIONS | |||||
| Recurring and Non-Recurring Costs required for all levels: | |||||
| Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management. | |||||
| Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out. | |||||
| Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities. | |||||
| Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management. | |||||
| Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery. | |||||
| Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests. | |||||
| Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed. | |||||
| Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts. | |||||
| Examples of System Test and Evaluation activities include development of test plans/procedures; subsystem and system level test and integration for developmental articles; test equipment in support of development including for static & fatigue testing, test stands, wind tunnel models, stress analysis, ballistics testing, flight, ground or sea testing of system, redesign from testing, retesting; System/Software Integration Laboratory (SIL) development; and analysis to support verification, validation & certification. Examples of Training activity include initial courseware development and simulator development. Examples of Initial Spares and Repair Parts activity include spare parts and material in support of the nonrecurring subsystem/system level articles. | |||||
| Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts. | |||||
| COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES | |||||
| Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable. | |||||
| 1921-3 CONTRACTOR BUSINESS DATA REPORT | |||||
| a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate | Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. | ||||
| b. Reports are submitted annually at the end of the contractor's fiscal year. | |||||
| c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA.If the document applies to more than three future years, attach additional future year sheets as required. | In the absence of these documents, estimates should be provided for three future years. | ||||
| ** (if required) 1921-2 PROGRESS CURVE REPORT | |||||
| a. Unit or Lot Reporting: Reporting to be provided by UNIT or LOT. | |||||
| b. Product Characteristics: 1921-2 must include the WEIGHT and POWER. | Note on 1921-2 remarks: CWIPT determines Unit or Lot reporting and product characteristics to be collected for Progress Curve report. | DCARC Analyst must update comments as applicable. | |||
| FINAL COST REPORT | |||||
| Submitted when final end item has been delivered and accepted by the government(e.g., as evidenced by a completed DD 250) and 95% or more of total contract costs have been incurred. | |||||
| SUSTAINMENT | |||||
| Contractor shall provide the following Quantity information in the Remarks section of the 1921 and 1921-5: number of systems supported by this contract, and number of repairs performed.The Contractor must state the nominal capacity planned for each Delivery Order (e.g., the # of repairs, # of overhauls, # of flight hours, etc.) identified in the plan. | This requirement is intended to capture what services are being bought with each effort. | ||||
| IRAD EFFORT | |||||
| The contractor should list the major relevant IRAD projects leveraged for this development effort, provide a brief description of the cost of the projects, and provide/attach any more detailed actual cost information at the level available. |
DD FORM 2794 (PAGE 2), AUGUST 2015 PREVIOUS EDITION IS OBSOLETE