Attachment_J-6_-_DD_2794_Co-Plan_for_MMM-_Development.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- Multifunction Modular Mast
- Solicitation number
- N00024-19-R-6269
About this file
Attachment J-6 - DD 2794 Co-Plan for MMM - Development
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 2794, Pg 1
COST AND SOFTWARE DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | ELECTRONIC WARFARE SYSTEMS | |||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||
| Pre-A | X | B | C-FRP | Multifunction Modular Mast | Electronic Systems | X | INITIAL | ||||||
| A | C-LRIP | O&S | CHANGE | Not Applicable | |||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS |
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | |||||
| PROGRAM | X | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | X | RDT&E | Not Applicable | ||
| CONTRACT (SUB) | PROCUREMENT | |||||||||
| O&M |
| 11. WBS ELEMENT CODE | 12. | ||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||
| (X if applicable) | DD 1921-3 (CBDR): | DD 1921-1 / 1921-5 EAC: | EVM Reporting: |
| a. PROGRAM/ | ||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||
| SUBCONTRACT | a. CWBS | |||
| DICTIONARY | CCDR | g. SRDR | ||
| FORMATS | h. IPMR |
FORMAT 1
| b. DD 1921 | ||||||||
| (CDSR) | c. DD 1921-1 | |||||||
| (FCHR) | d. DD 1921-2 | |||||||
| (PCR) | e. DD 1921-5 | |||||||
| (SFCHR) | f. EAC | |||||||
| 1 | Multifunction Modular Mast (MMM) Block V | x | x | |||||
| 1.1 | Multifunction Modular Mast Prime Mission Product (PMP) | x | x | |||||
| 1.1.1 | Multifunction Modular Mast PMP Hardware | x | x | |||||
| 1.1.1.1 | MMM Above Deck Sensor Unit (ASDU) | x | x | |||||
| 1.1.1.1.1 | ASDU- Tactical Module | x | x | x | ||||
| 1.1.1.1.2 | ASDU- Payload Module | x | x | x | ||||
| 1.1.1.2 | MMM Outboard Cables | x | x | |||||
| 1.1.1.2.1 | Outboard Cables- Tactical Module | x | x | x | ||||
| 1.1.1.2.2 | Outboard Cables- Payload Module | x | x | x | ||||
| 1.1.1.3 | MMM Electrical Hull Fittings (EFH) | x | x | |||||
| 1.1.1.3.1 | EHF- Tactical Module | x | x | x | ||||
| 1.1.1.3.2 | EHF- Payload Module | x | x | x | ||||
| 1.1.1.4 | MMM Junction Box Unit (JBU) | x | x | |||||
| 1.1.1.4.1 | JBU- Tactical Module | x | x | x | ||||
| 1.1.1.4.2 | JBU- Payload Module | x | x | x | ||||
| 1.1.1.5 | MMM- Antenna Control Unit (ACU) | x | x | |||||
| 1.1.1.5.1 | ACU- Tactical Module | x | x | x | ||||
| 1.1.1.5.2 | ACU- Payload Module | x | x | x | ||||
| 1.1.2 | Multifunction Modular Mast PMP Software | x | x | x | ||||
| 1.2 | Multifunction Modular Mast PMP Integration, Assembly, and Checkout into AN/BLQ-10A | x | x | x | ||||
| 1.3 | Systems Engineering | x | x | |||||
| 1.3.1 | Hardware Systems Engineering | x | x | |||||
| 1.3.1.1 | Hardware PMP Systems Engineering | x | x | x | ||||
| 1.3.1.2 | Hardware ILS Systems Engineering | x | x | x | ||||
| 1.3.2 | Software Systems Engineering | x | x | x | ||||
| 1.3.3 | Hardware/Software Integration Systems Engineering | x | x | |||||
| 1.3.3.1 | Hardware/Software Integration PMP Systems Engineering | x | x | x | ||||
| 1.3.3.2 | Hardware/Software Integration ILS Systems Engineering | x | x | x | ||||
| 1.3.4 | Information Assurance/Cyber Security Systems Engineering | x | x | |||||
| 1.4 | Program Management | x | x | |||||
| 1.4.1 | Program Manager | x | x | x | ||||
| 1.4.2 | Contracts Management | x | x | x | ||||
| 1.4.3 | Supplier Management | x | x | x | ||||
| 1.4.4 | Finance | x | x | x | ||||
| 1.4.5 | Security | x | x | x | ||||
| 1.4.6 | Administrative Support | x | x | x | ||||
| 1.4.7 | ILS Management | x | x | x | ||||
| 1.5 | Systems Test & Evaluation | x | x | x | ||||
| 1.6 | Training | x | x | x | ||||
| 1.6.1 | Operator Training | x | x | |||||
| 1.6.1.1 | Operator Training Devices | x | x | |||||
| 1.6.1.2 | Operator Training Courseware | x | x | |||||
| 1.6.2 | Maintainer Training | x | x | |||||
| 1.6.2.1 | Maintainer Training Devices | x | x | |||||
| 1.6.2.2 | Maintainer Training Courseware | x | x | |||||
| 1.7 | Data | x | x | x | ||||
| 1.7.1 | Technical Publications | x | x | |||||
| 1.7.2 | Engineering Data | x | x | |||||
| 1.7.3 | Management Data | x | x | |||||
| 1.7.4 | Support Data | x | x | |||||
| 1.7.5 | Data Depository | x | x | |||||
| 1.8 | Peculiar Support Equipment (PSE) | x | x | x | ||||
| 1.9 | Support Equipment (CSE) | x | x | x | ||||
| 1.10 | Operational/Site Activation | x | x | x | ||||
| 1.10.1 | System Assembly, Installation and Checkout on Site | x | x | |||||
| 1.10.2 | Contractor Technical Support | x | x | |||||
| 1.10.3 | Site Construction | x | x | |||||
| 1.10.4 | Site/Ship/Vehicle Conversion | x | x | |||||
| 1.10.5 | Sustainment/Interim Contractor Support/Fleet Repairs | x | x | |||||
| 1.11 | Industrial Facilities | x | x | x | ||||
| 1.11.1 | Construction/Conversion/Expansion | x | x | |||||
| 1.11.2 | Equipment Acquisition or Modernization | x | x | |||||
| 1.11.3 | Industrial Facilities Maintenance | x | x | |||||
| 1.12 | Initial Spares and Repair Parts | x | x | |||||
| 1.12.1 | On-Board Repair Parts (OBRP) | x | x | |||||
| 1.12.2 | Installation and Check-Out (INCO) | x | x |
DD FORM 2794, AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
DD Form 2794, Pg 2
| 14. CSDR SUBMISSION DATES | |||||||
| a. | |||||||
| SUBMISSION | b. | ||||||
| FORM(S) | c. | ||||||
| EVENT | d. | ||||||
| REPORT TYPE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | 1921, 1921-1, CWBS Dictionary, Accounting System Data Downloads, and Material Invoices | MMM Block V Development Effort | Initial | TBD | TBD | ||
| 2 | 1921, 1921-1, CWBS Dictionary, Accounting System Data Downloads, and Material Invoices | MMM Block V Development Effort | Final | TBD | TBD | ||
| 15. REMARKS | |||||||
| Forms "Accounting System Data Downloads" and "Material Invoices" are defined in CDRL A00B | |||||||
| All costs incurred under these reports shall be related to all development efforts, regardless of funding source | |||||||
| NON-RECURRING/RECURRING DEFINITIONS | |||||||
| COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES | |||||||
| 1921-3 CONTRACTOR BUSINESS DATA REPORT | |||||||
| ** (if required) 1921-2 PROGRESS CURVE REPORT |
DD FORM 2794 (PAGE 2), AUGUST 2015 PREVIOUS EDITION IS OBSOLETE
File details come from the government source that posted it.