DD2794 COST AND SOFTWARE DATA REPORTING PLAN.xls
DoD Form XLS spreadsheet 201 KB Posted
- Attached to
- KC-135 Center Console Refresh (CCR)
- Solicitation number
- FA810523RB004
About this file
This document is a Cost and Software Data Reporting (CSDR) plan for the KC-135 Center Console Refresh solicitation from the Air Force Materiel Command Lifecycle Management Center. Key details include:
-
The solicitation is for aircraft systems integration, assembly, test and checkout, airframe components, propulsion, vehicle subsystems including electrical and fuel, avionics, and program management.
-
The contractor must report costs for all contract line items, including over and above work, long lead materials, and foreign military sales. Costs should not be omitted based on contract structure and must be tagged to discrete delivery orders.
-
Technical data, quantity data, and cost reports are due initially by June 2024 and annually through final contract completion reports due by June 2033.
-
Technical parameters include new design percentages, volumes, weights, connection counts, material mixes, and computing specifications for hardware and software at different work breakdown structure levels.
View the file
Other versions and copies of DD Form 2794
Show all 20
Who attaches DD Form 2794
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1 (METADATA)
| COST AND SOFTWARE DATA REPORTING PLAN | OMB No. 0704-0188 |
| The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. |
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1a. PROGRAM NAME | ||
| KC-135 Center Console Refresh (CCR) | ||
| 1b. PHASE/MILESTONE (check all that apply) | ||
| Pre-A | ||
| A | ||
| X | B | |
| C-LRIP | ||
| C-FRP | ||
| O&S | ||
| 1c. PRIME MISSION PRODUCT | ||
| Aircraft | ||
| 1d. ACQUISITION CATEGORY (ACAT) | ||
| Pre-ACAT | ||
| ACAT I (MDAP) | ||
| ACAT IA (MAIS) | ||
| ACAT II | ||
| X | ACAT III | |
| Other | ||
| 2. COMMODITY TYPE | ||
| Aircraft System | ||
| 3. PLAN ITERATION TYPE | ||
| X | INITIAL | |
| REVISION | ||
| 4. CURRENT SUBMISSION DATE (YYYYMMDD) | ||
| 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||
| 6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.) | ||
| Shotnokoff, Erica D. | ||
| 6b. ADDRESS (Include ZIP Code) | ||
| 3001 Staff Drive STE 2AE1-88G, Tinker AFB, OK 73145 | ||
| 6c. TELEPHONE NUMBER (Include Area Code) | ||
| 256-285-0095 | ||
| 6d. E-MAIL ADDRESS | ||
| erica.shotnokoff.3@us.af.mil | ||
| 7. PLAN TYPE | ||
| GOVERNMENT | ||
| X | CONTRACT (PRIME) | |
| CONTRACT (SUB) | ||
| 8. PLAN GOVERNMENT PREPARING ORGANIZATION | ||
| AFLCMC/WLTMA | ||
| 9a. CONTRACTOR NAME/ADDRESS | ||
| i. REPORTING ORGANIZATION NAME | ||
| TBD | ||
| ii. DIVISION NAME | ||
| iii. LOCATION | ||
| iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT: | ||
| X | CBDR REQUIRED FOR THIS ORGANIZATION | |
| 9b. CONTRACT NUMBER (List all that apply, separated by commas) | ||
| TBD | ||
| 9c. APPROPRIATION (check all that apply) | ||
| X | RDT&E | |
| X | PROCUREMENT | |
| O&M | ||
| FMS | ||
| WCF | ||
| OTHER | ||
| 10a. APPROVED PLAN NUMBER | ||
| AF-23-C1 | ||
| 10b. APPROVED PLAN REVISION NUMBER | ||
| 10c. APPROVED PLAN REQUIREMENTS | ||
| X | AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) | |
| X | AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only) | |
| X | TECHNICAL DATA REQUIRED | |
| 10d. COST REPORT TYPE | ||
| X | FLEXFILE | |
| LEGACY DD 1921 SERIES | ||
| DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
erica.shotnokoff.3@us.af.mil
DD Form 2794, Pg 2 (REPORTING)
| COST AND SOFTWARE DATA REPORTING PLAN | COST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN | |||||
| 11. WORK BREAKDOWN STRUCTURE (WBS) | 12. COST | 13. TECHNICAL DATA | ||||
| a. WBS | ||||||
| CODE | b. WBS | |||||
| LEVEL | c. WBS ELEMENT NAME | a. ACTUALS TO | ||||
| DATE (ATD) | b. LEGACY | |||||
| 1921-1 | c. LEGACY | |||||
| 1921-2 | d. LEGACY | |||||
| 1921-5 | e. EAC/FAC | |||||
| (See item 10d) | a. QUANTITY | b. SRDR | ||||
| FORMATS | c. |
MAINT. &
REPAIR
PARTS
| i. QUANTITY | ||
| DATA | ii. GFE |
QUANTITY
| 1.0 | 1 | Aircraft System | X | |||
| 1.1 | 2 | Aircraft System, Integration, Assembly, Test, and Checkout | X | |||
| 1.2 | 2 | Air Vehicle | X | |||
| 1.2.1 | 3 | Air Vehicle Integration, Assembly, Test, and Checkout | X | |||
| 1.2.1.1 | 4 | Integration and Assembly | X | X | X | |
| 1.2.1.2 | 4 | Test and Checkout | X | X | X | |
| 1.2.1.3 | 4 | Rate Tooling | X | X | X | |
| 1.2.2 | 3 | Airframe | X | |||
| 1.2.2.1 | 4 | Airframe Integration, Assembly, Test, and Checkout | X | |||
| 1.2.2.2 | 4 | Fuselage | X | |||
| 1.2.2.2.1 | 5 | Forward Fuselage | X | X | X | |
| 1.2.2.2.2 | 5 | Center Fuselage | X | X | X | |
| 1.2.2.2.3 | 5 | Aft Fuselage | X | X | X | |
| 1.2.2.2.4 | 5 | Other Fuselage (specify) | X | X | X | |
| 1.2.2.3 | 4 | Wing | X | X | X | |
| 1.2.2.4 | 4 | Empennage | X | X | X | |
| 1.2.2.5 | 4 | Nacelle | X | X | X | |
| 1.2.2.6 | 4 | Other Airframe Components 1..n (Specify) | X | X | X | |
| 1.2.3 | 3 | Propulsion | X | X | ||
| 1.2.4 | 3 | Vehicle Subsystems | X | |||
| 1.2.4.1 | 4 | Vehicle Subsystem Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.4.2 | 4 | Flight Control Subsystem | X | |||
| 1.2.4.2.1 | 5 | Flight Control Hardware Integration, Assembly, Test and Checkout | X | X | X | |
| 1.2.4.2.2 | 5 | Flight Control Hardware 1..n (Specify) | X | X | X | |
| 1.2.4.2.3 | 5 | Flight Control Software Release 1..n (Specify) | X | X | X | |
| 1.2.4.3 | 4 | Auxiliary Power Subsystem | X | |||
| 1.2.4.3.1 | 5 | Auxiliary Power Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.4.3.2 | 5 | Auxiliary Power Hardware 1..n (Specify) | X | X | X | |
| 1.2.4.3.3 | 5 | Auxiliary Power Software Release 1..n (Specify) | X | X | X | |
| 1.2.4.4 | 4 | Hydraulic Subsystem | X | X | ||
| 1.2.4.5 | 4 | Electrical Subsystem | X | |||
| 1.2.4.5.1 | 5 | Electrical Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.4.5.2 | 5 | Electrical Hardware 1..n (Specify) | X | X | X | |
| 1.2.4.5.3 | 5 | Electrical Software Release 1..n (Specify) | X | X | X | |
| 1.2.4.6 | 4 | Crew Station Subsystem | X | |||
| 1.2.4.6.1 | 5 | Crew Station Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.4.6.2 | 5 | Canopy /Cockpit System | X | X | X | |
| 1.2.4.6.3 | 5 | Mechanical System | X | X | X | |
| 1.2.4.6.4 | 5 | Fire Protection System | X | X | X | |
| 1.2.4.6.5 | 5 | Crew Station Software Release 1..n (Specify) | X | X | X | |
| 1.2.4.7 | 4 | Environmental Control Subsystem | X | X | ||
| 1.2.4.8 | 4 | Fuel Subsystem | X | |||
| 1.2.4.8.1 | 5 | Fuel Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.4.8.2 | 5 | Fuel Subsystem Hardware 1..n (Specify) | X | X | X | |
| 1.2.4.8.3 | 5 | Fuel Subsystem Software Release 1..n (Specify) | X | X | X | |
| 1.2.4.9 | 4 | Landing Gear | X | X | ||
| 1.2.4.10 | 4 | Rotor Group | X | X | ||
| 1.2.4.11 | 4 | Drive Group | X | X | ||
| 1.2.4.12 | 4 | Vehicle Subsystem Software Release 1..n (Specify) | X | X | X | |
| 1.2.4.13 | 4 | Other Subsystems 1...n (Specify) | X | |||
| 1.2.4.13.1 | 5 | Other Vehicle Subsystem Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.4.13.2 | 5 | Other Vehicle Subsystem Hardware 1..n (Specify) | X | X | X | |
| 1.2.4.13.3 | 5 | Other Vehicle Subsystems Software Release 1..n (Specify) | X | X | X | |
| 1.2.5 | 3 | Avionics | X | |||
| 1.2.5.1 | 4 | Avionics Integration, Assembly, Test And Checkout | X | X | X | |
| 1.2.5.2 | 4 | Communication/Identification | X | |||
| 1.2.5.2.1 | 5 | Communication/Identification Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.5.2.2 | 5 | Communication/Identification Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.2.3 | 5 | Communication/Identification Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.3 | 4 | Navigation/Guidance | X | |||
| 1.2.5.3.1 | 5 | Navigation/Guidance Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.5.3.2 | 5 | Navigation/Guidance Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.3.3 | 5 | Navigation/Guidance Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.4 | 4 | Mission Computer/Processing | X | |||
| 1.2.5.4.1 | 5 | Mission Computer/Processing Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.5.4.2 | 5 | Mission Computer/Processing Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.4.3 | 5 | Mission Computer/Processing Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.5 | 4 | Fire Control | X | X | ||
| 1.2.5.6 | 4 | Data Display & Control | X | |||
| 1.2.5.6.1 | 5 | Data Display and Control Hardware Integration, Assembly, Test And Checkout | X | X | X | |
| 1.2.5.6.2 | 5 | Data Display & Control Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.6.3 | 5 | Data Display & Control Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.7 | 4 | Survivability | X | |||
| 1.2.5.7.1 | 5 | Survivability Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.5.7.2 | 5 | Survivability Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.7.3 | 5 | Survivability Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.8 | 4 | Reconnaissance | X | X | ||
| 1.2.5.9 | 4 | Electronic Warfare | X | X | ||
| 1.2.5.10 | 4 | Automatic Flight Control | X | X | ||
| 1.2.5.11 | 4 | Health Monitoring System | X | |||
| 1.2.5.11.1 | 5 | Health Monitoring Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.5.11.2 | 5 | Health Monitoring System Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.11.3 | 5 | Health Monitoring System Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.12 | 4 | Stores Management | X | X | ||
| 1.2.5.13 | 4 | Avionics Software Release 1..n (Specify) | X | X | X | |
| 1.2.5.14 | 4 | Other Avionics Subsystems 1...n (Specify) | X | |||
| 1.2.5.14.1 | 5 | Other Avionics Subsystem Hardware Integration, Assembly, Test, and Checkout | X | X | X | |
| 1.2.5.14.2 | 5 | Other Avionics Subsystem Hardware 1..n (Specify) | X | X | X | |
| 1.2.5.14.3 | 5 | Other Avionics Subsystem Software Release 1..n (Specify) | X | X | X | |
| 1.2.6 | 3 | Armament/Weapons Delivery | X | X | ||
| 1.2.7 | 3 | Auxiliary Equipment | X | X | X | |
| 1.2.8 | 3 | Furnishings and Equipment | X | X | X | |
| 1.2.9 | 3 | Air Vehicle Software Release 1..n (Specify) | X | X | X | |
| 1.2.10 | 3 | Other Air Vehicle 1...n (Specify) | X | X | X | |
| 1.3 | 2 | Payload/Mission System | X | X | ||
| 1.4 | 2 | Ground/Host Segment | X | X | ||
| 1.5 | 2 | Aircraft System Software Release 1...n (Specify) | X | X | X | |
| 1.6 | 2 | Systems Engineering | ||||
| 1.6.1 | 3 | Software Systems Engineering | X | X | X | |
| 1.6.2 | 3 | Integrated Logistics Support (ILS) Systems Engineering | X | X | ||
| 1.6.3 | 3 | Cybersecurity Systems Engineering | X | X | ||
| 1.6.4 | 3 | Core Systems Engineering | X | X | ||
| 1.6.5 | 3 | Other Systems Engineering 1...n (Specify) | X | X | ||
| 1.7 | 2 | Program Management | ||||
| 1.7.1 | 3 | Software Program Management | X | X | X | |
| 1.7.2 | 3 | Integrated Logistics Support (ILS) Program Management | X | X | ||
| 1.7.3 | 3 | Cybersecurity Management | X | X | ||
| 1.7.4 | 3 | Core Program Management | X | X | ||
| 1.7.5 | 3 | Other Program Management 1...n (Specify) | X | X | ||
| 1.8 | 2 | System Test and Evaluation | ||||
| 1.8.1 | 3 | Development Test and Evaluation | ||||
| 1.8.1.1 | 4 | System Acceptance Test (SAT) | X | X | ||
| 1.8.1.2 | 4 | Wind Tunnel | X | X | ||
| 1.8.1.3 | 4 | Structural Test | X | X | ||
| 1.8.1.4 | 4 | Flight Test | X | X | ||
| 1.8.1.5 | 4 | Ground Test | X | X | ||
| 1.8.1.6 | 4 | Cybersecurity Test and Evaluation | ||||
| 1.8.1.6.1 | 5 | Cybersecurity Development Test | X | X | ||
| 1.8.1.6.2 | 5 | Cybersecurity Operational Test | X | X | ||
| 1.8.1.6.3 | 5 | Cybersecurity Other (1...n) | X | X | ||
| 1.8.1.7 | 4 | Service/Agency DT&E 1...n (Specify) (GOV ONLY) | X | X | ||
| 1.8.1.8 | 4 | Other DT&E Tests 1...n (Specify) | X | X | ||
| 1.8.2 | 3 | Operational Test and Evaluation | ||||
| 1.8.2.1 | 4 | Limited User Evaluation (LUE/M-LUT/FUE) | X | X | ||
| 1.8.2.2 | 4 | Interoperability Testing (IOP with IA/OT&E) | X | X | ||
| 1.8.2.3 | 4 | Flight Tests | X | X | ||
| 1.8.2.4 | 4 | Ground Tests | X | X | ||
| 1.8.2.5 | 4 | Cybersecurity Test and Evaluation | ||||
| 1.8.2.5.1 | 5 | Cybersecurity Development Test | X | X | ||
| 1.8.2.5.2 | 5 | Cybersecurity Operational Test | X | X | ||
| 1.8.2.5.3 | 5 | Cybersecurity Other (1...n) | X | X | ||
| 1.8.2.6 | 4 | Other OT&E Tests 1...n (Specify) | X | X | ||
| 1.8.3 | 3 | Live Fire Test and Evaluation | X | X | ||
| 1.8.4 | 3 | Mock-ups/System Integration Labs (SILs) | X | X | ||
| 1.8.5 | 3 | Test and Evaluation Support | X | X | ||
| 1.8.6 | 3 | Test Facilities | ||||
| 1.8.6.1 | 4 | Commercial (GOV ONLY) | X | X | ||
| 1.8.6.2 | 4 | Government (Pay-as-You-Go) (GOV ONLY) | X | X | ||
| 1.9 | 2 | Training | ||||
| 1.9.1 | 3 | Equipment | X | |||
| 1.9.1.1 | 4 | Operator Instructional Equipment | X | X | X | |
| 1.9.1.2 | 4 | Maintainer Instructional Equipment | X | X | X | |
| 1.9.2 | 3 | Services | ||||
| 1.9.2.1 | 4 | Operator Instructional Services | ||||
| 1.9.2.1.1 | 5 | Development of Training Materials | X | X | ||
| 1.9.2.1.2 | 5 | Provide Training | X | X | ||
| 1.9.2.2 | 4 | Maintainer Instructional Services | ||||
| 1.9.2.2.1 | 5 | Development of Training Materials | X | X | ||
| 1.9.2.2.2 | 5 | Provide Training | X | X | ||
| 1.9.3 | 3 | Facilities | X | X | ||
| 1.9.4 | 3 | Training Software 1...n (Specify) | X | X | ||
| 1.10 | 2 | Data | ||||
| 1.10.1 | 3 | Data Deliverables 1...n (Specify) | X | X | ||
| 1.10.2 | 3 | Data Repository | X | X | ||
| 1.10.3 | 3 | Data Rights 1...n (Specify) | X | X | ||
| 1.11 | 2 | Peculiar Support Equipment | X | |||
| 1.11.1 | 3 | Test and Measurement Equipment | X | X | ||
| 1.11.2 | 3 | Support and Handling Equipment | X | X | ||
| 1.12 | 2 | Common Support Equipment | X | |||
| 1.12.1 | 3 | Test and Measurement Equipment | X | X | ||
| 1.12.2 | 3 | Support and Handling Equipment | X | X | ||
| 1.13 | 2 | Operational/Site Activation by Site 1...n (Specify) | ||||
| 1.13.1 | 3 | System Assembly, Installation and Checkout on Site | ||||
| 1.13.1.1 | 4 | Deployment HW and SW | X | X | ||
| 1.13.1.2 | 4 | Site Activation | X | X | ||
| 1.13.2 | 3 | Contractor Technical Support | X | X | ||
| 1.13.3 | 3 | Site Construction | X | X | ||
| 1.13.4 | 3 | Site/Ship/Vehicle Conversion | X | X | ||
| 1.13.5 | 3 | Interim Contractor Support (ICS) | X | X | ||
| 1.14 | 2 | Contractor Logistics Support (CLS) | X | X | ||
| 1.15 | 2 | Industrial Facilities | X | |||
| 1.16 | 2 | Initial Spares and Repair Parts | X | |||
| 1.16.1 | 3 | PMP Spare and Repair 1...n (Specify) | X | X | X | |
| 1.16.2 | 3 | Support Equipment Spare and Repair Parts | X | X | X | |
| 1.16.3 | 3 | Training Equipment Spare and Repair Parts | X | X | X | |
| 1.16.4 | 3 | Packaging, Handling, Storage, and Transportation (PHS&T) | X | |||
| 1.16.4.1 | 4 | Containers | X | X | X | |
| 1.16.4.2 | 4 | Transportation | X | X | X | |
| Subtotal Cost | X | X | ||||
| Reporting Contractor G&A | X | X | ||||
| Reporting Contractor Undistributed Budget | X | X | ||||
| Reporting Contractor Management Reserve | X | X | ||||
| Reporting Contractor FCCM | X | X | ||||
| Total Cost | X | X | ||||
| Reporting Contractor Profit/Loss or Fee | X | X | ||||
| Total Price | X | X | ||||
| DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019 |
DD Form 2794, Pg 3 (EVENTS)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||||
| 14. CSDR SUBMISSION EVENTS | |||||||
| a. | |||||||
| EVENT ID | b. | ||||||
| DATA REPORT(S) | c. | ||||||
| SUBMISSION EVENT NAME | d. | ||||||
| REPORT CYCLE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Award | Initial | 20240401 | 20240601 | ||
| 2 | Technical Data Report | Contract Award | Initial | 20240401 | 20240601 | ||
| 5 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 1 | Interim | 20250401 | 20250601 | ||
| 6 | Technical Data Report | Annual Report 1 | Interim | 20250401 | 20250601 | ||
| 7 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 2 | Interm | 20260401 | 20260601 | ||
| 8 | Technical Data Report | Annual Report 2 | Interim | 20260401 | 20260601 | ||
| 9 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 3 | Interim | 20270401 | 20270601 | ||
| 10 | Technical Data Report | Annual Report 3 | Interim | 20270401 | 20270601 | ||
| 11 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 4 | Interim | 20280401 | 20280601 | ||
| 12 | Technical Data Report | Annual Report 4 | Interim | 20280401 | 20280601 | ||
| 13 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 5 | Interim | 20290401 | 20290601 | ||
| 14 | Technical Data Report | Annual Report 5 | Interim | 20290401 | 20290601 | ||
| 15 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 6 | Interim | 20300401 | 20300601 | ||
| 16 | Technical Data Report | Annual Report 6 | Interim | 20300401 | 20300601 | ||
| 17 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 7 | Interim | 20310401 | 20310601 | ||
| 18 | Technical Data Report | Annual Report 7 | Interim | 20310401 | 20310601 | ||
| 19 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 8 | Interim | 20320401 | 20320601 | ||
| 20 | Technical Data Report | Annual Report 8 | Interim | 20320401 | 20320601 | ||
| 21 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Completion (60 days from completion) | Final | 20330401 | 23360601 | ||
| 22 | Technical Data Report | Contract Completion (60 days from completion) | Final | 20330401 | 20330601 | ||
| DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 4 (REMARKS)
| COST AND SOFTWARE DATA REPORTING PLAN |
| 15. REMARKS |
| The contractor must report costs on all CLINs associated with the KC-135 Center Console Refresh contract including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. Costs should not be omitted based on contract CLIN structure or definition. |
| FAC vs EAC |
| The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes. |
| NON-RECURRING/RECURRING DEFINITIONS |
| Recurring and Non-Recurring Costs required for all levels: |
| Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management. |
| Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out. |
| Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities. |
| Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management. |
| Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery. |
| Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests. |
| Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed. |
| Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts. |
| Examples of System Test and Evaluation activities include development of test plans/procedures; subsystem and system level test and integration for developmental articles; test equipment in support of development including for static & fatigue testing, test stands, wind tunnel models, stress analysis, ballistics testing, flight, ground or sea testing of system, redesign from testing, retesting; System/Software Integration Laboratory (SIL) development; and analysis to support verification, validation & certification. Examples of Training activity include initial courseware development and simulator development. Examples of Initial Spares and Repair Parts activity include spare parts and material in support of the nonrecurring subsystem/system level articles. |
| Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts. |
| IRAD EFFORT |
| The contractor should list the major relevant IRAD projects leveraged for this development effort, provide a brief description of the cost of the projects, and provide/attach any more detailed actual cost information at the level available. |
| WBS INDEX AND DICTIONARY |
| The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element. |
The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.
For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.
| COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES | |
| Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable. | |
| 1921-3 CONTRACTOR BUSINESS DATA REPORT | |
| a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate | Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. |
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA.If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.
| END ITEMS/ORDER LOTS SCOPE IDIQ |
| Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders. |
| COST AND HOUR REPORT UNIT/SUBLOT REPORTING |
| The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7. |
| QUANTITY REPORTING |
| a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section. |
b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.
| FINAL COST REPORT |
| Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred. |
| CSDR READINESS REVIEW (CSDR-RR) also known as Post Award Conference (PAC) |
| The Reporting Entity shall attend and participate in a CSDR Readiness Review meeting (also known as the Post award CSDR conference) which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and standard functional categories in the FlexFile (functional data elements in the 1921 series) codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary. |
| RESOURCE DISTRIBUTION TABLE (RDT) |
| The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DoDI 5000.02 and DoDM 5000.04-M-1. |
| PERIOD OF PERFORMANCE (POP) |
| If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance. |
| DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 5 (SCOPE DEF)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||
| INTRA-CONTRACT SCOPE REPORTING DEFINITION | |||||
| 16. ORDERS/LOTS | |||||
| a. ID | b. NAME | c. PHASE/MILESTONE | |||
| 1 | TBD Contract Number | ||||
| 17. END ITEMS | |||||
| a. ID | b. NAME | ||||
| 1 | Prototype 1 - A Kits | ||||
| 2 | Prototype 1 - B Kits | ||||
| 3 | Prototype 2 - A Kits | ||||
| 4 | Prototype 2 - B Kits | ||||
| 5 | Common | ||||
| 18. OPTIONAL REQUIREMENTS | |||||
| a. ORDER/LOT ID | b. END ITEM ID | c. UNIT REPORTING | |||
| (X if applicable) | d. SEQUENCING |
(X if applicable)
| 1 | 1 | X | X |
| 1 | 2 | X | X |
| DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019 |
DD Form 2794, Pg 8 (TECH RQTS)
| COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS | ||||||||||
| TECHNICAL PARAMETER REQUIREMENTS | ||||||||||
| 26. WBS | ||||||||||
| ELEMENT CODE | 27. WBS ELEMENT NAME | 28. ITEM TYPE | 29. TECHNICAL PARAMETER | |||||||
| a. PARAMETER NAME | b. UNIT OF MEASURE | c. UNIT OF MEASURE QUALIFIER | d. REPEATABLE | e. REMARKS | ||||||
| 1.2.1 | Air Vehicle Integration, Assembly, Test, and Checkout | Heritage | New Design | Percent | ||||||
| 1.2.1 | Air Vehicle Integration, Assembly, Test, and Checkout | Heritage | Predecessor System | Descriptor | ||||||
| 1.2.1 | Air Vehicle Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.1 | Air Vehicle Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.4 | Vehicle Subsystems | Heritage | New Design | Percent | ||||||
| 1.2.4 | Vehicle Subsystems | Heritage | Predecessor System | Descriptor | ||||||
| 1.2.4.1 | Vehicle Subsystem Integration, Assembly, Test, and Checkout | Heritage | New Design | Percent | ||||||
| 1.2.4.1 | Vehicle Subsystem Integration, Assembly, Test, and Checkout | Heritage | Predecessor System | Descriptor | ||||||
| 1.2.4.1 | Vehicle Subsystem Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.4.1 | Vehicle Subsystem Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.4.5.1 | Electrical Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.4.5.1 | Electrical Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Power - Subsystem Total | Watts | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Power - Subsystem Peak | Watts | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Power - Supply Performance Period | Seconds | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Power - Supply Average | Volts | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Volume of Electrical Power System | Cubic Inches | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Number of Power Supply Inputs - Alternating Current (AC) | Quantity | Inputs | |||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Number of Power Supply Inputs - Direct Current (DC) | Quantity | Inputs | |||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Number of Power Supply Outputs - Direct Current (DC) | Quantity | Outputs | |||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Type of Power | List | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Type of Battery | List | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Power | Number of Stages Covered | Quantity | Stages | |||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Battery | Battery Capacity | Ampere Hours | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Battery | Output Voltage | Volts | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Battery | Type of Battery | List | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Battery | Number of Battery Cells | Quantity | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.4.5.2 | Electrical Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.4.6.1 | Crew Station Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.4.6.1 | Crew Station Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.4.6.2 | Canopy /Cockpit System | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.4.6.2 | Canopy /Cockpit System | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.4.6.2 | Canopy /Cockpit System | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.4.8.1 | Fuel Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.4.8.1 | Fuel Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.4.8.2 | Fuel Subsystem Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.4.8.2 | Fuel Subsystem Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.4.8.2 | Fuel Subsystem Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.4.8.2 | Fuel Subsystem Hardware 1..n (Specify) | FuelSystem | Fuel Capacity | Gallons | ||||||
| 1.2.4.13.1 | Other Vehicle Subsystem Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.4.13.1 | Other Vehicle Subsystem Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.4.13.2 | Other Vehicle Subsystem Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5 | Avionics | Heritage | New Design | Percent | ||||||
| 1.2.5 | Avionics | Heritage | Predecessor System | Descriptor | ||||||
| 1.2.5.1 | Avionics Integration, Assembly, Test And Checkout | Heritage | New Design | Percent | ||||||
| 1.2.5.1 | Avionics Integration, Assembly, Test And Checkout | Heritage | Predecessor System | Descriptor | ||||||
| 1.2.5.1 | Avionics Integration, Assembly, Test And Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.1 | Avionics Integration, Assembly, Test And Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.2.1 | Communication/Identification Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.2.1 | Communication/Identification Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Amplifier | Peak Output Power | Watts | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Amplifier | Average Output Power | Watts | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Amplifier | Frequency - Maximum | Megahertz | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Amplifier | Frequency - Minimum | Megahertz | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Amplifier | Amplifier Efficiency | Percent | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Frequency Band | List | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Frequency Range | Megahertz | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Aperture - Antenna | Inches | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Number of Sub Arrays | Quantity | Per Antenna Face | |||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Tunable Bandwidth | Gigahertz | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Type of Steering | List | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Pattern Type | List | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Technology Type | Descriptor | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Operational Mode | List | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | Antenna | Bandwidth | Gigahertz | Instantaneous | |||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | TransReceivRF | Transmitter Power Output - Peak | Watts | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | TransReceivRF | Transmitter Power Output - Average | Watts | ||||||
| 1.2.5.2.2 | Communication/Identification Hardware 1..n (Specify) | TransReceivRF | Bandwidth | Megahertz | ||||||
| 1.2.5.3.1 | Navigation/Guidance Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.3.1 | Navigation/Guidance Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Amplifier | Peak Output Power | Watts | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Amplifier | Average Output Power | Watts | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Amplifier | Frequency - Maximum | Megahertz | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Amplifier | Frequency - Minimum | Megahertz | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Amplifier | Amplifier Efficiency | Percent | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Frequency Band | List | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Frequency Range | Megahertz | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Aperture - Antenna | Inches | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Number of Sub Arrays | Quantity | Per Antenna Face | |||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Tunable Bandwidth | Gigahertz | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Type of Steering | List | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Pattern Type | List | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Technology Type | Descriptor | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Operational Mode | List | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | Antenna | Bandwidth | Gigahertz | Instantaneous | |||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | TransReceivRF | Transmitter Power Output - Peak | Watts | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | TransReceivRF | Transmitter Power Output - Average | Watts | ||||||
| 1.2.5.3.2 | Navigation/Guidance Hardware 1..n (Specify) | TransReceivRF | Bandwidth | Megahertz | ||||||
| 1.2.5.4.1 | Mission Computer/Processing Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.4.1 | Mission Computer/Processing Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.4.2 | Mission Computer/Processing Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5.6.1 | Data Display and Control Hardware Integration, Assembly, Test And Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.6.1 | Data Display and Control Hardware Integration, Assembly, Test And Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Display | Type of Display | List | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Display | Size of monitor (diagonal) | Inches | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Display | Height | Inches | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Display | Applicable TSOs | Descriptor | ||||||
| 1.2.5.6.2 | Data Display & Control Hardware 1..n (Specify) | Display | Civil Airspace Access Functions | List | ||||||
| 1.2.5.7.1 | Survivability Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.7.1 | Survivability Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5.7.2 | Survivability Hardware 1..n (Specify) | Countermeasures | Range - Maximum | Kilometers | ||||||
| 1.2.5.11.1 | Health Monitoring Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.11.1 | Health Monitoring Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | Computer | Simultaneous Multi-Mode Operation | List | ||||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | Computer | Processor Type | Descriptor | ||||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | Computer | Computing Performance | Millions of Instructions per Second | ||||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.11.2 | Health Monitoring System Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.5.14.1 | Other Avionics Subsystem Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | |||||
| 1.2.5.14.1 | Other Avionics Subsystem Hardware Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | |||||
| 1.2.5.14.2 | Other Avionics Subsystem Hardware 1..n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | ||||
| 1.2.5.14.2 | Other Avionics Subsystem Hardware 1..n (Specify) | PhysicalStruc | Volume | Cubic Inches | ||||||
| 1.2.5.14.2 | Other Avionics Subsystem Hardware 1..n (Specify) | PhysicalStruc | Weight | Pounds | ||||||
| 1.2.5.14.2 | Other Avionics Subsystem Hardware 1..n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | ||||||
| 1.2.5.14.2 | Other Avionics Subsystem Hardware 1..n (Specify) | ElecBox | Application Specific Integrated Circuit (ASIC) Designs | Quantity | ASICs | |||||
| 1.2.5.14.2 | Other Avionics Subsystem Hardware 1..n (Specify) | ElecBox | Field Programmable Gate Array (FPGA) Designs | Quantity | FPGAs | |||||
| 1.2.10 | Other Air Vehicle 1...n (Specify) | Heritage | New Design | Percent | ||||||
| 1.2.10 | Other Air Vehicle 1...n (Specify) | Heritage | Predecessor System | Descriptor | ||||||
| 1.6 | Systems Engineering | SysEng | Number of Requirement Document - "Shalls" | Quantity | Shalls | YG | ||||
| 1.6 | Systems Engineering | SysEng | Number of Platforms - Integrated | Quantity | Platforms | |||||
| 1.7 | Program Management | ProgMgmt | Frequency of Government Program Reviews | Quantity | Reviews per Year | |||||
| 1.7 | Program Management | ProgMgmt | Number of Contract Line Item Number (CLIN)s | Quantity | CLINs | |||||
| 1.7 | Program Management | ProgMgmt | Number of Subcontractors | Quantity | Subcontractors | |||||
| 1.7 | Program Management | ProgMgmt | Number of Customer Stakeholders | Quantity | Stakeholders | |||||
| 1.8.4 | Mock-ups/System Integration Labs (SILs) | SIL | Modeling Type | List | YG | |||||
| 1.8.4 | Mock-ups/System Integration Labs (SILs) | SIL | Mock-up / SIL - Size | Square Feet | by Facility / Suite | YG | ||||
| 1.8.4 | Mock-ups/System Integration Labs (SILs) | SIL | Mock-up / SIL - Primary Purpose | List | YG | |||||
| 1.9.1.1 | Operator Instructional Equipment | TrainDevice | Training Device Name | Descriptor | Training Device Name | YG |