KC-135 Center Console Refresh (CCR) Revision 2

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
FA8105_CCR_Rev2
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Tinker AFB, Oklahoma 73145, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Materiel Command (AFLCMC) at Tinker Air Force Base is preparing to procure the KC-135 Center Console Refresh (CCR) Revision 2 system through a single Indefinite Delivery/Indefinite Quantity (ID/IQ) contract, with formal solicitation expected in 2026 following an extended pre-solicitation engagement period that includes multiple Requests for Information and an industry day scheduled for 25 March 2026.

The procurement targets replacement of the KC-135's Fuel System, Flight Display System, and Integrated Processing Cabinet with an integrated flight deck solution that adds autothrottle capability and addresses aircraft obsolescence. Work is performed at Tinker Air Force Base, Oklahoma. Contract award will be made on a best-value basis using tradeoff source selection procedures among technically acceptable proposals.

The Government is structuring this as a hybrid engagement with Cost-Plus-Incentive-Fee (CPIF) pricing for the three Engineering, Manufacturing and Development (EMD) CLINs (0001-0003) covering preliminary design review through qualification testing, simulator kit procurement, and Systems Integration Laboratory development, followed by Firm Fixed Price production CLINs for A-Kits, B-Kits, support equipment, and ancillary deliverables across a 4-year basic period plus six 1-year option periods. NAICS 336413 (small business size standard 1,250 employees); PSC 1680. Proposals must demonstrate minimum 15 percent small business participation on total evaluated price basis. Offerors and subcontractors require final facility clearance equal to the highest classification level specified on DD Form 254 prior to award; COMSEC compliance is required.

Technical evaluation emphasizes Technical Solution, System Strengths, Data Rights assertions, Schedule, Technical Risk, and Past Performance (within five years). Industry day participation and prior RFI responses are available on SAM.gov. Brandi Shelden is the Procurement Contracting Officer; Alejandra Marchesano handles contract inquiries. A revised System Requirements Document reflecting latest RFI inputs is in coordination. Facility clearance and an active DD2345 on file with the Defense Logistics Agency are prerequisites for accessing controlled documents and attending industry engagement events.

Notice text

57 versions

Update #57 · Latest ·

16 Oct 26

Updating the Q&A with Government responses.

14 Oct 26

Updating the Q&A with Government responses.

30 Sep 26

Upon additional market research, some responses to previous questions have been revised.  Those responses as well as the remaining open submitted questions are addressed and posted below.

25 Sep 26

Responses to questions have been attache.  The Government is working on responses to the remaining submitted questions and will be posting them as soon as possible.  

31 Aug 26

Added two documents to the Bidder's Library -  Projected KC-135 modifications during CCR install and Rev D of Attitude Plate.

24 Aug 26

Updating the Q&A with Government responses.

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #56 ·

14 Oct 26

Updating the Q&A with Government responses.

30 Sep 26

Upon additional market research, some responses to previous questions have been revised.  Those responses as well as the remaining open submitted questions are addressed and posted below.

25 Sep 26

Responses to questions have been attache.  The Government is working on responses to the remaining submitted questions and will be posting them as soon as possible.  

31 Aug 26

Added two documents to the Bidder's Library -  Projected KC-135 modifications during CCR install and Rev D of Attitude Plate.

24 Aug 26

Updating the Q&A with Government responses.

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #55 ·

30 Sep 26

Upon additional market research, some responses to previous questions have been revised.  Those responses as well as the remaining open submitted questions are addressed and posted below.

25 Sep 26

Responses to questions have been attache.  The Government is working on responses to the remaining submitted questions and will be posting them as soon as possible.  

31 Aug 26

Added two documents to the Bidder's Library -  Projected KC-135 modifications during CCR install and Rev D of Attitude Plate.

24 Aug 26

Updating the Q&A with Government responses.

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #54 ·

25 Sep 26

Responses to questions have been attache.  The Government is working on responses to the remaining submitted questions and will be posting them as soon as possible.  

31 Aug 26

Added two documents to the Bidder's Library -  Projected KC-135 modifications during CCR install and Rev D of Attitude Plate.

24 Aug 26

Updating the Q&A with Government responses.

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #53 ·

31 Aug 26

Added two documents to the Bidder's Library -  Projected KC-135 modifications during CCR install and Rev D of Attitude Plate.

24 Aug 26

Updating the Q&A with Government responses.

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #52 ·

24 Aug 26

Updating the Q&A with Government responses.

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #51 ·

14 Aug 26

Updating the Q&A with Government responses.

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #50 ·

6 Aug 26

Updating the Q&A with Government response.

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responses.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #49 ·

28 Jul 26

Updating the Q&A with Government responses.  The resulting solicitation Amendment 01 will be posted under the Solicitation notice for KC-135 Center Console Refresh (CCR) Revision 2.

24 Jul 26

Updating the Q&A with Government responss.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #48 ·

24 Jul 26

Updating the Q&A with Government responss.  This should address all open questions.

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #47 ·

22 Jul 26

Updating the Q&A with Government response.

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #46 ·

09 Jul 26

Updating the bidder's library to include two documents referenced in the system engineerying plan (SEP).

1 Jul 26

The remaining unanswered Q&A questions from industry have been addressed and uploaded by the Government.

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #45 ·

24 June 26-

Updated and attached the Q&A document with recent questions from Industry and responses from the Government,  The few remaining unanswered questions will be uploaded next week.

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #44 ·

03 June 26 - SPECIAL ANNOUNCEMENT

To ensure the integrity of the procurement process, fair and open competition, and compliance with the Federal Acquisition Regulation (FAR), all prospective offerors are hereby notified of the following protocols: 

The PCO is the only individual authorized to clarify requirements, answer questions, accept recommendations, or bind the Government regarding this acquisition.

Vendors are asked to not use higher-level leadership meetings, technical exchanges, or informal discussions with Government personnel to bypass the PCO. Any procurement-related topics raised in these forums will not be addressed, and personnel are being instructed to immediately redirect the vendor to the PCO.

All questions, comments, and recommendations must be submitted in writing directly to the PCO, brandi.shelden@us.af.mil

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #43 ·

28 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government 

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #42 ·

26 May 26

Removed previous SRD and added a copy without password requirement. Updated Draft Solicitation to searchable format.

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #41 ·

21 May 26

Uploaded Memo for Draft RFP and timeline updates.

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #40 ·

11 May 26

Uploaded the block 45 Electrical Loads Analysis

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #39 ·

06 May 26

Updated and attached the Q&A document with recent questions from Industry and responses from the Government

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #38 ·

06 May 26

Removed and replaced the KC-135 CCR Baseline Configuration pdf.  

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #37 ·

05 May 26

Added KC-135 CCR Baseline Configuration to Bidder's Library

Added TO 00-5-16 to Bidder's Library

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #36 ·

05 May 26

Added In Person Industry Day Measurements for KC-135 CCR Memo

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #35 ·

28 Apr 26

Added In Person Industry Day Pictures KC-135 CCR Memo 

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #34 ·

23 April 2026

The following documents have been deleted due to non-applicability and/or being outdated. 

  • (CUI) AFRL-STO MBSE Style Guide v0.2.pdf
  • OMG SysML Ver 1.7.pdf

The following document has been uploaded

  • (U) AFRL MBSE Style Guide v2-1

------------------------------------------------------------------

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

------------------------------------------------------------------

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #33 ·

15 April 2026

Updated the Q&A documents for SOW, SRD, and Industry Day with Government responses.

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #32 ·

07 April 2026

NOTICE: AIRCRAFT TOUR ACCESS INFORMATION

The Government is requesting the following arrival times for all attendees participating in the upcoming Aircraft Tour:

• Non‑CAC Holders: Please arrive at the Tinker AFB Visitor’s Center at 6:00 a.m. to allow sufficient time for vetting and base access processing.

• CAC Holders: Please arrive at the Visitor’s Center at 7:30 a.m. for check‑in prior to the tour.

Important Reminder: Tinker Air Force Base has discontinued the Trusted Traveler Program. All individuals entering the installation, including those with CACs, must present a valid form of identification at the gate.

Please plan accordingly to avoid delays.

The tour is scheduled to conclude by 4:00 p.m CST

------------------------------------------------------------------

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #31 ·

03 April 2026

The Government is providing the following documents:

  • The Q&As from the questions asked during the Virtual Industry Day and the one‑on‑ones held in March 2026

  • Responses to a portion of the questions submitted separately by industry; responses to the remaining questions will be posted at a later time

  • Information for the Aircraft Tour

  • Additional documents for the Bidder’s Library

See attachments:

  • “CUI_Industry Day 1 and 2 Q&A”

  • “CUI KC‑135 CCR Industry Day Responses”

  • “Tinker PDM Aircraft Tour for KC‑135 CCR”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #30 ·

03 April 2026

The Government is providing the Q&As from the questions asked during the Virtual Industry Day and the one-on ones held on March 2026, as well as the information for the Aircraft Tour.

Additional questions submitted separately by industry will be posted at a later time.

See attachments:

“CUI_Industry Day 1 and 2 Q&A”

"Tinker PDM Aircraft Tour for KC-135 CCR"

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #29 ·

03 April 2026

CCR Virtual Industry Day - March 2026: Q&A

The Government is providing the Q&As from the questions asked during the Virtual Industry Day and the one-on ones held on March 2026.

Additional questions submitted separately by industry will be posted at a later time.

See attachment:

“CUI_Industry Day 1 and 2 Q&A”

------------------------------------------------------------------

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #28 ·

27 March 2026

CCR Virtual Industry Day -25 March 2026: Charts and Minutes for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on 25 March 2026, along with the meeting minutes from the session.

See attachment:

"CUI KC-135 CCR Industry Day Slides and Meeting Minutes"

------------------------------------------------------------------

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #27 ·

19 March 2026

Invitations for the morning session of the KC-135 Center Console Refresh Industry Day have been sent. If you RSVP'd and have not yet received your invitation, please contact the Contracting Officer, Ms. Brandi Shelden.

Due to the high volume of responses, additional individual sessions will be held on Thursday, March 26. Invitations for individual sessions will be sent out in the coming days.

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #26 ·

17 March 2026

NOTICE REGARDING DOCUMENT ACCESS

Several documents that were previously located in the controlled section have been moved to the public (uncontrolled) section. These documents are identical to the original versions, and no updates or changes have been made.

------------------------------------------------------------------

16 March 2026

INDUSTRY DAY SCHEDULING:

The Government is finalizing preparations for the upcoming Industry Day. As part of this process, please update your RSVP to state whether or not you are interested in participating in a one-on-one afternoon session. This information is required for scheduling purposes. 

------------------------------------------------------------------

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #25 ·

10 March 2026

The Government wants to notify offerors that the KC-135 Center Console Refresh (CCR) Revision 2 program has uploaded the Excel Pricing Workbooks for both Prime and Subcontractor, and has updated the draft solicitation, including revisions to Section L and Section M.

Specifically:

  • Draft Solicitation: New CDRLs have been added to CLINs X0001, X0001AA, X0001AF and X0020; additionally, the proposal response due date has been updated to 31 July 2026.
  • Section L: Paragraph 3.8.2 has been updated, and section 7.0 pricing has been added.
  • Section M: Section 2.5 Pricing has been added.

All updated attachments have been uploaded and are available in the "Attachments/Links" section. No additional attachments are anticipated at this time. 

See attachments:

"DRAFT Solicitation - FA810526RB001"

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award"

"ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME"

"ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB"

------------------------------------------------------------------

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #24 ·

03 March 2026

The DRAFT Statement of Work (SOW) and System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW)"

"Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #23 ·

27 February 2026

The DRAFT Section L and Section M for the KC-135 Center Console Refresh (CCR) Revision 2 program have been uploaded.

See attachments:

"Attachment 4 - DRAFT CCR Section L - Instructions to Offerors"

"Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb"

------------------------------------------------------------------

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #22 ·

18 February 2026

Eighteen Technical Orders (TOs) have been uploaded. Additional documents may be posted as they become available. 

------------------------------------------------------------------

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #21 ·

17 February 2026

Updated non-CUI schedule for Industry:

CCR plans to release Draft RFP – end of month February 2026 followed by an Industry Day in March 2026. 

Full RFP release is currently expected May 2026.

------------------------------------------------------------------

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #20 ·

05 February 2026

Added document "(CUI) KC-135 SCG Final Oct 2022"

------------------------------------------------------------------

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #19 ·

13 January 2026

CCR Response to Industry Questions

The Goverment is providing answers to the SRD and SOW questions submitted by industry. These documents will be updated with additional questions and responses upon completion.

See attachments:

"(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26"

"(CUI) FA8105_CCR_Rev2 RFI's SRD Responses"

"(CUI) FA8105_CCR_Rev2 RFI's SOW Responses"

------------------------------------------------------------------

17 December 2025

CCR Virtual Industry Day -2 April 2025: Charts for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #18 ·

17 December 2025

CCR Virtual Industry Day -2 April 2025: Chats for Industry

The Goverment is providing the charts presented during the Virtual Industry Day held on April 2, 2025.

See attachments:

"(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25"

"(CUI)  CCR Industry Day"

------------------------------------------------------------------

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #17 ·

5 December 2025

REQUEST FOR INFORMATION (RFI) 3

The Goverment is seeking industry input concerning contract type and standard compliance.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3" for details. 

------------------------------------------------------------------

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #16 ·

21 November 2025

The DRAFT Statement of Work (SOW) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachment "CUI Draft SOW KC-135 CCR Rev 2" for details. 

------------------------------------------------------------------

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #15 ·

19 November 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 19 Nov 25" for details. 

------------------------------------------------------------------

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #14 ·

14 November 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo 14Nov25"

"(CUI) DRAFT KC-135 CCR Revision 2 SRD"

------------------------------------------------------------------

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #13 ·

29 September 2025

Deleted attachments "(CUI) DRAFT KC-135 CCR SRD" and "(CUI) Draft SRD KC-135 CCR Memo Signed" for review.

Please continue to review the KC-135 Center Console Refresh (CCR) Revision 2 program notices for updates.

-------------------------------------------------------------------

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #12 ·

26 September 2025

The DRAFT System Requirements Document (SRD) for the KC-135 Center Console Refresh (CCR) Revision 2 program has been uploaded, along with an accompanying memo outlining the process for submitting questions and comments. The memo includes the submission deadline and contact information for directing all questions and comments.

See attachments:

"(CUI) Draft SRD KC-135 CCR Memo Signed"

"(CUI) DRAFT KC-135 CCR SRD"

-------------------------------------------------------------------

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #11 ·

28 August 2025

An update has been added for the Center Console Refresh Revision 2 effort. 

See attachment "(CUI) Update KC-135 CCR 28 Aug 25" for details. 

-------------------------------------------------------------------

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #10 ·

8 August 2025

Replaced attachment "OMG SysML Ver 1.6 " with updated version "OMG SysML Ver 1.7".

Updated PCO from Russell Watson to Brandi Shelden.

-------------------------------------------------------------------

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #9 ·

18 July 2025

Deleted attachment "(CUI) KC-135 CCR Revision System Requirements Document (SRD) (February 5, 2023)".  

The SRD posted in the Bidder’s Library on 15 July 2025 was uploaded by mistake. A revised SRD with updated requirements reflected in the latest RFI is currently in coordination. A draft version will be provided in the next 30 days.

-------------------------------------------------------------------

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #8 ·

15 July 2025

Partial Bidder's Library uploaded to give Industry access to data.  Additional documents will be uploaded as they become available.   No responses are requested at this time.

----------------------------------------------------------------------

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #7 ·

2 July 2025

REQUEST FOR INFORMATION (RFI) 2

The Goverment is seeking additional information concerning incentives and CPIF type contract.

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2" for details. 

------------------------------------------------------------------------

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #6 ·

6 June 2025

Added additional Q&A from 2 April 2025 virtual Industry Day.

Attached "(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025"

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #5 ·

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

Added a PDF version of the Q&A due to issues with opening the Word version.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #4 ·

14 April 2025

Added Q&A from 2 April 2025 virtual Industry Day.

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #3 ·

07 March 2025

KC-135 Center Console Refresh (CCR) Revision 2 Virtual Industry Day will be held Wednesday, 2 April 2025, from 0900-10000 on TEAMS.  This will include a presentation and Q&A session followed by one-on-one sessions.  

One-on-One Session Schedule:

1000-1100

1100-1200

1300-1400

1400-1500

1500-1600

If attending, please email company name, phone number, and the names of those attending to Alejandra Marchesano at alejandra.marchesano@us.af.mil for meeting invite(s).  Please indicate if you would like a one-on-one session and your desired meeting time (times will be assigned based on the order in which they are received). A current DD2345 must be on file to receive a meeting invite.

All questions asked during this Industry Day, along with a Government response, will be posted to SAM.gov.

The Government requests that only non‐proprietary information be submitted in response to this Virtual Industry Day.

------------------------------------------------------------------------------------------------

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #2 ·

21 February 2025

Updated RFI to extend response date to 24 March 2025 from 3 March 2025.

 

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Update #1 ·

REQUEST FOR INFORMATION (RFI)

This is an RFI for market research purposes issued by the C/KC‐ 135 Contracting Branch, AFLCMC/WLT at Tinker Air Force Base (TAFB).   

See attachment "(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1" for details. 

To request access to view controlled documents via sam.gov. You must have a role assigned in sam.gov. This is not something Government personnel can assist you with. If you are unable to view the controlled documents, you will need to contact sam.gov for questions. After you have a role assigned in sam.gov, request to view the documents and ensure you put your company’s cage code in the request. If you do not provide the cage code, this will delay your request for access. Access will be granted to the controlled documents if an active DD2345 is on file for your company via the JCP website, https://www.dla.mil/Logistics-Operations/Services/JCP/. If a DD2345 is not found or is inactive, this will need to be updated and active before access will be granted to view controlled documents.

Files

File Type Posted
Draft Solicitation - FA810526RB001 21 May 26.pdf PDF
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf PDF
Draft Solicitation - FA810526RB001 21 May 26 (1).pdf PDF
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx XLSX spreadsheet
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx XLSX spreadsheet
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf PDF
DRAFT Solicitation - FA810526RB001.pdf PDF
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf PDF
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx XLSX spreadsheet
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx XLSX spreadsheet
KC-135 CCR Industry Day Flyer.pdf PDF
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf PDF
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf PDF
MEMO Draft Solicitation FA810526RB001.pdf PDF
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf PDF
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf PDF
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf PDF
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf PDF
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf PDF
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf PDF
Show all 21

Notice history

Notice Type Posted
KC-135 Center Console Refresh (CCR) Revision 2 Latest solicitation Solicitation
KC-135 Center Console Refresh (CCR) Revision 2 Pre-Solicitation
KC-135 Center Console Refresh (CCR) Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
B-52J CERP Production Modification Kits & ICS Tinker AFB, Oklahoma 73145, United States · NAICS 336411 AFLCMC Tinker AFB No set-aside
REQUEST FOR INFORMATION (RFI) KC-46 SW Integration Sustainment & Support (K-SWISS) Wright Patterson AFB, Ohio, United States · NAICS 336413 AFLCMC Wright Patterson AFB No set-aside
Remanufacture of KC-135 Gearbox Assembly, NSN 1680007986073FL Tinker AFB, Oklahoma, United States · NAICS 336413 Air Force Sustainment Center Total Small Business
DISPLAY UNIT, FLIGHT_End_Item_KC-46_NSN_6610016535172KT _PN_187286-001 NAICS 336413 Aviation No set-aside
PROCESSOR, COMMUNICA_End_Item_KC-46_NSN_6610016556120KT_PN_9D-84532-1 NAICS 336413 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity