TMIP-J Attachment 7 DD2794 CSDR Standard Plan.xls

DoD Form XLS spreadsheet 120 KB Posted

Attached to
Theater Medical Information Program Joint (TMIP-J) Sustainment
Solicitation number
HT003822R0001
Issued by

About this file

This document package includes a cost and software data reporting (CSDR) plan and related federal contract opportunity solicitation. The CSDR plan outlines reporting requirements for the Theater Medical Information Program Joint sustainment contract, including work breakdown structure elements, submission events, and technical data parameters. Key products and services under the single-award ID/IQ contract include program management, systems engineering, help desk support, data cleansing, IT infrastructure maintenance, hardware and software refresh, cybersecurity management, user training, system improvements, and facilities. Annual and final reporting will be conducted over the multiple-year ordering period using FlexFile and DD Form 1921 formats. Defense Health Agency Contracting Activity will issue the solicitation for the Theater Medical Information Program Joint sustainment and retirement. Responses are due by the dates specified in the solicitation and reporting plan.

View the file

Other versions and copies of DD Form 2794

File Revision Posted Attached to
9. DD2794_Cost and Software Reporting Plan_AF-24-M-C1_20240510.xls May 10, 2024 Space Development Agency (SDA) Advanced Fire Control Ground Infrastructure (AFCGI)
Attachment_21_DD2794 Avionics CSDR Plan_21 Nov 2022.xlsx Nov 21, 2022 T-6A Avionics Replacement Program
Attachment 0005 DD2794 Sustainment CSDR Standard Plan 23-R-0075 PRID 2022H018.xlsx 2022 Fuel Tank Combo-Pack for the Apache AH-64
Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan.xlsx Revision not stated Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
DHMS Deployment DD2794 CSDR Plan.xlsx Revision not stated Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS) Deployment Solutions
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf Revision not stated KC-135 Center Console Refresh (CCR) Revision 2
Attachment 0004 - DD2794 CSDR.xls Revision not stated Head, Rotary Wing for the Apache AH-64
Attachment 0005 - DD2794 Sustainment CSDR Standard Plan 23-B-0037.cplan.XML_Finalized.pdf Revision not stated Head, Rotary Wing for the Apache AH-64
ATTACHMENT 8 DD 2794 IDIQ CSDR Plan v2.xlsx Revision not stated RFP - Space Test Experiments Platform (STEP) 2. 0
J-16 DD 2794 CSDR Plan for BVY-1 ISIS TI-26-28-30 (2023-08-04) FINALIZED MEMO.pdf Revision not stated BVY-1 ISIS TI-26 TI-28 TI-30 Solicitation
DRAFT CSDR Plan F100 RDN DD Form 2794.xls Revision not stated Regional Depot Network (RDN) Re-manufacture of F100-PW-220/-220E/-229/-229EEP Series Engine Modules
DD2794 COST AND SOFTWARE DATA REPORTING PLAN.xls Revision not stated KC-135 Center Console Refresh (CCR)
Attachment 15 - DD2794 MK41 VLS Launcher.xls Revision not stated FY 22-27 MK 41 Vertical Launching System (VLS) Production
Attachment_0001_DD2794_CSDR_Plan.xls Revision not stated F-16 Brake Control System Redesign (BCSR)
Exhibit A1 A004 DD Form 2794 DISC_CSDR_Plan.xls Revision not stated Directorate for Test Resources (DTR) Instrumentation Support Contract (DISC) Draft RFP
N0010419RK082 Attach 1 - CSDR Co-Plan, DD Form 2794.pdf Revision not stated JSF C/P Cartridges IDIQ
APPENDIX_C_CSDR__DD2794_Attachment.xlsx Revision not stated KC-135 Aero-I SATCOM Replacement
Attachment_J-5_DD_2794_Co-Plan_for_MMM-_Procurement.xlsx Revision not stated Multifunction Modular Mast
Attachment_J-6_-_DD_2794_Co-Plan_for_MMM-_Development.xlsx Revision not stated Multifunction Modular Mast
ATT 54 CSDR DD 2794.xls Revision not stated T-34/T-44/T-6 Aircraft Maintenance and Contractor Logistics Support
Show all 20

Who attaches DD Form 2794

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
Joint Operational Medicine Information Systems (JOMIS)
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
C-FRP
XO&S
1c. PRIME MISSION PRODUCT
TMIP - J
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
XOther
2. COMMODITY TYPE
Information System/Defense Business System
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
TBD
5. LAST APPROVED PLAN DATE (YYYYMMDD)
TBD
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Christopher Metz
6b. ADDRESS (Include ZIP Code)
1700 North Moore Street Suite 2300 Arlington, VA 22209
6c. TELEPHONE NUMBER (Include Area Code)
(571) 225-4266
6d. E-MAIL ADDRESS
Christopher.R.Metz2.civ@mail.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
Joint Operational Medicine Information Systems (JOMIS)
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
TBD
iii. LOCATION
TBD
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD
9c. APPROPRIATION (check all that apply)
RDT&E
PROCUREMENT
XO&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
TBD
10b. APPROVED PLAN REVISION NUMBER
TBD
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

2.01Information Systems (IS)/Defense Business Systems (DBS) (Sustainment)
2.12Program ManagementXX
2.22Systems/Sustainment EngineeringXXX
2.32Change ManagementXX
2.42Help DeskXX
2.52Data Cleansing/Data MaintenanceXXX
2.62System/Database AdministrationXX
2.72IT Infrastructure/Network Maintenance SupportX
2.7.13IT Infrastructure Hardware/Equipment MaintenanceXX
2.7.23IT Infrastructure Software License Support ServicesXX
2.7.33IT Infrastructure ManagementXXX
2.7.43Other IT Infrastructure Support 1...n (Specify)XXX
2.82Operational Hardware Refresh/Upgrade
2.8.13End-User EquipmentXX
2.8.23Cybersecurity EquipmentXX
2.8.33IT Infrastructure and Enterprise Services EquipmentXX
2.8.43Other (Specify)XX
2.92Operational Software License Refresh/Update
2.9.13End-User Software LicenseXX
2.9.23Cybersecurity Software Licenses/ServicesXX
2.9.33IT Infrastructure and Enterprise Software Licenses/ServicesXX
2.9.43Other (Specify)XX
2.102Cybersecurity Maintenance ManagementX
2.10.13Cybersecurity Compliance Operations and TrackingXXX
2.10.23Follow-on Cybersecurity Test and EvaluationXXX
2.10.33Cybersecurity and IT Certification and AccreditationXXX
2.112Follow-on User TrainingXXX
2.122System Independent Verification and ValidationXXX
2.132Continuing System ImprovementsX
2.13.13Operational Hardware Modification
2.13.1.14Mod Kit Hardware DevelopmentXX
2.13.1.24Mod Kit Hardware ProcurementXX
2.13.1.34Mod Kit Hardware InstallationXX
2.13.23Software Release Modification/Enhancement 1...n (Specify)X
2.13.2.14Modifications/EnhancementsXXX
2.13.2.24Routine Fixes and Deficiency CorrectionXXX
2.13.2.34Installation/TestXXX
2.13.2.44IAVAsXXX
2.142AW/Safety/Networthiness CertificationXX
2.152FacilitiesXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile)Cost and Hour Report (FlexFile) - Contract Award (plus 12 months)Initial2022110120230101
2SRDR MaintenanceSRDR Maintenance - Contract Award (plus 12 months)Initial2022110120230101
3Technical Data ReportTechnical Data Report - Contract Award (plus 12 months)Initial2022110120230101
4CWBS DictionaryCWBS Dictionary - Contract Award (plus 12 months)Initial2022110120230101
5Cost and Hour Report (FlexFile)Cost and Hour Report (FlexFile) - Annual Report - OY1Interim2023110120240101
6SRDR MaintenanceSRDR Maintenance - Annual Report - OY1Interim2023110120240101
7Technical Data ReportTechnical Data Report - Annual Report - OY1Interim2023110120240101
8CWBS DictionaryCWBS Dictionary - Annual Report - OY1Interim2023110120240101
9Cost and Hour Report (FlexFile)Cost and Hour Report (FlexFile) - Annual Report - OY2Interim2024110120250101
10SRDR MaintenanceSRDR Maintenance - Annual Report - OY2Interim2024110120250101
11Technical Data ReportTechnical Data Report - Annual Report - OY2Interim2024110120250101
12CWBS DictionaryCWBS Dictionary - Annual Report - OY2Interim2024110120250101
13Cost and Hour Report (FlexFile)Cost and Hour Report (FlexFile) - Annual Report - OY3Interim2025110120260101
14SRDR MaintenanceSRDR Maintenance - Annual Report - OY3Interim2025110120260101
15Technical Data ReportTechnical Data Report - Annual Report - OY3Interim2025110120260101
16CWBS DictionaryCWBS Dictionary - Annual Report - OY3Interim2025110120260101
17Cost and Hour Report (FlexFile)Just in Time Cost and Hour Report (FlexFile)Interim2026110120270101
18SRDR MaintenanceJust in Time SRDR MaintenanceInterim2026110120270101
19Technical Data ReportJust in Time Technical Data ReportInterim2026110120270101
20CWBS DictionaryJust in Time CWBS DictionaryInterim2026110120270101
21Cost and Hour Report (FlexFile)Cost and Hour Report (FlexFile) - Contract CompletionFinal2026110120270101
22SRDR MaintenanceSRDR Maintenance - Contract CompletionFinal2026110120270101
23Technical Data ReportTechnical Data Report - Contract CompletionFinal2026110120270101
24CWBS DictionaryCWBS Dictionary - Contract CompletionFinal2026110120270101
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
The contractor must report costs on all CLINs associated with the (Insert contract name) contract including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. Costs should not be omitted based on contract CLIN structure or definition.
INITIAL REPORT
Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR plan.
i. Submission events marked "Initial" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No ATD costs are anticipated to reported on an "Initial" submission except for any certified precontract costs incurred prior to or on the date of contract award.
ii. Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported ATD, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).
iii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.
COVID-19 Remarks:
The Reporting Entity shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.

Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.

If applicable, the Reporting Entity shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.

If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.

Additional Data Fields #1-#12 (FlexFile): If applicable, the Reporting Entity shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

FAC vs EAC
The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.
NON-RECURRING/RECURRING DEFINITIONS
Recurring and Non-Recurring Costs required for all levels:
Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management.
Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out.
Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.
Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.
Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.
Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.
Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.
Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.
Examples of System Test and Evaluation activities include development of test plans/procedures; subsystem and system level test and integration for developmental articles; test equipment in support of development including for static & fatigue testing, test stands, wind tunnel models, stress analysis, ballistics testing, flight, ground or sea testing of system, redesign from testing, retesting; System/Software Integration Laboratory (SIL) development; and analysis to support verification, validation & certification. Examples of Training activity include initial courseware development and simulator development. Examples of Initial Spares and Repair Parts activity include spare parts and material in support of the nonrecurring subsystem/system level articles.
Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.
IRAD EFFORT
The contractor should list the major relevant IRAD projects leveraged for this development effort, provide a brief description of the cost of the projects, and provide/attach any more detailed actual cost information at the level available.
WBS INDEX AND DICTIONARY
The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.

For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
1921-3 CONTRACTOR BUSINESS DATA REPORT
a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.

END ITEMS/ORDER LOTS SCOPE IDIQ
Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.
COST AND HOUR REPORT UNIT/SUBLOT REPORTING
The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7.
QUANTITY REPORTING
a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

SRDR MAINTENANCE
a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

SRDR DEVELOPMENT- RELEASES AND COMPUTER SOFTWARE CONFIGURATION ITEMS (CSCIs)
For Software Release and CSCI WBS Element Names identified in Item 11c. as Subcomponent Release 1..n or Subcomponent CSCI 1..n, the Reporting Entity must specify the specific releases and associated CSCIs at the post award meeting in order to revise the CSDR Plan to reflect the Reporting Entity’s actual releases and associated CSCIs. See the SRDR Implementation Guide for more detail https://cade.osd.mil/policy/srdr
FINAL COST REPORT
Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.
CSDR READINESS REVIEW (CSDR-RR) also known as Post Award Conference (PAC)
The Reporting Entity shall attend and participate in a CSDR Readiness Review meeting (also known as the Post award CSDR conference) which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and standard functional categories in the FlexFile (functional data elements in the 1921 series) codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary.
RESOURCE DISTRIBUTION TABLE (RDT)
The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DODI 5000.73 and DoDM 5000.04-M-1.
PERIOD OF PERFORMANCE (POP)
If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance.
SUSTAINMENT
a. Reporting Entity shall provide the following Quantity information in the Remarks section of the Cost and Hour Report: number of systems supported by this contract, and number of repairs performed. The Reporting Entity must state the nominal capacity planned for each Delivery Order (e.g., the # of repairs, # of overhauls, # of flight hours, etc.) identified in the plan. This requirement is intended to capture what services are being bought with each effort.

b. For Element 1.6 Installation and Personnel Support, the quantity listed should reflect the number of sites/bases/installations.

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
TO1TMDSO&S
TO2MSATO&S
TO3Clinical ComponentsO&S
TO4Program ManagementO&S
TO5Integration and SustainmentO&S
17. END ITEMS
a. IDb. NAME
SBY1Sustainment BY1
SOY1Sustainment OY1
SOY2Sustainment OY2
SOY3Sustainment OY3
SOY4Sustainment OY4
18. OPTIONAL REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT REPORTING
(X if applicable)d. SEQUENCING

(X if applicable)

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

DD Form 2794, Pg 7 (SRDR MX)

COST AND SOFTWARE DATA REPORTING PLAN - SRDR MAINTENANCE
23. RELEASES
a. IDb. NAMEc. DATE
1Annual Releases BY120221101
2Annual Releases OY120231101
3Annual Releases OY220241101
4Annual Releases OY320251101
5Annual Releases OY420261101
24. PRODUCT SIZE REPORTING ELEMENTS
a. CODEb. NAMEc. RELEASE ID
2.2Systems/Sustainment Engineering1
2.5Data Cleansing/Data Maintenance1
2.7IT Infrastructure/Network Maintenance Support1
2.7.3IT Infrastructure Management1
2.7.4Other IT Infrastructure Support 1...n (Specify)1
2.10Cybersecurity Maintenance Management1
2.10.1Cybersecurity Compliance Operations and Tracking1
2.10.2Follow-on Cybersecurity Test and Evaluation1
2.10.3Cybersecurity and IT Certification and Accreditation1
2.11Follow-on User Training1
2.12System Independent Verification and Validation1
2.13Continuing System Improvements1
2.13.2Software Release Modification/Enhancement 1...n (Specify)1
2.13.2.1Modifications/Enhancements1
2.13.2.2Routine Fixes and Deficiency Correction1
2.13.2.3Installation/Test1
2.13.2.4AW/Safety/Networthiness Certification1
2.2Systems/Sustainment Engineering2
2.5Data Cleansing/Data Maintenance2
2.7IT Infrastructure/Network Maintenance Support2
2.7.3IT Infrastructure Management2
2.7.4Other IT Infrastructure Support 1...n (Specify)2
2.10Cybersecurity Maintenance Management2
2.10.1Cybersecurity Compliance Operations and Tracking2
2.10.2Follow-on Cybersecurity Test and Evaluation2
2.10.3Cybersecurity and IT Certification and Accreditation2
2.11Follow-on User Training2
2.12System Independent Verification and Validation2
2.13Continuing System Improvements2
2.13.2Software Release Modification/Enhancement 1...n (Specify)2
2.13.2.1Modifications/Enhancements2
2.13.2.2Routine Fixes and Deficiency Correction2
2.13.2.3Installation/Test2
2.13.2.4AW/Safety/Networthiness Certification2
2.2Systems/Sustainment Engineering3
2.5Data Cleansing/Data Maintenance3
2.7IT Infrastructure/Network Maintenance Support3
2.7.3IT Infrastructure Management3
2.7.4Other IT Infrastructure Support 1...n (Specify)3
2.10Cybersecurity Maintenance Management3
2.10.1Cybersecurity Compliance Operations and Tracking3
2.10.2Follow-on Cybersecurity Test and Evaluation3
2.10.3Cybersecurity and IT Certification and Accreditation3
2.11Follow-on User Training3
2.12System Independent Verification and Validation3
2.13Continuing System Improvements3
2.13.2Software Release Modification/Enhancement 1...n (Specify)3
2.13.2.1Modifications/Enhancements3
2.13.2.2Routine Fixes and Deficiency Correction3
2.13.2.3Installation/Test3
2.13.2.4AW/Safety/Networthiness Certification3
2.2Systems/Sustainment Engineering4
2.5Data Cleansing/Data Maintenance4
2.7IT Infrastructure/Network Maintenance Support4
2.7.3IT Infrastructure Management4
2.7.4Other IT Infrastructure Support 1...n (Specify)4
2.10Cybersecurity Maintenance Management4
2.10.1Cybersecurity Compliance Operations and Tracking4
2.10.2Follow-on Cybersecurity Test and Evaluation4
2.10.3Cybersecurity and IT Certification and Accreditation4
2.11Follow-on User Training4
2.12System Independent Verification and Validation4
2.13Continuing System Improvements4
2.13.2Software Release Modification/Enhancement 1...n (Specify)4
2.13.2.1Modifications/Enhancements4
2.13.2.2Routine Fixes and Deficiency Correction4
2.13.2.3Installation/Test4
2.13.2.4AW/Safety/Networthiness Certification4
2.2Systems/Sustainment Engineering5
2.5Data Cleansing/Data Maintenance5
2.7IT Infrastructure/Network Maintenance Support5
2.7.3IT Infrastructure Management5
2.7.4Other IT Infrastructure Support 1...n (Specify)5
2.10Cybersecurity Maintenance Management5
2.10.1Cybersecurity Compliance Operations and Tracking5
2.10.2Follow-on Cybersecurity Test and Evaluation5
2.10.3Cybersecurity and IT Certification and Accreditation5
2.11Follow-on User Training5
2.12System Independent Verification and Validation5
2.13Continuing System Improvements5
2.13.2Software Release Modification/Enhancement 1...n (Specify)5
2.13.2.1Modifications/Enhancements5
2.13.2.2Routine Fixes and Deficiency Correction5
2.13.2.3Installation/Test5
2.13.2.4AW/Safety/Networthiness Certification5
25. PRODUCT SIZE SUBMISSIONSc. RELEASE ID:12345
a. NUMBERb. NAMEIncluded?Included?Included?Included?Included?
2SRDR Maintenance - Contract Award (plus 12 months)X
6SRDR Maintenance - Annual Report - OY1XX
10SRDR Maintenance - Annual Report - OY2XXX
14SRDR Maintenance - Annual Report - OY3XXXX
18Just in Time SRDR MaintenanceXXXXX
21Cost and Hour Report (FlexFile) - Contract CompletionXXXXX
DRAFT DD FORM 2794 (PAGE 7), SRDR MAINTENANCE, JANUARY 2019

DD Form 2794, Pg 8 (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS
26. WBS
ELEMENT CODE27. WBS ELEMENT NAME28. ITEM TYPE29. TECHNICAL PARAMETER
a. PARAMETER NAMEb. UNIT OF MEASUREc. UNIT OF MEASURE QUALIFIERd. REPEATABLEe. REMARKS
2.4Help DeskHelp DeskTicketsQuantityTickets
2.5Data Cleansing/Data MaintenanceData Cleansing/Data MaintenanceDefects/bugsQuantityDefects/bugs
2.5Data Cleansing/Data MaintenanceData Cleansing/Data MaintenanceTest casesQuantityTest cases
2.5Data Cleansing/Data MaintenanceData Cleansing/Data MaintenanceNew test cases automatedQuantityTest cases
2.5Data Cleansing/Data MaintenanceData Cleansing/Data MaintenanceRefactorsQuantityRefactors
2.7.1IT Infrastructure Hardware/Equipment MaintenanceIT Infrastructure/Network Maintenance SupportEquipmentQuantityEquipment
2.7.2IT Infrastructure Software License Support ServicesIT Infrastructure/Network Maintenance SupportLicensesQuantityLicenses
2.8.1End-User EquipmentOperational Hardware Refresh/UpgradeEquipmentQuantityEquipment
2.8.2Cybersecurity EquipmentOperational Hardware Refresh/UpgradeEquipmentQuantityEquipment
2.8.3IT Infrastructure and Enterprise Services EquipmentOperational Hardware Refresh/UpgradeEquipmentQuantityEquipment
2.8.4Other (Specify)Operational Hardware Refresh/UpgradeLicensesQuantityLicenses
2.9.1End-User Software LicenseOperational Software License Refresh/UpdateLicensesQuantityLicenses
2.9.2Cybersecurity Software Licenses/ServicesOperational Software License Refresh/UpdateLicensesQuantityLicenses
2.9.3IT Infrastructure and Enterprise Software Licenses/ServicesOperational Software License Refresh/UpdateLicensesQuantityLicenses
2.10.1Cybersecurity Compliance Operations and TrackingCybersecurity Maintenance ManagementATOsQuantityATOs
2.10.2Follow-on Cybersecurity Test and EvaluationCybersecurity Maintenance ManagementATOsQuantityATOs
2.10.3Cybersecurity and IT Certification and AccreditationCybersecurity Maintenance ManagementATOsQuantityATOs
2.11Follow-on User TrainingFollow-on User TrainingEnd usersQuantityPeople
2.11Follow-on User TrainingFollow-on User TrainingSuper usersQuantityPeople
2.11Follow-on User TrainingFollow-on User TrainingEnd users provisionedQuantityPeople
2.11Follow-on User TrainingFollow-on User TrainingTrainers trainedQuantityPeople
2.13.2.2Routine Fixes and Deficiency CorrectionContinuing System ImprovementsDefects/bugsQuantityDefects/bugs
2.13.2.2Routine Fixes and Deficiency CorrectionContinuing System ImprovementsTest casesQuantityTest cases
2.13.2.2Routine Fixes and Deficiency CorrectionContinuing System ImprovementsNew test cases automatedQuantityTest cases
2.13.2.2Routine Fixes and Deficiency CorrectionContinuing System ImprovementsRefactorsQuantityRefactors
2.13.2.3Installation/TestContinuing System ImprovementsDefects/bugsQuantityDefects/bugs
2.13.2.3Installation/TestContinuing System ImprovementsTest casesQuantityTest cases
2.13.2.3Installation/TestContinuing System ImprovementsNew test cases automatedQuantityTest cases
2.13.2.3Installation/TestContinuing System ImprovementsRefactorsQuantityRefactors
2.15FacilitiesFacilitiesFacilitiesQuantityFacilities

File details come from the government source that posted it. Updated .