This document outlines a market survey for a KC-135 Aero-I Satellite Communications replacement program. The Air Force is seeking potential sources to provide an Iridium SATCOM system to replace the aging INMARSAT system currently used on 400 C/KC-135 aircraft. Interested parties were asked to provide information on their capabilities by April 30th, including experience with hardware production, software development, repair services, and commercial offerings. The Air Force also announced an Industry Day on May 8th for interested vendors to receive more information and have individual briefing sessions. Responses to the market survey and any questions for the Industry Day are due by April 25th.

Draft Statement of Work for Aero-I

View the file

Other files for this federal contract opportunity

Other files attached to KC-135 Aero-I SATCOM Replacement, newest first.
File Type Posted
UPDATED_5-_Vendor_Questions_and_Government_Responses_04_Nov_19.pdf PDF
UPDATED_4-_Vendor_Questions_and_Government_Responses_29_Oct_19.pdf PDF
UPDATED_3-_Vendor_Questions_and_Government_Responses_10_Oct_19.pdf PDF
UPDATED_2-_Vendor_Questions_and_Government_Response_30_SEP_19.pdf PDF
UPDATED-Vendor_Questions_and_Government_Responses_26_SEP_19.pdf PDF
ATTACHMENT_2_Section_M_EVALUATION_FACTORS_REV_A.pdf PDF
APPENDIX_A_SOW_REV_A.pdf PDF
ATTACHMENT_3_PRICING_MATRIX_REV_A.xlsx XLSX spreadsheet
FA810519R0005_______0001.pdf PDF
Vendor_Questions_and_Government_Responses_10_SEP_19.pdf PDF
APPENDIX_C_CSDR_Plan.pdf PDF
APPENDIX_B_SRD.pdf PDF
EXHIBIT_A_CDRLs.pdf PDF
ATTACHMENT_3_PRICING_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_2_Section_M_EVALUATION_FACTORS.pdf PDF
APPENDIX_C_CSDR__DD2794_Attachment.xlsx XLSX spreadsheet
EXHIBIT_A_CDRLs.zip ZIP file
FA810519R0005.pdf PDF
ATTACHMENT_1_Section_L_Instructions_to_Offerors.pdf PDF
APPENDIX_A_SOW.pdf PDF
EXHIBIT_A_DIDs.pdf PDF
AERO-I_Additional_Questions_and_Responses.pdf PDF
Synopsis_-_Aero-I.pdf PDF
Aero-I_Pre-Solicitation_Attendee_List-_16_May_2019.pdf PDF
Pre-Solicitation_Q&A's_(Round_2).pdf PDF
ppi_tool.accdb MDB file
Pre-Solicitation_Questions_-_Post_to_FBO_(Updated).pdf PDF
Pre_Solicitation_Conf_-_Aero-I_DRAFT_-_FINAL.pdf PDF
FA810519R0005V19.pdf PDF
Section_M.pdf PDF
SRD.pdf PDF
Section_L_Pricing.xlsx XLSX spreadsheet
CDRLs.pdf PDF
KC135_AERO_I_Contract_CSDR_Plan.xls XLS spreadsheet
Registration_Form.docx DOCX document
Section_L.pdf PDF
AERO-I_Industry_Day_Slides.pdf PDF
AERO-I_Replacment_Industry_Day_Registration_Form.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work - AERO-I SATCOM Replacement (DRAFT)

Statement of Work for

C/KC-135 Aero-I Satellite Communications (SATCOM)

Replacement Program

Permanent Modification for the

C/KC-135

Preparation Date: 10 April 2019

Purchase Request No.: FD2030-20-30019

PREPARING ORGANIZATION: AFLCMC/WKDM TINKER AFB OK 73145

CHANGE HISTORY

Revision Explanation Date

Original 30 April 2019

Table of Contents 1 Scope

Background

2 Applicable Documents Department of Defense (DoD) Specifications

Department of Defense Standards

Industry Publications

3 Requirements Group A and B Kits

Open Skies Aircraft

Foreign Military Sales (FMS) Participation

Aircraft Integration and Installation Strategy

Software Integration

Contract Data Requirements List (CDRL)

Cost and Software Data Reporting (CSDR)

Program Management

Conferences and Reviews

3.9.1 Post Award Conference (PAC)

3.9.2 Technical Order (TO) Guidance Conference

3.9.3 Program Management Reviews (PMR)

Technical Requirements/Reviews

3.10.1 Systems Requirement Review (SRR)

3.10.2 Integrated Test Team (ITT)

3.10.3 Cybersecurity Technical Interchange Meeting (TIM)

Integration

3.11.1 Preliminary Design Review (PDR)

3.11.2 Critical Design Review (CDR)

3.11.3 TO In-Process Reviews (IPR)

3.11.4 Environmental Test Reports

Configuration Management (CM)

3.12.1 Engineering Change Proposals (ECP)

Over and Above – Labor

Over and Above – Material

4 Test Software Integration Lab (SIL) Testing

Functional Configuration Audit/System Verification Review (FCA/SVR)

Test Readiness Review (TRR)

Developmental Test (DT) and Operational Test (OT)

4.4.1 Test Plan

TO Verification/Certification

Test Close Out

5 Production Identification Marking Requirements

Item Unique Identification (IUID) Requirements

Estimated Production and Delivery

Physical Configuration Audit (PCA)

Packaging and Handling

Warranty

6 Installation CFT Installation

6.1.1 Disposition Instructions

6.1.2 Verification of Installation

6.1.3 Travel

PDM Installation

Government Furnished Information

7 Contract Closeout

1 Scope

This Statement of Work (SOW) defines the work to be performed by the contractor to identify, develop, integrate, and test a Commercial Off-the-Shelf (COTS) Iridium

SATCOM system to replace the current C/KC-135 INMARSAT satellite system. The

SATCOM replacement must be compatible with both Block 40 and Block 45 aircraft.

Work will include integration of the COTS satellite communication system in Collins

Aerospace’s Software Integration Facility (SIL) in Cedar Rapids Iowa, support of aircraft testing, production of Group A and Group B kits (including spares), as well as Contractor

Field Team (CFT) installation of the SATCOM replacement on aircraft. The contractor shall also produce a comprehensive engineering package to support Programmed Depot

Maintenance (PDM) installation of the satellite system.

Background

The C/KC-135 currently utilizes the International Marine/Maritime Satellite

(INMARSAT) organization’s Aeronautical Intermediate (Aero-I) service as part of its

Global Air Traffic Management (GATM) system. Aero-I provides oceanic

Controller/Pilot Data Link Communications (CPDLC) to Air Traffic Control (ATC) and

Aircraft Communications Addressing\Reporting System (ACARS) beyond line-of-sight

(BLOS) messages to 618 Tanker Airlift Control Center (TACC) Global Decision Support

System. The SRT-2000 Satellite Communications (SATCOM) Transceiver Part Number

(P/N) 822-1346-001 and IGA-2000 SATCOM Antenna P/N: 822-1369-001 are installed on the aircraft and provides the required communications path. Both of these items are becoming increasingly unsupportable causing increasing maintenance and Mission

Impaired Capability Awaiting Parts (MICAP) hours. In addition, INMARSAT has announced that their Aero-I service will be discontinued as of December 31, 2022.

Various independent government cost estimates have determined that a solution set utilizing Iridium SATCOM service provides significant lifecycle cost savings and would be preferred over an INMARSAT SATCOM based solution set.

2 Applicable Documents

The following documents are applicable to this Statement of Work.

Department of Defense (DoD) Specifications

Unless otherwise indicated, copies of specifications, standards and handbooks listed below are available from the Standardization Document Order Desk, 700 Robbins Ave, Bldg 4D, Philadelphia PA 19111-5094.

Department of Defense Standards

DoD 5000.04-M-1 Cost and Software Data Report (CSDR)

Manual

MIL-HDBK-61A Configuration Management Guidance

MIL-HDBK-516C Airworthiness Certification Criteria

MIL-STD-129P Military Marking for Shipping and Storage

MIL-STD-130N DOD Standard Practice Identification

Marking of U.S. Military Property

MIL-STD-881D Standard Practice for Work Breakdown

Structures for Defense Material Items

MIL-STD-882E System Safety

MIL-STD-2073-1D Standard Practice for Military Packaging

Industry Publications

ARP4761 Guidelines and Methods for Conducting the Safety Assessment Process on Civil

Airborne Systems and Equipment

ASTM-D-3951 Commercial Packaging

RTCA DO 160G Environmental Conditions and Test

Procedures for Airborne Equipment

SAE AS50881 Wiring Aerospace Vehicle

SAE AS-9132 Data Matrix Quality Requirements for

Parts Marking

NIST Special Publication 800-171r1 Protecting Controlled Unclassified

Information in Nonfederal systems and

Organizations

3 Requirements

The contractor shall accomplish the integration, test, procurement and installation of an

Iridium SATCOM replacement system for Block 40 and Block 45 C/KC-135s. The contractor shall meet the requirements detailed in the C/KC-135 Aero-I SATCOM

Replacement Program System Requirements Document (SRD). The contractor shall provide a first article for one (1) Block 40 and one (1) Block 45 aircraft. The contractor shall include small business participation of at least 8% of the total proposal price.

Group A and B Kits

The government defines a Group A kit as consisting of cables, wiring harness and associated hardware. The government defines a Group B kit as consisting of a transceiver and antenna.

Open Skies Aircraft

The contractor shall integrate the proposed solution on the two (2) Open Skies OC-135 aircraft.

Foreign Military Sales (FMS) Participation

The contractor shall plan to integrate the proposed solution on up to 17 aircraft in support of the following FMS customers:

Country # of Aircraft Configuration Software Version

Turkey 7 Block 40 40.6.3

France 3 Block 40 40.6.3

Chile 3 Block 30 30.4

Singapore 4 Block 30 30.4

Note that Turkey will begin transition to software version 45.1.1 in calendar year 2021.

FMS participation in the program has not yet been determined.

Aircraft Integration and Installation Strategy

The contractor shall integrate the transceiver and antenna placement and provide placement reasoning at the Preliminary Design Review (PDR). The contractor’s strategy shall include field install, structural, electrical, and spectrum impacts on antenna placement. The contractor shall include utilization of Contractor Field Teams (CFT) and

Programmed Depot Maintenance (PDM) when building the installation schedule. The government intent is to utilize the maximum number of PDM for organic installation during years 3-5 of the contract, which equates to 75 aircraft per year for a total of 225 aircraft. The government intent is the remaining 134 installations shall occur via CFT.

Foreign Military Sales (FMS) applicability is in addition to these installation amounts.

Software Integration

As the sole source avionics integrator for the C/KC-135, the contractor shall coordinate with Collins Aerospace for software integration and SIL testing. The contractor shall;

a) Provide four (4) SATCOM transceivers and one (1) antenna to the Collins

Aerospace Software Integration Laboratory at Cedar Rapids no later than PDR.

b) Design and deliver the SIL specific hardware needed to install transceivers and antenna in the SIL

c) Modify 4 test lines at Collin Aerospace’s SIL (two (2) Block 40 and two (2)

Block 45) to enable over-the-air transmission testing to the Communication, Navigation, and Surveillance/ Air Traffic Management (CNS/ATM) and TACC

d) Tailor CNS/ATM matrices for Iridium satellite communications, and ensure KC-

135 CNS/ATM recertification

e) The contractor shall integrate Iridium SATCOM capabilities into the Block 40 and Block 45 C/KC-135 aircraft and produce a fieldable Operational Flight

Program (OFP) release for each aircraft block.

Once installed, all delivered hardware shall remain in the SIL as government property.

Contract Data Requirements List (CDRL)

A list of data requirements contained in this SOW can be found in Table 1 and each SOW paragraph references specific data requirements at the end of each applicable paragraph.

The contractor shall upload all CDRL deliverables into Lifecycle Management Program

(LCMP). The government shall provide access to LCMP not later than ten (10) business days after contract award. All CDRLs shall be delivered in accordance with the DD

Form 1423s. CDRL deliverables referenced as “Draft” will be considered a 100% draft meaning that all applicable information the contractor has at the time the data requirement is to be delivered is included in the document. The contractor shall deliver a

Data Accession List (DAL) monthly. (A038)

Table 1. Contract Data Requirements List

A001 Conference Agenda

A002 Presentation Materials

A003 Conference Minutes

A004 Integrated Program Management Plan

A005 Technical Manual Contractor Requirements

A006 Commercial Drawings/Models and Associated Lists

A007 System Security Management Plan

A008 Level 1 System Specification

A009 Level 2 System Review Documents

A010 Level 3 System Test Description

A011 Systems Engineering Management Plan

A012 Aircraft Test Cards

A013 Integrated Test Management Plan

A014 Interface Control Document

A015 System Requirements Verification Matrix

A016 Modified Airworthiness Certification Criteria

A017 Human Engineering Design Approach Document - Operator

A018 Contractor’s Risk Management Plan

A019 A-Kit Engineering Drawings

A020 CNS/ATM Certification Matrices

A021 Safety Assessment Report

A022 System Safety Hazard Analysis Report

A023 Aircraft Test Plan

A024 Contract Summary Report

A025 Software Test Report

A026 Management Plan

A027 Architectural Analysis Report

A028 Cybersecurity Assessment Test Plan

A029 Cybersecurity Assessment Test Report

A030 Configuration Audit Plan

A031 Item Unique Identification Marking Plan

A032 Item Unique Identification Marking Activity, Validation & Verification

A033 Engineering Change Proposal

A034 Software Version Description

A035 Installation Completion Notification

A036 Configuration Audit Summary Report and Certification

A037 Engineering Change Proposal System Safety Report

A038 Data Accession List

A039 Cost Data Summary Report

A040 Functional Cost-Hour Report

A041 Progress Curve Report

A042 Contractor Business Data Report

A043 Contract Work Breakdown Structure

Cost and Software Data Reporting (CSDR)

The contractor shall systematically collect and report actual contract costs to provide

DoD cost analysts with data necessary to estimate the costs of ongoing and future government programs. CSDRs shall be prepared in accordance with the instructions contained in the most recently approved versions of the data item descriptions (DIDs), DI-FNCL-81565C, DI-FNCL-81566C, DI-FNCL-81567C, DI-FNCL-81765B, and DI-

MGMT-81334D, as applicable. (A039, A040, A041, A042, A043)

In the performance of this contract, the contractor shall use:

a. A documented standard CSDR process that satisfies the guidelines contained in the DoD 5000.04–M–1 (CSDR Manual), and the DIDs;

b. Management procedures that provide for generation of timely and reliable information for the contractor cost data reports (CCDRs) and software resources data reports (SRDRs) required by the CCDR and SRDR data items of this contract;

c. The most recently Government-approved CSDR plan for this contract, DD Form

2794, and the most recently approved CSDR DIDs; and

d. The contractor shall require and flow down the requirement for CSDR reporting from subcontractors at any tier with a subcontract that exceeds $50 million or any subcontracts valued between $20 million and $49 million that are designated by the government as being high risk, high value, or high technical interest. If, for subcontracts that exceed $20 million, the contractor changes subcontractors or makes new subcontract awards, the contractor shall notify the government.

Program Management

The contractor shall designate a single point of contact (SPOC) for all tasks required for the program. The contractor SPOC shall have responsibility and authority for the control and coordination of all contractor work performed under this SOW. The contractor shall also submit a management plan describing the contractor’s organization, assignment of functions, duties, and responsibilities, management procedures and policies, and reporting requirements for the conduct of contractually-imposed tasks, projects, or programs. (A026)

Conferences and Reviews

The contractor shall provide necessary support for Program Management Reviews

(PMR), Technical Interchange Meetings (TIM), Technical Reviews, and Conferences.

The contractor shall provide agendas, presentation material, and minutes of these meetings. The contractor shall host government reviews as described below. The contractor shall host reviews at the contractor or sub-contractor facilities. The contractor shall ensure agenda items include, but not limited to, contract status and updates as it relates to cost, schedule, and performance. (A001, A002, A003)

3.9.1 Post Award Conference (PAC)

The contractor shall conduct a PAC not later than 45 calendar days after contract award.

The PAC shall include a discussion of the contractor and applicable subcontractors’ standard cost and software data reporting (CSDR) processes that satisfy the guidelines contained in the DoD 5000.04-M-1 (CSDR Manual), and the requirements in the government-approved CSDR plan for the contract, DD Form 2794, and related Resource

Distribution Table (RDT). At this conference, the contractor shall provide a baseline program schedule. The contractor agenda shall address and provide details to their understanding of the contract requirements and interpretation of the CDRLs at Table 1.

(A001, A002, A003, A004, A026)

3.9.2 Technical Order (TO) Guidance Conference

The contractor shall, along with the C/KC-135 Technical Order Management Agency

(TOMA), co-host a TO guidance conference for this effort to be held in conjunction with the PAC. The contractor shall provide a briefing on their interpretation of the basic contract, Military Specifications (MIL-SPEC), Military Standards (MIL-STD), and the planned preparation and delivery of the TOs and related data. (A001, A002, A003, A005)

3.9.3 Program Management Reviews (PMR)

The contractor shall provide PMRs by teleconference or in combination with another scheduled meeting/review to capture program status. The PMRs shall occur quarterly until the first CFT installation has been evaluated and accepted. (A001, A002, A003)

Technical Requirements/Reviews

3.10.1 Systems Requirement Review (SRR)

The contractor shall conduct an SRR. All documents need to be provided not later than the date specified in the CDRL. (A001, A002, A003)

Entry Criteria:

a. Technical Manual Contract Requirements (TMCR) (Initial) (A005)

b. System Security Management Plan (Draft) (A007)

Contains the data content, format, and intended use of the Contractor's system security plan (or extracts thereof), to include any associated plans of action, addressing the Contractor’s internal unclassified information system(s).

c. Level 1 Systems Specification (SS) (Draft) (A008)

The SS specifies the requirements for a system or subsystem and the methods to be used to ensure that each requirement has been met.

d. Systems Engineering Management Plan (SEMP) (Final) (A011)

e. Provide Risk Management Plan (Final) (A018)

The contractor's Risk Management Plan will be used to monitor management and schedule of the contract efforts relative to a system and equipment. This information shall provide the government with risk data for all risks associated with the system/equipment.

3.10.2 Integrated Test Team (ITT)

The contractor shall support at least three (3) ITT meetings by teleconference to coordinate actions as necessary to complete Iridium SATCOM system test activities in accordance with contract schedule. Meeting frequency as determined at PAC. (A001, A002, A003)

3.10.3 Cybersecurity Technical Interchange Meeting (TIM)

The contractor shall support development of cybersecurity draft information covering the

SATCOM replacement system to assist in updating platform security documents. The contractor shall provide quarterly government-led cybersecurity TIMs support to the KC-

135 Information System Security Manager (ISSM). The contractor shall provide status updates of all cybersecurity deliverables. (A001, A002, A003)

Integration

3.11.1 Preliminary Design Review (PDR)

The contractor shall conduct a PDR. This System Engineering milestone review shall have entry and exit criteria, based on the C/KC-135 Legacy Tanker System Engineering

Plan (SEP)/SEMP as defined during the PAC requirements review. Successful completion of PDR will be defined by government concurrence with the proposed technical solution, as well as government approval of all supplied CDRLs. The contractor shall provide all documents not later than the date specified in the CDRL. (A001, A002, A003)

Entry Criteria:

a. Certification and Verification (Cert/Ver) approach for TCTO and all TOs (A005)

b. Technical Manual Schedule and Status (TMSS) (Initial) (A005)

c. Provide Commercial Drawings/Models and Associated Lists. (Final) (A006)

Commercial Drawings/Models and Associated Lists define commercial items acquired by the Department of Defense.

d. Level 1 SS (Final) (A008)

e. Level 2 SRD (Draft) (A009)

The SRD specifies the requirements for a system or subsystem and the methods to be used to ensure that each requirement has been met.

f. System Security Management Plan (Final) (A011)

g. Integrated Test Management Plan (Draft) (A013)

The ITMP presents a general outline for a total test for a system for the testing and evaluation conducted during development, and coordinates the engineer and service tests.

h. Interface Control Document (ICD) (Draft) (A014)

The Interface Control Document (ICD) provides a record of all interface information (such as drawings, diagrams, tables, and textual information) generated for the project

i. System Requirements Verification Matrix (Draft) (A015)

The Specification Requirement Verification Matrix provides traceability between the Test Requirements Document (TRD) or procedure (similarity analysis or inspection test methods) and the Prime Item Development Specification (PIDS) requirements.

j. Military Airworthiness Certification Criteria (MACC) (A016)

The contractor shall develop a Modification Airworthiness Certification Criteria

(MACC) as defined in MIL-HDBK-516C for the C/KC-135 Iridium SATCOM system and identify the C/KC-135 Airworthiness Certification Criteria for applicability to this effort. The contractor shall evaluate airworthiness risks for the applicable criteria and determine if the refreshed SATCOM system is reportable or non-reportable.

k. Human Engineering Design Approach Document – Operator (HEDAD-O) (Draft)

(A017)

The Human Engineering Design Approach Document–Operator (HEDAD-O) describes equipment that interfaces with operators. This document provides a source of data to evaluate the extent to which equipment having an interface with operators meets human performance requirements and human engineering criteria, and provides the human engineering rationale for the design.

l. Risk Management Updates (A018)

m. System Safety Hazard Analysis (SSHA) (Final) (A022)

The contractor shall perform activities in accordance with MIL-STD-882E or

ARP 4761 and shall generate a System Safety Hazard Analysis (SSHA) to identify any hazards associated with the project.

n. Architectural Analysis Report (Final) (A027)

o. Cybersecurity Assessment Test Plan (Final) (A028)

p. Cybersecurity Assessment Test Report (Final) (A029)

3.11.2 Critical Design Review (CDR)

The contractor shall conduct a Critical Design Review (CDR). This System Engineering milestone reviews shall have entry and exit criteria based on the SEP/SEMP as defined during the PAC requirements review. The contractor shall provide all documents not later than the date specified in the CDRL. (A001, A002, A003)

Entry Criteria:

a. Field/Depot Installation/Removal plan shall include strategy for the removal of the legacy systems (TCTO) (Draft) (A005)

b. Temporary Modification (T2) Plan (Draft) (A005)

c. Cert/Ver approach for TCTO and all TOs (Update) (A005)

d. Level 2 SRD (Final) (A009)

e. Level 3 STD (Draft) (A010)

f. Integrated Test Management Plan (Final) (A013)

g. Interface Control Document (Final) (A014)

h. System Requirements Verification Matrix (Final) (A015)

i. MACC (A016)

j. Human Engineering Design Approach Document – Operator (HEDAD-O) (Draft)

(A017)

k. Risk Management Updates (A018)

l. A-kit Technical Data Package (Draft) (A019)

Technical Data Package contains a technical description of an item suitable for use as the basis for future competitive acquisition, production, installation, modification, engineering support, maintenance and logistics support of military material developed by of for the Department of Defense.

m. CNS/ATM Matrices (Draft) (A020)

n. Safety Assessment Report (SAR) (Final) (A021)

The Safety Assessment Report (SAR) is a comprehensive evaluation of the safety risks being assumed prior to test or operation of the system or at contract completion. The SAR shall identify all safety features of the system, design, and procedural hazards that may be present in the system being acquired, and specific procedural controls and precautions that should be followed.

3.11.3 TO In-Process Reviews (IPR)

The contractor shall host 75%, 90%, and 100% TO in-process reviews as defined in the

Technical Manual Contractor Requirements (TMCR). (A005)

3.11.4 Environmental Test Reports

The contractor shall provide the government with the SATCOM manufacturer’s DO-

160G test report as tailored in the SRD for the transceiver and antenna. (A006)

Configuration Management (CM)

The contractor shall implement CM processes to control all aspects of the SATCOM replacement effort, to include but not be limited to all Hardware Configuration Items

(HWCI), Computer Software Configuration Items (CSCI), Firmware Configuration Items

(FWCI), and Line Replaceable Units (LRU) documentation and processes, IAW ANSI/EIA

649B and the MIL-HDBK-61A. The CM process shall include specific processes for identification of changes which may instigate engineering change proposals or deviations from designs and architectures presented to or reviewed by the government. The contractor shall integrate and execute a multiple configuration baseline management approach in the software development process and system engineering approach to support parallel Block 40 and 45 efforts.

3.12.1 Engineering Change Proposals (ECP)

Any change which affects the form, fit function, cost or schedule requirements of the system (Class 1 or major change), shall be prepared as an ECP, and the contractor shall submit ECPs to the government for approval. The contractor shall follow guidance per

ANSI/EIA 649B and MIL-HDBK-61A for any necessary ECPs. Class II or Minor changes prepared as ECPs do not require government approval but shall be presented to the government for concurrence of change class designation, i.e. Class I or Class II change. The contractor shall submit ECP System Safety Report (ECPSSR) as required.

(A033, A037)

Over and Above – Labor

The contractor shall submit over and above work requests and proposals to the

Contracting Officer (CO) and Contracting Officer Representative (COR). The contractor shall not begin work until authorized by the CO in writing.

Over and Above – Material

The contractor shall submit over and above work requests and proposals to the

Contracting Officer (CO) and Contracting Officer Representative (COR). The contractor shall not begin work until authorized by the CO in writing.

4 Test

Software Integration Lab (SIL) Testing

The contractor shall:

a. Use OFP 40.6.3 and OFP 45.1.1 as the baseline for software integration with the goal of delivering a Black Label software release, along with an applicable

Software Version Description (SVD) document, to the government. (A034)

b. Perform testing of the integrated software changes in the SIL

c. Coordinate with the government on deficiencies encountered during testing, correct deficiencies and perform any required regression testing.

d. Verify Iridium SATCOM system performance and CNS/ATM compliance via

Over the Air testing in the SIL

e. Provide a SIL system test report to the government. (A025)

Functional Configuration Audit/System Verification Review (FCA/SVR)

The C/KC-135 Program Office (PO) will conduct and the contractor shall support a

Functional Configuration Audit/System Verification Review (FCA/SVR) at contractor’s/subcontractor’s site, prior to Test Readiness Review, to verify the system’s performance and compliance with the requirements and the government CDR specification. The PO will notify the contractor of scheduled FCA/SVR no later than thirty (30) calendar days prior to allow adequate time to prepare travel plans. At the conclusion of the FCA/SVR, the contractor shall provide a Configuration Audit Summary

Report. (A036)

Test Readiness Review (TRR)

The contractor shall conduct a Test Readiness Review (TRR) to demonstrate system maturity, results of SIL testing, and provide first article aircraft readiness. The following shall be delivered not later than 30 calendar days prior to the TRR unless otherwise noted. (A001, A002, A003)

a. T2 Installation/Removal Instructions (100% Draft) (A005)

b. Installation/Removal Instructions (TCTO) (100% Draft) (A005)

c. Post Installation/Removal Checkout Instructions (Final) (A005)

d. Level 3 STD (Final) (A010)

e. Aircraft Test Cards (Final) (A012)

f. SAR (Final) (A021)

g. Aircraft Test Plan (ATP) (A023)

h. System Test Report (SIL portion only) (A025)

Developmental Test (DT) and Operational Test (OT)

The contractor shall:

a. Install one Group A and Group B kit onto a Block 45 KC-135 aircraft, and one

Group A and Group B kit onto a Block 40 KC-135 aircraft

b. Support final verification of Test Cards with Lead Developmental Test

Organization (LDTO) prior to DT&OT

c. Perform DT, on USAF supplied Block 40 and Block 45 aircraft at a designated

USAF site

d. If determined at PDR, remove all installed Group B kits, from the aircraft, after the completion of DT&OT

Provide engineering support to OT The contractor shall analyze test deficiencies, present analysis to government for coordination and correct coordinated deficiencies.

For planning purposes, the test is planned to occur at Scott Air Force Base, Illinois, but subject to change to another location within the Continental United States. The test dates will be provided to the contractor after the Test Readiness Review.

4.4.1 Test Plan

The contractor shall deliver draft and final Developmental Test & Evaluation (DT&E)

Aircraft Test Plan and Test Cards for both C/KC-135 Block 40 and Block 45 aircraft configurations. (A012, A013, A023)

TO Verification/Certification

The contractor shall support the Air Force verification of all Group A kit drawings, Group A and Group B kit installation drawings, Group A and Group B kits, TO Source

Data, and TCTOs at the completion of aircraft test. The contractor shall assist with verification by identifying assets required to accomplish the efforts and provide a technical writer and engineering support for each verification. The contractor shall incorporate approved verification comments. (A005)

Test Close Out

The contractor shall provide aircraft test results and final copies of all technical data

(engineering drawings, installation drawings, wire routing drawings, technical orders and the TCTO) before the beginning of PDM and CFT installs. (A025)

5 Production

Identification Marking Requirements

The contractor shall mark all items IAW MIL-STD-130N.

Item Unique Identification (IUID) Requirements

The contractor shall provide a IUID Marking Plan and a IUID Verification Report.

(A031, A032)

Estimated Production and Delivery

The contractor shall provide Group A kits and Group B kits to the government in accordance with the contract schedule and delivery orders. The contractor shall provide details of how they will meet the installation schedule via an Integrated Master Schedule.

(A004)

The purchase quantity per contract year for the US and FMS is subject to change based on funding authorizations. The FMS funding is dependent upon the timing of when FMS countries sign and return an International Program Directive (IPD) to the KC-135 FMS

International Acquisition Program Office to allow case execution. The FMS funding dates are not currently defined.

Physical Configuration Audit (PCA)

The government will conduct, with contractor participation, a 100% configuration audit of the two (2) Group A kits to be installed as part of the first article delivery to verify the actual configuration meets the provided drawing and technical data package specifications. The contractor shall provide a Configuration Audit Plan when ready for

PCA. The contractor shall host the PCA at the contractor’s facility and will be operated

IAW MIL-HDBK-61A. The contractor shall ensure that the PCA audits result in wiring, cables, and cable bundles pass continuity checks IAW SAE AS50881. (A030)

Packaging and Handling

The contractor shall package the Group A kits and Group B kits marked for Programmed

Deport Maintenance (PDM) installations in accordance with ASTM-D-3951, Commercial Packaging or MIL-STD-2073-1D, the Standard Practice for Military

Packaging. The contractor shall mark the packages for shipping and storage in accordance with MIL-STD-129P, Military Marking for Shipment and Storage, and ship them as cited on the individual order.

The contractor shall provide via email commercial shipping documentation or provide shipping information on a DD Form 1149, Requisition and Invoice/Shipping Document for each production kit shipment as identified on each individual order. The USAF and the FMS Point of Contact (POC) will be identified and provided to the vendor on each individual order. All shipments will be CONUS.

Warranty

The contractor shall provide a minimum one-year (12 Month) warranty IAW FAR Part

52.246-17 Warranty of Supplies of a Noncomplex Nature.

6 Installation

Table 2 shows the estimated number of aircraft to be installed during each contract year.

Table 2. Government Schedule

Contract

Year 1

Contract

Year 2

Contract

Year 3

Contract

Year 4

Contract

Year 5

Integration & Testing 2

Installation – US Aircraft (CFT) 26 36 36 36

Installation – US Aircraft (PDM) 75 75 75

Installation – Chile 1 1 1

Installation – France 1 1 1

Installation – Singapore 2 1 1

Installation – Turkey 3 2 2

CFT Installation

The CFT installation is anticipated to be scheduled at a rate of three (3) aircraft per month in contract years 2-5, which provides flexibility for less or more installations at the government’s discretion. For planning purposes, each CFT installation shall occur on separate days and separate visits. The government will attempt to schedule multiple aircraft for installation at the same location, mission availability permitting. The CFT installation shall not exceed 30 hours after receipt of each aircraft, to include sealant cure time. The government will provide a POC at every installation location. The government will provide an installation schedule that details the location and number of aircraft to be installed. The government will provide an in-brief upon arrival at each location consisting of local procedures and policies. The contractor shall be responsible for:

a. The removal and disposition of the existing transceiver, antenna, and associated wiring and hardware.

b. The installation of the replacement transceiver, antenna, and associated wiring and hardware.

c. The installation of the updated OFP.

d. The operational check and installation verification of the system.

6.1.1 Disposition Instructions

The contractor shall be responsible for the packaging and shipment of the removed antenna and transceiver. Return all reclaimed assets to the following address in “F” condition:

SW3119

DLA Distribution Warner Robbins

455 Byron Street

Bldg 376

Robins AFB, GA 31098-1887

6.1.2 Verification of Installation

The government considers an installation to be acceptable once all procedures from the

TCTO have been accomplished and validated by a government representative via DD

Form 250. The contractor shall provide monthly updates regarding the status of installations completed. (A035)

6.1.3 Travel

CFT shall be ready to travel with qualified personnel and equipment as directed not later than 90 days after receipt of first installation delivery order or as directed by the government. The contractor shall not travel without coordination with the PO. The contractor shall submit a travel request to the contracting officer not later than 14 days prior to travel. The contractor shall be responsible for travel to and from each location;

government lodging is not guaranteed. When planning travel, the contractor shall follow the Joint Federal Travel Regulations (JFTR).

PDM Installation

PDM installations are organic to the government. The contractor shall provide engineering support as required.

Government Furnished Information

The government will provide access to current configuration drawings and technical orders (TOs) required to integrate and install the Group A kits and Group B kits.

7 Contract Closeout

The contractor shall provide a contract summary report. (A024)