Exhibit A1 A004 DD Form 2794 DISC_CSDR_Plan.xls

XLS spreadsheet 79 KB Posted

Attached to
Directorate for Test Resources (DTR) Instrumentation Support Contract (DISC) Draft RFP
Solicitation number
HQ0855-21-R-0004
Issued by

About this file

This document package includes a Cost and Software Data Reporting (CSDR) plan template and information on a related federal contract opportunity.

The CSDR plan template is for the Directorate Instrumentation Support Contract (DISC) and outlines reporting requirements for cost, software, and technical data. It details a work breakdown structure with multiple levels for products like radar systems, transmitters, and support equipment. Reporting requirements include actual costs to date as well as estimates using different forms. The template specifies initial and annual submission events with due dates. It includes sections on intra-contract scope and remarks for items like recurring/non-recurring cost definitions and COVID-19 impacts.

The federal contract opportunity is a draft request for proposal (RFP) for the DISC. It is a 100% small business set-aside with NAICS code 541715 and involves test instrumentation support. The Missile Defense Agency seeks proposals for an indefinite delivery/indefinite quantity contract with both fixed-price and cost-reimbursement line items. The base period is five years with five one-year options. Proposals are due May 10, 2021 and contract award is targeted for January 2022. The RFP is in draft form and industry questions are due by January 25, 2021 regarding requirements and schedules for virtual industry days, site visits and one-on-one meetings.

View the file

Other files

File Type Posted
L15 Draft_MEDDS Task Order.docx DOCX document
L2 Past_Performance_Questionnaire.docx DOCX document
L10 Q_A Template.xlsx XLSX spreadsheet
L18 DISC CYBER Task Order PWS_12022020.docx DOCX document
L17 Draft_Cyber Task Order.docx DOCX document
L3 PPQ_Info_Sheet.docx DOCX document
Offerors Library.zip ZIP file
L16 DISC MEDDS Task Order PWS_12022020.docx DOCX document
Section M DISC DRAFT 4 Dec 20.docx DOCX document
Draft RFP HQ085521R0004 11172020.pdf PDF
J5C FY20 GFP Cyber.xlsx XLSX spreadsheet
J5E FY20 GFP XTR.xlsx XLSX spreadsheet
L9 Accounting_System_Checklist.doc DOC document
L14 DISC XTR-1 Task Order PWS_11092020.docx DOCX document
DISC Exhibit A.pdf PDF
L11 Draft_PCRSS Task Order.docx DOCX document
L12 DISC PCRSS Task Order PWS_11092020.docx DOCX document
J5B FY20 GFP MD3S.xlsx XLSX spreadsheet
J2 DISC DD-254 (HQ085521R0004) Redacted.pdf PDF
Section L DISC DRAFT 11 Dec 20.docx DOCX document
J3 Labor Categories.xlsx XLSX spreadsheet
L8 DRAFT DISC Excel Pricing Workbook 20201102 TH v3.xlsx XLSX spreadsheet
L4 Past_Performance_Questionnaire_Cover_Letter.docx DOCX document
L1 OCI_Disclosure_Form.pdf PDF
L13 Draft_XTR Task Order.docx DOCX document
J1 DISC PWS _12022020.docx DOCX document
L6 PP_Client_Authorization_Letter.docx DOCX document
J5A FY20 GFP ASI Template (1).xlsx XLSX spreadsheet
J5D FY20 GFP PCRSS.xlsx XLSX spreadsheet
L5 PP_Sample_ Subcontractor_ Consent_Letter.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
Directorate Instrumentation Support Contract
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
C-FRP
O&S
1c. PRIME MISSION PRODUCT
DISC
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
Other
2. COMMODITY TYPE
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20201029
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Crickett Petty
6b. ADDRESS (Include ZIP Code)
5224 Martin Road

Redstone Arsenal, AP 35898

6c. TELEPHONE NUMBER (Include Area Code)
256-450-5334
6d. E-MAIL ADDRESS
christel.petty@mda.mil and csdr@mda.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
MDA/DOC
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
TBD
iii. LOCATION
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
CBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD
9c. APPROPRIATION (check all that apply)
XRDT&E
PROCUREMENT
O&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
10b. APPROVED PLAN REVISION NUMBER
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
TECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01DTR Instrumentation Support Contract (DISC)XX
1.12X-Band Transportable Radar (XTR)XX
1.1.13Operations and Sustainment (O&S)XX
1.1.1.14Antenna and PedestalXX
1.1.1.1.15AntennaXX
1.1.1.1.1.16Dual Band Feed AssemblyXX
1.1.1.1.1.1.17Radio Frequency (RF) Receiver ProtectorsXX
1.1.1.1.1.1.27Monopulse ComparatorXX
1.1.1.1.1.1.37PolarizersXX
1.1.1.1.1.1.47Power DividersXX
1.1.1.1.25PedestalXX
1.1.1.1.2.16TowerXX
1.1.1.1.2.26Rotational MechanismXX
1.1.1.24S-Band TransmitterXX
1.1.1.2.15Passive ComponentsXX
1.1.1.2.1.16Wave GuideXX
1.1.1.2.1.26HybridsXX
1.1.1.2.1.36Phase ShiftersXX
1.1.1.2.1.46AttenuatorsXX
1.1.1.2.1.56Directional CouplersXX
1.1.1.2.1.66Harmonic FiltersXX
1.1.1.2.1.76CombinerXX
1.1.1.2.1.86Wave Guide SwitchXX
1.1.1.2.1.96Rotary JointsXX
1.1.1.2.25Power SupplyXX
1.1.1.2.2.16High Voltage (HV) Power SupplyXX
1.1.1.2.2.26HV Capacitor BankXX
1.1.1.2.2.36RegulatorXX
1.1.1.2.35Master Fault ControlXX
1.1.1.2.45S-Band Intermediate Power AmplifierXX
1.1.1.2.55S-Band Travelling Wave Tubes (TWT apmlifiers) (4)XX
1.1.1.2.65S-Band RF Protection SystemXX
1.1.1.2.75S-Band ModulatorXX
1.1.1.2.85Dry Air UnitXX
1.1.1.34X-Band TransmitterXX
1.1.1.3.15Power SupplyXX
1.1.1.3.1.16HV Power SupplyXX
1.1.1.3.1.26HV Capacitor BankXX
1.1.1.3.1.36RegulatorXX
1.1.1.3.25Master Fault ControlXX
1.1.1.3.35Dry Air UnitXX
1.1.1.44RF Box (mounted on antenna pedestal)XX
1.1.1.4.15RF Test Target DistributionXX
1.1.1.4.25X-Band TWTs (2)XX
1.1.1.4.35X-Band RF Protection SystemXX
1.1.1.4.45X-Band ModulatorXX
1.1.1.4.55X-Band Intermediate Power AmplifierXX
1.1.1.4.65X-Band and S-Band CirculatorsXX
1.1.1.4.75X-Band and S-Band Receiver ProtectorsXX
1.1.1.54Radar Open System Architecture (ROSA)XX
1.1.1.5.15Mission Control RoomXX
1.1.1.5.1.16Range Interface UnitXX
1.1.1.5.1.26Main Radar ComputerXX
1.1.1.5.1.36Operator ConsoleXX
1.1.1.5.1.46Flight Data Recorder SystemXX
1.1.1.5.1.56XTR Test BedXX
1.1.1.5.25Antenna Control SystemXX
1.1.1.5.35Transmitter Control SystemXX
1.1.1.5.45Transmitter Control NetworkXX
1.1.1.5.55Master Timing SystemXX
1.1.1.5.65Digital Sampling SystemXX
1.1.1.5.75Receiver SystemXX
1.1.1.5.7.16UpconvertersXX
1.1.1.5.7.26DownconvertersXX
1.1.1.5.7.36X- and S- Band ReceiversXX
1.1.1.5.85Frequency and TimingXX
1.1.1.5.8.16Global Positioning System ReceiverXX
1.1.1.5.8.26Wenzel Local OscillatorXX
1.1.1.64Cooling SystemsXX
1.1.1.6.15Chilled Water UnitXX
1.1.1.6.25Deionized Water UnitXX
1.1.1.6.35Conditioned Air UnitXX
1.1.1.74Power DistributionXX
1.1.1.84Common Support EquipmentXX
1.1.1.94TrainingXX
1.1.1.104SparesXX
1.1.1.114Systems Engineering and Program Management (SEPM)XX
1.1.23Mission SupportXX
1.1.2.14Mission Name (repeat)XX
1.1.2.1.15Mission Planning and RequirementsXX
1.1.2.1.25Test ExecutionXX
1.1.2.1.35Test Data Handling and ProcessingXX
1.1.2.1.45Flight Test AnalysisXX
1.1.2.1.55Program MangementXX
1.22Pacific Collector Range Safety System (PCRSS)XX
1.2.13Operations and Sustainment (O&S)XX
1.2.1.14Processing and Display Subsystem (PDS)XX
1.2.1.1.15Common Display System (CDS)XX
1.2.1.1.25Telemetry (TM) Data ProcessingXX
1.2.1.1.35Range Interface Unit (RIU)XX
1.2.1.24Command and Control Subsystem (CCS)XX
1.2.1.2.15Command Transmitter SystemXX
1.2.1.2.25Flight Termination Control SystemXX
1.2.1.2.2.16Flight Control Processors (FCP)XX
1.2.1.2.2.26Universal Destruct Panels (UDP)XX
1.2.1.2.2.36Flight Status and Control Panels (FSC)XX
1.2.1.2.35Antenna Control SystemXX
1.2.1.34Common Support EquipmentXX
1.2.1.44TrainingXX
1.2.1.54SparesXX
1.2.1.64SEPMXX
1.2.23Mission SupportXX
1.2.2.14Mission Name (repeat)XX
1.2.2.1.15Mission Planning and RequirementsXX
1.2.2.1.25Test ExecutionXX
1.2.2.1.35Test Data Handling and ProcessingXX
1.2.2.1.45Flight Test AnalysisXX
1.2.2.1.55Program MangementXX
1.32Mission Execution and Display Distribution System (MEDDS)XX
1.3.13Development & TransitionXX
1.3.1.14MEDDS TelemetryXX
1.3.1.24MEDDS Enclave Suite (Display Distribution Systems)XX
1.3.1.34Common Support EquipmentXX
1.3.1.44TrainingXX
1.3.1.54SparesXX
1.3.1.64SEPMXX
1.3.23Operations and Sustainment (O&S)XX
1.3.2.14MEDDS TelemetryXX
1.3.2.24MEDDS Enclave Suite (Display Development and Distribution)XX
1.3.2.34Common Support EquipmentXX
1.3.2.44TrainingXX
1.3.2.54SparesXX
1.3.2.64SEPMXX
1.3.33Mission SupportXX
1.3.3.14Mission Name (repeat)XX
1.3.3.1.15Mission Planning and RequirementsXX
1.3.3.1.25Test ExecutionXX
1.3.3.1.35Test Data Handling and ProcessingXX
1.3.3.1.45Flight Test AnalysisXX
1.3.3.1.55Program MangementXX
1.42CybersecurityXX
1.4.13XTRXX
1.4.1.14Equipment & SoftwareXX
1.4.1.24Cyber Maintenance OperationsXX
1.4.23PCRSSXX
1.4.2.14Equipment & SoftwareXX
1.4.2.24Cyber Maintenance OperationsXX
1.4.33MEDDSXX
1.4.3.14Development & TransitionXX
1.4.3.24Equipment & SoftwareXX
1.4.3.34Cyber Maintenance OperationsXX
1.52Program ManagementXX
1.62DataXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1FlexFileInitial SubmissionInitial60 days post contract award90 days post contract award
2FlexFileAnnual SubmissionInterimXXXX0930XXXX1231
3FlexFileRe-baseline SubmissionInterimre-baseline date60 days post re-baseline date
4FlexFileFinal SubmissionFinal1) the final end item has been delivered and accepted by the government and 2) 95% or more of total contract costs have been incurred60 days following the as-of-date
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
NON-RECURRING/RECURRING DEFINITIONS

The contractor will utilize the specific definitions and requirements in the CSDR Manual (DoD 5000.04-M-1) and the definitions in the DIDs for the forms 1921, 1921-1, and 1921-5 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. There are no refinements or expansions to these definitions warranted.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES

Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

The initial CSDR plan for cost reporting submissions, including the initial CWBS, must be approved by DOC, preferably at a post award conference with the Prime Contractor. Any edits to the CWBS shown here, must be approved by DOC and only DOC may modify the CSDR plan. Any elements added to the CWBS after the initial, approved submittal will require all cost reporting CDRLs on this contract unless DOC issues an update to this CSDR plan. Any deletion of elements from the initial, approved CWBS will not be removed from cost reporting requirements unless approved by DOC and reflected on a updated, DOC-issued CSDR plan. It is the responsibility of the Prime Contractor to request modifications to the CSDR plan.
The contractor shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.

Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.

If applicable, the contractor shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.

If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.

If applicable, the contractor shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
17. END ITEMS
a. IDb. NAME
18. OPTIONAL REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT REPORTING
(X if applicable)d. SEQUENCING

(X if applicable)

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

File details come from the government source that posted it. Updated .