9. DD2794_Cost and Software Reporting Plan_AF-24-M-C1_20240510.xls

XLS spreadsheet 110 KB Posted

Attached to
Space Development Agency (SDA) Advanced Fire Control Ground Infrastructure (AFCGI) Federal contract opportunity
Solicitation number
FA240124R0001
Issued by
Department of the Air Force

About this file

This document is a Cost and Software Data Reporting (CSDR) Plan for the Advanced Fire Control Ground Infrastructure (AFCGI) contract. The CSDR plan provides detailed requirements for the contractor to report cost, software, and technical data to the government throughout the contract performance.

Key details include:

  • The AFCGI contract is for the Space Development Agency's Advanced Fire Control (AFC) program, which will deliver integrated space and ground elements to demonstrate advanced fire control missions.
  • The CSDR plan requires the contractor to report both initial and annual cost, software, and technical data reports at various milestones and events from contract award through final delivery.
  • Specific reporting requirements are defined, including work breakdown structure elements, cost categories, software sizing metrics, and technical parameters.
  • The plan provides instructions on CSDR plan preparation, submission events and dates, cost accounting requirements, and CSDR readiness review procedures.

View the file

Other files for this federal contract opportunity

Other files attached to Space Development Agency (SDA) Advanced Fire Control Ground Infrastructure (AFCGI), newest first.
File Type Posted
10. AFCGI Questions and Answers 10 July 2024.pdf PDF
10. AFCGI Questions and Answers.pdf PDF
0. AFCGI Cover Letter FA240124R0001.docx DOCX document
00. SF33 FA240124R0001_Solicitation (Model Contract).docx DOCX document
4b. AFCGI Small Business Participation.docx DOCX document
7. AFCGI DD Form 1423 Contract Data Requirements List (CDRLs).docx DOCX document
4. AFCGI Section L-Proposal Instructions.docx DOCX document
4a. AFCGI Past Performance Questionnaire (PPQ).docx DOCX document
4d. Cost-Price Template (Priced).xlsx XLSX spreadsheet
5. AFCGI Section M Evaluation Factors.docx DOCX document
6. AFCGI GFX_GFI List.docx DOCX document
4c. AFCGI Resume Template.docx DOCX document
4f. Personnel & Facilities Template.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0671
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0671). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
SDA Advanced Fire Control (AFC) Ground Segment
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
XB
C-LRIP
C-FRP
O&S
1c. PRIME MISSION PRODUCT
Advanced Fire Control Ground Infrastructure (AFCGI)
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
XOther
2. COMMODITY TYPE
Space System
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20240510
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Otteson, Heather
6b. ADDRESS (Include ZIP Code)
Pentagon
6c. TELEPHONE NUMBER (Include Area Code)
(771) 221-0299
6d. E-MAIL ADDRESS
heather.f.otteson.civ@mail.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
Space Development Agency
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
TBD
iii. LOCATION
TBD
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
CBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD - (AF-24-M-C1)
9c. APPROPRIATION (check all that apply)
XRDT&E
XPROCUREMENT
XO&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
AF-24-M-C1
10b. APPROVED PLAN REVISION NUMBER
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

heather.f.otteson.civ@mail.mil

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01Advanced Fire Control Ground Infrastructure (AFCGI)X
1.12SEIT/PM and Support EquipmentX
1.1.13Systems EngineeringXX
1.1.23Assembly, Integration and TestXX
1.1.33Program ManagementXX
1.22Space Vehicle (N/A)XX
1.32Ground Operations and ProcessingX
1.3.13SEIT/PM and Support EquipmentXX
1.3.23COTS HardwareXX
1.3.33Custom Hardware 1...n (Specify)XX
1.3.43Ground Function SoftwareX
1.3.4.14SEPMXX
1.3.4.24Assembly, Integration and TestXX
1.3.4.34Support EquipmentXX
1.3.4.44Ground Function SW Release 1..n (Specify)X
1.3.4.4.15Ground Segment Network Communications, Infrastructure, And ConnectivityX
1.3.4.4.1.16Enterprise Devsecops And Integration Support ServicesXX
1.3.4.4.25Enterprise Services And Capabilities DevelopmentX
1.3.4.4.2.16Data ManagementXX
1.3.4.4.2.26Time ReferencingXX
1.3.4.4.2.36Health And Status MonitoringXX
1.3.4.4.35Mission Services And Capabilities DevelopmentX
1.3.4.4.3.16Network Management Services And CapabilitiesXX
1.3.4.4.3.26Ground Resources Management (GRM)XX
1.3.4.4.3.36Mission ManagementXX
1.3.4.4.3.46Mission Data ProcessingXX
1.3.4.4.3.56Mission Flight DynamicsXX
1.3.4.4.3.66Common Operational PictureXX
1.3.4.54Pre-Operations Maintenance 1..n (Specify)XX
1.3.53Pre-Operations Mission SupportXX
1.42Ground Entry Point (GEP) 1...n (Specify)X
1.4.13SEIT/PM and Support EquipmentXX
1.4.23Antenna 1...n (Specify)XX
1.4.33Optical Communication Assembly 1...n (Specify)XX
1.4.43RF Electronics Band 1...n (Specify)XX
1.4.53Timing 1...n (Specify)XX
1.4.63Baseband-Network 1...n (Specify)XX
1.4.73Monitor and Control Hardware 1...n (Specify)XX
1.4.83GEP SoftwareXX
1.4.93Pre-Operations Mission SupportXX
1.52Facilities 1...n (Specify)X
1.5.13SEIT/PM and Support EquipmentXX
1.5.23Site PreparationXX
1.5.33LandscapeXX
1.5.43Buildings 1...n (Specify)XX
1.5.53Equipment and Building Fit Out 1...n (Specify)XX
1.5.63Pre-Operations Maintenance 1...n (Specify)XX
1.62System Test and EvaluationX
1.6.13Developmental Test and EvaluationXX
1.6.23Operational Test and EvaluationXX
1.6.33Other Test and EvaluationXX
1.72TrainingXX
1.82DataXX
1.92Peculiar Support EquipmentXX
1.102Common Support EquipmentXX
1.112Operational/Site ActivationX
1.11.13System Assembly, Installation, and CheckoutXX
1.11.23Contractor Technical SupportXX
1.11.33Site ConstructionXX
1.11.43Site ConversionXX
1.11.53Interim Contractor Support (ICS)XX
1.122Contractor Logistics Support (CLS)XX
1.132Industrial FacilitiesXX
1.142Initial Spares and Repair PartsXX
1.152Packaging, Handling, Storage, and Transportation (PHS&T)XX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile)AFCGI Initial Cost ReportInitial2025013120250402
2Technical Data ReportAFCGI Initial Technical ReportInitial2025013120250402
3Cost and Hour Report (FlexFile)AFCGI Annual Cost Report #1Interim2026013120260402
4Technical Data ReportAFCGI Annual Technical Report #1Interim2026013120260402
5Cost and Hour Report (FlexFile)AFCGI Annual Cost Report #2Interim2027013120270402
6Technical Data ReportAFCGI Annual Technical Report #2Interim2027013120270402
7Cost and Hour Report (FlexFile)AFCGI Annual Cost Report #3Interim2028013120280401
8Technical Data ReportAFCGI Annual Technical Report #3Interim2028013120280401
9Cost and Hour Report (FlexFile)AFCGI Annual Cost Report #4Interim2029013120290402
10Technical Data ReportAFCGI Annual Technical Report #4Interim2029013120290402
11Cost and Hour Report (FlexFile)AFCGI Final Cost ReportFinal2029123120300302
12Technical Data ReportAFCGI Final Technical ReportFinal2029123120300302
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
The contractor must report costs on all CLINs associated with the AFCGI contract including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. Costs should not be omitted based on contract CLIN structure or definition.
a. CSDR PLAN REMARKS & PREPARATION INSTRUCTIONS
1. Costs reported against this CSDR plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission’s “AS OF DATE” (block 14.e)).
i. WBS Element Names (block 11.c) Ending with "1...n (Contractor Shall Specify)": The contractor shall extend and specify (i.e., include additional WBS elements determined by the contractor) in order to provide additional insight into the contractor's technical approach or design. The additional WBS elements shall be developed in accordance with the WBS guidelines included in MIL-STD-881F (or latest version).
ii. The contractor may extend any WBS element in accordance with guidelines included in MIL-STD-881F (or latest version). Any changes to WBS, Order/Lot, End Item, and/or Period of Performance must be reported to the government prior to submission or immediately, with revised CSDR Plan, must be approved by the CSDR Plan approval authority.
b. SUBMISSION EVENTS & DATES
1. Deliverable Preparation Instructions by AS OF and DUE Dates: All CSDR deliverable “AS OF DATE[S]” and “DUE DATE[S]” listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below:
i. All “DUE DATE” requirements are equal to the “AS OF DATE” plus 60 calendar days. If the calculated “DUE DATE” does not fall on a regular business day, the “DUE DATE” will be the next regular business day on the contractor’s accounting calendar.
ii. “Final” Submission Events must meet both of the following two conditions:

Condition 1: The final end item(s) has been delivered and accepted by the government (e.g., as evidenced by a completed DD-250) or higher tier contractor in the case of a subcontractor, and

Condition 2: 95% or more of all ATD costs associated with the Subtotal, G&A and FCCOM have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Item 4 of Data Group B) associated with the contract Subtotal, G&A, FCCOM and UB.

iii. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract.
c. TECHNICAL DATA REPORT
1. Include only UNCLASSIFIED/CUI information in Technical Data Report deliverables submitted to CADE. Notify the Government if any values associated with the Technical Parameter Requirements are classified.
d. RESOURCE DISTRIBUTION TABLE (RDT)
1. Submissions of the Resource Distribution Table (RDT) are required under the following conditions:
i. An RDT shall be delivered no later than seven calendar days before the “CSDR Readiness Review”. Prepare this submission of the RDT, in accordance with the RDT Instructions on the CADE website, at FAC/EAC value and utilizing the instructions at Block15.a.4.i.This copy of the RDT will be used during the “CSDR Readiness Review” in order to identify which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to CADE and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.
ii. The contractor must notify the government program office immediately of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to CADE but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).
e. RELATIONSHIP/USE OF COST ACCOUNTING STANDARDS (CAS)
1. The contractor shall provide a description of significant accounting systems or CAS changes and how those changes effect the latest CSDR deliverable or the ability to compare CSDR deliverables provided before/after the accounting system/CAS revision. The contractor shall provide the description within the submission remarks of the FlexFile deliverable.
f. CSDR READINESS REVIEW
1. The contractor shall host a CSDR-RR at the contractor’s facility where CSDRs are prepared with the Government’s Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD Manual 5000.04 (CSDR Manual). The purpose of the CSDR-RR is to review the contract’s CSDR requirements and assess how the Contractor’s accounting system satisfies the CSDR requirements found in DODM 5000.04 and this CSDR Plan. Reference the CADE website for instructions and additional information: https://cade.osd.mil/policy/csdr-timeline
2. The contractor and CWIPT will also review the initial submission of the "Resource Distribution Table (RDT)", in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to Cost Assessment Data Enterprise (CADE), and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.
3. The CSDR-RR shall be held within 60 days of contract award or the start of work meeting on a date mutually agreed to by the CWIPT and the contractor. This meeting has an anticipated duration of one business day.
g. IRAD EFFORT
1. The contractor should list the major relevant IRAD projects leveraged for this development effort, provide a brief description of the cost of the projects, and provide/attach any more detailed actual cost information at the level available.
h. SPECIAL INSTRUCTIONS
1. The reporting entity shall capture and report any and all costs incurred in order to perform the scopes of work on the Contract irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or funding source (i.e., via contract, via contractor internal research & development funds).”
2. The reporting entity is instructed to report costs for all prior and future contract years, per Page 3 of the DD 2794, in order to capture the entire contract cost. Data submitted in each CSDR deliverable shall reflect cumulative data from the contract Period of Performance Start Date through the As Of Date indicated on Page 3 of the DD 2794. Please note that the reporting entity may use their accounting month end date closest to the As Of Date listed on Page 3.
3. Prime contractors are responsible for flowing down CSDR requirements to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.73, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the CADE Portal using the CSDR Submit-Review System. The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to CAPE for approval.
Summary
The definitions are intended for application to all levels of integration, or WBS indenture, within the ground system: parts, materials and labor; hardware components, subassemblies, major assemblies and end items (“boxes”); computer software configuration items (CSCIs) and components (CSCs); and subsystems, system segments, and the system as a whole.
General Definitions
Acquisition costs for development of the ground system are classified as nonrecurring irrespective of the milestone, phase or gate of the overall program or the WBS element in question. So NRE costs include initial development, upgrades, and improvements to hardware, software and facilities that make up the system. Thus, requirements definition, design, engineering analyses, development hardware and software, development testing, and development support hardware and software are nonrecurring efforts.
Acquisition costs for production of ground operations and processing centers (GOPCs), Ground Entry Points (GEPs), along with associated facilities, and components thereof; for spares; and for replicated spacecraft components used in ground testing and simulators are classified as recurring. Costs for installation of previously developed software in ground stations are recurring. Similarly, costs for acquisition and installation of commercial off-the-shelf software (COTS) for operational use in ground stations are recurring.
Operations and Support (O&S) costs for development of concepts, procedures, training materials and simulators are classified as nonrecurring. Costs for system operation and maintenance, including training, are recurring.
Nonrecurring (NRE) general examples which apply to hardware, software, facilities and O&S include: initial development of spacecraft, GOPCs, GEPs and other system segments, elements, interfaces; support equipment used for development; software development; development of upgrades and improvements (despite magnitude)
Recurring (REC) general examples: Ground hardware production and installation; Construction of operational ground facilities; installation of developed and COTS software in GOPCs and GEPs; replicated space hardware in GOPCs and GEPs; spares for spacecraft, GOPCs and GEPs; test equipment, software and procedure maintenance; and system operation and maintenance
The software definitions apply to ground station operational software, development software, and ground test software for development and production. Ground support equipment (GSE) is addressed below. It is usually treated separately from assembly, integration and test for cost collection and estimating purposes.
Software Related Definitions
Nonrecurring Cost:
Development of delivered operational S/W

Software test procedures Software configuration management, quality assurance & documentation Support for/conduct of first-time software I&T with hardware and subsequent higher level I&T Test, development support and space vehicle production support S/W: develop. and maint. up to 1st launch Commercial S/W licenses for development facilities and ground station development support Fixing deficiencies and developing enhancements in Ground and flight software from installation up to IOC

Recurring Cost:
Installation and check-out of developed S/W in ground stations

If first-time S/W I&T is performed at ground station, then it is NRE Maintenance of S/C production & test support S/W after first launch Acquisition of stand-alone and bundled COTS S/W in operational system Maintenance of flight S/W (usually embedded in acquisition contracts)"

Systems Engineering Related Definitions
Nonrecurring Cost:
Requirements definition, allocation and flow-down

Specifications and ICDs – initial development & maintenance until all TBDs and TBRs are removed Top level design trade-offs and system definition Analyses and simulations of system performance and effectiveness, mission assurance, reliability,availability, maintainability, survivability, security, safety, EMI/EMC, radiation, survivability, contamination control, human engineering, autonomy and fault management Operations concept development Technical direction and configuration control during development Risk management though CDR Mass, power, link margin & reliability budgets -- initial development & maintenance until design complete Processing time & memory budgets Development, production, verification, risk management, training and security plans Parts, materials and processes – establishing procedures, etc.

Product assurance development tasks Requirements verification through design completion, including demonstrations and IV&V Technical change management (RFIs, ECPs, etc.) -- NR tasks supporting changes, handling nonrecurring-only changes Design Integration -- mechanical, electrical, thermal, facilities Functional and physical configuration audit (FCA/PCA) support System documentation

Recurring Cost:
Maintenance of specs, ICDs, plans & budgets -- after all TBDs and TBRs are removed

Performance, S/W maintenance productivity metrics Analysis updates System configuration control after design completion Mass, power, link margin & reliability budgets – supporting production Support for production testing, rehearsals and operational test and evaluation Product assurance Requirements verification after design completion Launch readiness reviews, support for product acceptance Technical change management (RFIs, ECPs, etc.) -- supporting recurring portions of changes and recurring- only changes

Assembly Integration & Test (AI&T) Related Definitions
Nonrecurring Cost:
Development, qualification and life testing – all levels and system segments
Development and acceptance test plans and procedures

Development, qualification and life test analysis and reports I&T for correcting software problems prior to IOC

Recurring Cost:
Space vehicle assembly, integration and acceptance testing

Acceptance test analysis and reports Integration and test of previously-developed software –in GOPCs, GEPs

Program Management Related Definitions
Nonrecurring Cost:
Management activities applied to/associated with NRE efforts – top level program management, project control and planning, business/financial mgmt, subcontract mgmt, product effectiveness, computer support

Procedures and infrastructure establishment – Cost accounting, configuration & data management, parts & material acquisition, security, facilities

Recurring Cost:
Management activities applied to/associated with REC efforts
Expanded Ground Support Equipment Definitions
Nonrecurring Cost:
Concept of operations and maintenance development

Operations & maintenance procedure development Development of training materials, simulators and aids Initial ILS analysis and data Upgrades/changes to above associated with:

Major redesigns, capability increments Recapitalization, operating system changes

Recurring Cost:
System operation costs – operations, training, systems engineering & management staff
Hardware maintenance & recapitalization

Software maintenance – including COTS license costs Software modifications/fixes after IOC Reproduction and updating of technical data and manuals Procurement/production of hardware spares Rehearsals and initialization of space vehicles

Pre-Operations Support Definitions
Pre-Operations Maintenance 1..n (Specify):
These elements contain all the resources related to the pre-operations (Pre-Ops) maintenance (software updates) of Bus Flight Software. This function begins with the acceptance of the Bus Software elements and ends with the start of Operations.
Pre-Operations Mission Support:
This element includes all the resources required for the operation of the Ground system prior to turn-over.

Includes, for example:

a. On-orbit testing; routine monitoring of Ground system equipment health and status

b. Fault detection

c. Anomaly investigation and resolution. (The Mission Support period typically begins after installation and a specified time prior to launch and ends when the Space Vehicle achieves initial operational capability.)

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1AFCGIB
17. END ITEMS
a. IDb. NAME
1...nAFCGI End Items (1...n)
18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT/SUBLOT REPORTING
(X if applicable)d. UNIT SEQUENCING

(X if applicable)

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

DD Form 2794, Pg 9a (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS
29. WBS
ELEMENT CODE30. WBS ELEMENT NAME31. ITEM TYPE32. TECHNICAL PARAMETER
a. PARAMETER NAMEb. UNIT OF MEASUREc. UNIT OF MEASURE QUALIFIERd. REPEATABLEe. DEFINITIONf. REMARKS
1.0Advanced Fire Control Ground Infrastructure (AFCGI)Milestone DateContract AwardDate
1.0Advanced Fire Control Ground Infrastructure (AFCGI)Milestone DateSystem PDRDate
1.0Advanced Fire Control Ground Infrastructure (AFCGI)Milestone DateSystem CDRDate
1.0Advanced Fire Control Ground Infrastructure (AFCGI)GroundFactory LocationsList
1.0Advanced Fire Control Ground Infrastructure (AFCGI)GroundTestbed LocationsList
1.3Ground Operations and ProcessingMilestone DateAuthority to Proceed (ATP) Date
1.3Ground Operations and ProcessingMilestone DatePhysical Configuration Audit / Functional Configuration Audit (per site)
1.3Ground Operations and ProcessingGroundProcessNumber of GOPC SitesQuantity
1.3Ground Operations and ProcessingGroundProcessInstallation LocationsQuantity
1.3Ground Operations and ProcessingSysEngNumber of Requirement Document - "Shalls"QuantityShalls
1.3Ground Operations and ProcessingHeritagePredecessor SystemDescriptor
1.3Ground Operations and ProcessingHeritageNew DesignPercent
1.3.2COTS HardwareGroundProcessNumber of WorkstationsQuantityWorkstations
1.3.2COTS HardwareGroundProcessNumber of EnclosuresQuantityEnclosures
1.3.2COTS HardwareGroundProcessNumber of Electronic RacksQuantityRacks
1.3.2COTS HardwareGroundProcessNumber of Wide Area NetworksQuantityNetworks
1.3.2COTS HardwareGroundProcessData StorageTerabytes
1.3.2COTS HardwareGroundProcessNumber of ServersQuantityServers
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRNew Code - Human GeneratedSLOCActual to DateThe delivered size of the product developed that is human generated.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRNew Code - Auto-GeneratedSLOCActual to DateThe delivered size of the product developed that is auto-generated.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRNew Code - Human GeneratedSLOCEstimate at CompleteThe delivered size of the product developed that is human generated.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRNew Code - Auto-GeneratedSLOCEstimate at CompleteThe delivered size of the product developed that is auto-generated.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRReused Code - Actual to DateSLOCActual to DateCode from external sources (government-furnished or otherwise) that is included and reused without modification.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRReused Code - Estimate at CompleteSLOCEstimate at CompleteCode from external sources (government-furnished or otherwise) that is included and reused without modification.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRReused Code - AAF%SLOCAdaptation Adjustment Factor (AAF) - top-level percentage of effort of adapting the reused code to the new system relative to a line of new code.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRModified Code - Actual to DateSLOCActual to DateModified code is defined as pre-developed code that can be incorporated in the software component with a significant amount of effort, but less effort than required for a newly developed code.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRModified Code - Estimate at CompleteSLOCEstimate at CompleteModified code is defined as pre-developed code that can be incorporated in the software component with a significant amount of effort, but less effort than required for a newly developed code.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRModified Code - AAF%SLOCAdaptation Adjustment Factor (AAF) - top-level percentage of effort of adapting the modified code to the new system relative to a line of new code.
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRSoftware Requirements Count - NewSRSShallsThe estimated or actual number of added or new requirements satisfied by the developed software product at the completion of the releaseSpecify estimate or actual
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRSoftware Requirements Count - ModifiedSRSShallsThe estimated or actual number of modified requirements satisfied by the developed software product at the completion of the releaseSpecify estimate or actual
1.3.4.4Ground Function SW ReleaseSoftwareNonSRDRSoftware Requirements Count - DeletedSRSShallsThe estimated or actual number of requirements deleted, and thus not included in the releaseSpecify estimate or actual
1.4Ground Entry Point (GEP) 1..nSysEngNumber of Requirement Document - "Shalls"QuantityShalls
1.4Ground Entry Point (GEP) 1..nMilestone DateAuthority to Proceed (ATP) DateDescriptor
1.4Ground Entry Point (GEP) 1..nMilestone DatePhysical Configuration Audit / Functional Configuration Audit (per site)Descriptor
1.4Ground Entry Point (GEP) 1..nGEPNumber of GEP SitesQuantity
1.4Ground Entry Point (GEP) 1..nGEPInstallation LocationsDescriptor
1.4Ground Entry Point (GEP) 1..nHeritageNew DesignPercent
1.4Ground Entry Point (GEP) 1..nHeritagePredecessor SystemDescriptor
1.4.2Antenna 1...nAntennaNumber of Antennas per SiteQuantity
1.4.2Antenna 1...nPhysicalElecPower - Maximum Consumption RateKilowattsPer Antenna Face
1.4.2Antenna 1...nAntennaFrequency RangeMegahertzInstantaneous
1.4.2Antenna 1...nAntennaAperture - Antenna (m)Meters
1.4.2Antenna 1...nAntennaNumber of Sub ArraysQuantity
1.4.2Antenna 1...nAntennaBandwidthGigahertz
1.4.2Antenna 1...nAntennaType of SteeringListBeams
1.4.2Antenna 1...nAntennaTechnology TypeDescriptor
1.4.2Antenna 1...nAntennaOperational ModeList
1.4.2Antenna 1...nAntennaArray BeamsQuantity
1.4.2Antenna 1...nAntennaNumber of Array Active ElementsQuantity
DRAFT DD FORM 2794 (PAGE 9a), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019

DD Form 2794, Pg 9b (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
33. TECHNICAL PARAMETER REQUIREMENTS (LIST ITEMS)
a. ITEM TYPEb. PARAMETER NAMEc. LIST ITEMS
AntennaType of SteeringElectronically Scanned
AntennaType of SteeringMechanically Scanned
AntennaType of SteeringOther
AntennaOperational ModeActive
AntennaOperational ModePassive
DRAFT DD FORM 2794 (PAGE 9b), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019