Attachment_21_DD2794 Avionics CSDR Plan_21 Nov 2022.xlsx

XLSX spreadsheet 199 KB Posted

Attached to
T-6A Avionics Replacement Program Federal contract opportunity
Solicitation number
FA8106-23-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to T-6A Avionics Replacement Program, newest first.
File Type Posted
Industry Questions-Responses_Part V.pdf PDF
FA810623R0001_______0004.pdf PDF
Attachment_2_SOW_Rev3.pdf PDF
Attachment_4_Pricing_Matrix_10Feb23-PROTECTED_Rev2.xlsx XLSX spreadsheet
Industry Questions-Responses_Part IV.pdf PDF
Industry Questions-Responses_Part III.pdf PDF
Attachment_2_SOW_Rev2.pdf PDF
Attachment_3_Incentive Plan_ Rev 1.pdf PDF
Attachment_17b_Bidders_Library_Aircraft_ATD.pdf PDF
FA810623R0001_______0003.pdf PDF
Attachment_1_CDRLs_DIDs_Rev1.pdf PDF
Attachment_20_PPI Tool Download Instructions_Rev1.docx DOCX document
Industry Questions-Responses_Part II.pdf PDF
T-6A ARP Industry Day Agenda_Tinker AFB_v2.pdf PDF
T-6A ARP Industry Day Agenda_Randolph AFB.pdf PDF
Attachment_20_PPI Tool Download Instructions.docx DOCX document
Attachment_6_Section L_Rev1.pdf PDF
Attachment_2_SOW_Rev1.pdf PDF
Attachment_7_Section_M_Rev1.pdf PDF
T-6 ARP Industry Day Registration Form_Randolph.docx DOCX document
Attachment_4_Pricing_Matrix_13Dec22-PROTECTED_Rev1.xlsx XLSX spreadsheet
FA810623R0001_______0002.pdf PDF
Industry Questions-Responses_Part I.pdf PDF
T-6 ARP Industry Day Registration Form_Randolph.docx DOCX document
T-6 ARP Industry Day Registration Form_Tinker.docx DOCX document
T-6A ARP Industry Day Agenda_Tinker AFB.pdf PDF
T-6A ARP Industry Day Agenda_v3.pdf PDF
T-6A ARP Industry Day Agenda_v2.pdf PDF
T-6 ARP Industry Day Registration Form.docx DOCX document
T-6A ARP Industry Day Agenda.pdf PDF
FA810623R0001_______0001.pdf PDF
FA810623R0001.pdf PDF
Attachment_6_Section_L.pdf PDF
Attachment_5_GFP.pdf PDF
Attachment_4_Pricing_Matrix_4Nov22-PROTECTED.xlsx XLSX spreadsheet
Attachment_17_Bidders_Library_Aircraft_ATD.pdf PDF
Attachment_17a_Bidders_Library_Aircraft_ATD.PDF PDF
Attachment_1_CDRLs_DIDs.pdf PDF
Attachment_2_SOW.pdf PDF
Attachment_16_GFI.pdf PDF
Attachment_3_Incentive_Plan.pdf PDF
Attachment_7_Section_M.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
T-6 Avionics Replacement Program (ARP)
1b. PHASE/MILESTONE (check all that apply)
Pre-A
XA
XB
C-LRIP
XC-FRP
O&S
1c. PRIME MISSION PRODUCT
T-6A Aircraft
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
XACAT II
ACAT III
Other
2. COMMODITY TYPE
Aircraft System
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20220928
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
VanDeventer, Gale, R
6b. ADDRESS (Include ZIP Code)
Bldg. 8400 - North Rm. 104, 5316 S. Douglas Blvd., Oklahoma City, OK 73150
6c. TELEPHONE NUMBER (Include Area Code)
405-734-3223 (Office)
6d. E-MAIL ADDRESS
gale.vandeventer@us.af.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
AFLCMC/WLDJ
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME

iii. LOCATION

iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
9c. APPROPRIATION (check all that apply)
XRDT&E
XPROCUREMENT
O&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
AF-22-M1
10b. APPROVED PLAN REVISION NUMBER
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES

DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

mailto:gale.vandeventer@us.af.mil DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01T-6A Avionics Replacement Program (ARP)X
1.12Prime Mission Product (PMP) - Avionics Replacement Program Aircraft ModificationX
1.1.13PMP Integration, Assembly, Test and CheckoutX
1.1.1.14Integration and AssemblyXXX
1.1.1.24Test and CheckoutXXX
1.1.1.34Rate ToolingXXX
1.1.23Communication/Identification B-KitX
1.1.2.14Communication/Identification Integration, Assembly, Test, and CheckoutXXX
1.1.2.24Communication/Identification Box 1...n (Specify)X
1.1.2.2.15RadiosX
1.1.2.2.1.16Radio (Voice) 1...n (Specify)XXX
1.1.2.2.1.26Radio (Data) 1...n (Specify)XXX
1.1.2.2.1.36Traffic Advisory System (TAS) 8 LRUXXX
1.1.2.2.25Ancillary EquipmentX
1.1.2.2.2.16Antenna 1...n (Specify)XXX
1.1.2.2.2.26Amplifier 1...n (Specify)XXX
1.1.2.2.2.36Control Head 1..n (Specify)XXX
1.1.2.2.2.46Other Ancillary Equipment Subsystems 1...n (Specify)XXX
1.1.2.2.35Intercom System (Audio System/Intercom)X
1.1.2.2.3.16Audio System LRU 1…n (specify)XXX
1.1.2.2.45Communication Service Provider Contract 1..n (Specify)XXX
1.1.2.2.55Communication/Identification Software Release 1...n (Specify)
1.1.2.2.5.16Communication/Identification Software CSCI 1...n (Specify)XX
1.1.33Navigation/Guidance - B-KitX
1.1.3.14Navigation/Guidance Integration, Assembly, Test, and CheckoutXXX
1.1.3.24Navigation/Guidance Box 1...n (Specify)X
1.1.3.2.15Terminal / Line Replaceable Unit (LRU)X
1.1.3.2.1.16Embedded Global Positioning System (GPS)/inertial (EGI) Navigation SystemXXX
1.1.3.2.1.26Multimode Receiver 1..n (Specify)XXX
1.1.3.2.1.36Very High Frequency Omnidirectional Range (VOR)XXX
1.1.3.2.1.46Tactical Air Navigation System (TACAN)XXX
1.1.3.2.1.56Standalone Gps ReceiverXXX
1.1.3.2.1.66Satellite Based Augmentation SystemXXX
1.1.3.2.1.76Distance Measuring Equipment (DME)XXX
1.1.3.2.1.86Air Data ComputerXX
1.1.3.2.1.96Other Terminal / Line Replaceable Units (LRU) Subsystems 1...n (Specify)XXX
1.1.3.2.25Navigation SensorX
1.1.3.2.2.16AltimeterXXX
1.1.3.2.2.26Altitude Heading ReferenceXXX
1.1.3.2.2.36Pitot Static SystemXXX
1.1.3.2.2.46Automatic Direction Finder (ADF)XXX
1.1.3.2.2.56Other Navigation Sensor Subsystems 1...n (Specify)XXX
1.1.3.2.35Ancillary EquipmentX
1.1.3.2.3.16Antenna 1..n (Specify)XXX
1.1.3.2.3.26Control Head 1..n (Specify)XXX
1.1.3.2.3.36Other Ancillary Equipment Subsystems 1...n (Specify)XXX
1.1.3.34Navigation Guidance Software Release 1...n (Specify)
1.1.3.3.15Navigation/Guidance Software CSCI 1...n (Specify)XX
1.1.3.44Navigation Subsystem Loader LRUXXX
1.1.3.54Database Service Provider Contract 1…n (specify)XXX
1.1.43Mission Computer/Processing (Integrated Computing Subsystem) - B-KitX
1.1.4.14Mission Computer/Processing Integration, Assembly, Test, and CheckoutXXX
1.1.4.24Mission Computer/Processing Box 1...n (Specify)X
1.1.4.2.15Avionics Computer LRU 1XXX
1.1.4.2.25Avionics Computer LRU 2XXX
1.1.4.2.35Control Display Unit (CDU)/flight Management SystemXXX
1.1.4.2.45Air Data ComputerXXX
1.1.4.2.55Data Transfer Unit (DTU) LRUXXX
1.1.4.2.65Remote Input Output Unit LRUXXX
1.1.4.2.75Other Integrated Computing LRU 1..n (specify)XXX
1.1.4.2.85Other Mission Computer/Processing Subsystems 1...n (Specify)XXX
1.1.4.2.94Integrated Computing Software Release 1...n (Specify)
1.1.4.2.9.15Integrated Computing Software CSCI 1...n (Specify)XX
1.1.53Fire ControlXXX
1.1.63Data Display and Control B-KitX
1.1.6.14Data Display and Control Integration, Assembly, Test, and CheckoutXXX
1.1.6.24Data Display and Control Box 1...n (Specify)XXX
1.1.6.34Display SubsystemX
1.1.6.3.15FWD Primary Flight Display (PFD) LRUXXX
1.1.6.3.25FWD Multi-functional Displays (MFD) LRU 1…n (specify)XXX
1.1.6.3.35AFT Primary Flight Display (PFD) LRUXXX
1.1.6.3.45AFT Multi-functional Displays (MFD) LRU 1…n (specify)XXX
1.1.6.3.55Other Data Display or Indicator LRU 1...n (Specify)XXX
1.1.6.3.65Display Software Release 1…n (specify)
1.1.6.3.6.16Display Software CSCI 1…n (specify)XX
1.1.6.44Data Entry and Control SubsystemX
1.1.6.4.15FWD Controllers LRU 1..n (specify)XXX
1.1.6.4.25AFT Controllers LRU 1…n (specify)XXX
1.1.6.4.35Other Data Entry & Control LRU 1..n (specify)XXX
1.1.6.4.45Data Display Software Release 1…n (specify)X
1.1.6.4.4.16Data Display and Control Software CSCI 1…n (specify)XX
1.1.6.4.54Engine Indicating And Crew Alert System (EICAS)XXX
1.1.6.4.64Indicators 1..n (Heading, Airspeed, Altitude, Vertical Speed, Gyroscopic Turn)XXX
1.1.6.4.74Other Data Display & Control Subsystems 1...n (Specify)XXX
1.1.73SurvivabilityXXX
1.1.83Reconnaissance/SurveillanceXXX
1.1.93Automatic Flight Control - B-KitX
1.1.9.14Automatic Flight Control Integration, Assembly, Test, and CheckoutXXX
1.1.9.24Automatic Flight Control Box 1...n (Specify)X
1.1.9.2.15Electronic DevicesXXX
1.1.9.2.25Flight Control SensorsXXX
1.1.9.2.35Controlled Flight into Terrain - Prevention (CFIT-P)
1.1.9.2.3.16CFIT-P LRUXX
1.1.9.2.3.26Terrain Inhibit Switch/Indicator LRUXX
1.1.9.2.3.36Other CFIT-P LRU 1..n (specify)XX
1.1.9.2.3.45Other Automatic Flight Control Subsystems 1...n (Specify)XXX
1.1.9.34Automatic Flight Control Software Release 1...n (Specify)X
1.1.9.3.15Automatic Flight Control Software CSCI 1...n (Specify)XXX
1.1.103Health Monitoring SystemXXX
1.1.113Stores ManagementXXX
1.1.123Avionics Software Release 1...n (Specify)
1.1.12.14Avionics Software CSCI 1...n (Specify)XX
1.1.12.24Avionics Software Integration, Assembly, Test and CheckoutXXX
1.1.133Standby Instrument Subsystem B-KitX
1.1.13.14FWD Standby InstrumentXXX
1.1.13.24AFT Standby InstrumentXXX
1.1.13.34Standby Instrument Software Release 1..n (specify)XX
1.1.13.44Standby Instrument Software CSCI 1…n (specify)XX
1.22Platform Integration, Assembly, Test, and CheckoutX
1.2.13Group A KitX
1.2.1.24Communication/Identifiation Group A KitX
1.2.1.2.15Panel Assembly 1..n (specify)XXX
1.2.1.2.25Shelf Assembly 1..n (specify)XXX
1.2.1.2.35Bracket Assembly 1…n (specify)XXX
1.2.1.2.45Wire/Cabling Kit 1…n (specify)XXX
1.2.1.2.55Other Group A assemblies and kits 1…n(specify)XXX
1.2.1.34Navigation/Guidance Group A KitX
1.2.1.3.15Panel Assembly 1..n (specify)XXX
1.2.1.3.25Shelf Assembly 1..n (specify)XXX
1.2.1.3.35Bracket Assembly 1…n (specify)XXX
1.2.1.3.45Wire/Cabling Kit 1…n (specify)XXX
1.2.1.3.55Other Group A assemblies and kits 1…n(specify)XXX
1.2.1.44Mission Computer/Processing (Integrated Computing Subsystem) Group A KitX
1.2.1.4.15Panel Assembly 1..n (specify)XXX
1.2.1.4.25Shelf Assembly 1..n (specify)XXX
1.2.1.4.35Bracket Assembly 1…n (specify)XXX
1.2.1.4.45Wire/Cabling Kit 1…n (specify)XXX
1.2.1.4.55Other Group A assemblies and kits 1…n(specify)XXX
1.2.1.54Data Display and Control Group A KitX
1.2.1.5.15Panel Assembly 1..n (specify)XXX
1.2.1.5.25Shelf Assembly 1..n (specify)XXX
1.2.1.5.35Bracket Assembly 1…n (specify)XXX
1.2.1.5.45Wire/Cabling Kit 1…n (specify)XXX
1.2.1.5.55Other Group A assemblies and kits 1…n(specify)XXX
1.2.1.64Automatic Flight Control Group A KitX
1.2.1.6.15Panel Assembly 1..n (specify)XXX
1.2.1.6.25Shelf Assembly 1..n (specify)XXX
1.2.1.6.35Bracket Assembly 1…n (specify)XXX
1.2.1.6.45Wire/Cabling Kit 1…n (specify)XXX
1.2.1.6.55Other Group A assemblies and kits 1…n(specify)XXX
1.2.1.74Standby Instrument Subsystem Group A KitX
1.2.1.7.15Panel Assembly 1..n (specify)XXX
1.2.1.7.25Shelf Assembly 1..n (specify)XXX
1.2.1.7.35Bracket Assembly 1…n (specify)XXX
1.2.1.7.45Wire/Cabling Kit 1…n (specify)XXX
1.2.1.7.55Other Group A assemblies and kits 1…n(specify)XXX
1.2.1.84Other Group A Kits 1…n (specify)XXX
1.2.1.94T-6A/B/D Aircraft Site SurveysXXX
1.2.1.104Physical Prototype Install (PPI)X
1.2.1.10.15Integration and AssemblyXXX
1.2.1.10.25Test and CheckoutXXX
1.2.1.10.35Rate ToolingXXX
1.2.1.114Kit Proof Install (KPI)X
1.2.1.11.15Integration and AssemblyXXX
1.2.1.11.25Test and CheckoutXXX
1.2.1.11.35Rate ToolingXXX
1.2.1.124Val/Ver InstallX
1.2.1.12.15Integration and AssemblyXXX
1.2.1.12.25Test and CheckoutXXX
1.2.1.12.35Rate ToolingXXX
1.2.1.134Val/Ver TCTOXXX
1.32Systems Engineering
1.3.13Software Systems EngineeringXX
1.3.23Integrated Logistics Support (ILS) Systems EngineeringXX
1.3.33Cybersecurity Systems EngineeringXX
1.3.43Core Systems Engineering
1.3.4.14Systems Engineering Managmenet Plan (SEMP)XX
1.3.4.24Interface Control Document (ICD)XX
1.3.4.34System/Subsystem Specificaiton (SSS)XX
1.3.4.44Requirements Traceability Matrix (RTM)XX
1.3.4.54Requirements Traceablity Verification Matrix (RTVM)XX
1.3.4.64System SafetyXX
1.3.4.74Human Factors EngineeringXX
1.3.4.84Reliability and MaintainabilityXX
1.3.4.94Hazardous Materials ManagementXX
1.3.4.104Frequency AllocationXX
1.3.53USAF Airworthiness Certifiation - OSS&E Analyses
1.3.5.14Stress AnalysisXX
1.3.5.24Electrical Load Analysis (ELA)XX
1.3.5.34Weight and Balance AnalysisXX
1.3.5.44Airworthiness Compliance ReportXX
1.3.5.54EMI/EMC AnalysesXX
1.3.63FAA Certification and STC
1.3.6.14Project Specific Compliance Plan (PSCP)XX
1.3.6.24Drawings/Reports Review for MCOXX
1.3.6.34Detail Parts and Installation ConformityXX
1.3.6.44Substantiation Data for FAA CertificationXX
1.3.6.54FAA Experimental Type Certificate for GFE aircraft, flight testingXX
1.3.6.64FAA DER ApprovalsXX
1.3.6.74FAA Parts Manufacturing Authorization (PMA)XX
1.3.73Configuration/Data Management
1.3.7.14Physical Configuration AuditXX
1.3.7.24Functional Configuration AuditXX
1.3.83Other Systems Engineering 1...n (Specify)XX
1.3.93Digital Twin CIXX
1.42Program Management
1.4.13Software Program ManagementXX
1.4.23Integrated Logistics Support (ILS) Program ManagementXX
1.4.33Cybersecurity ManagementXX
1.4.43Core Program ManagementXX
1.4.53DMSMS ManagementXX
1.4.63Other Program Management 1...n (Specify)XX
1.52System Test and Evaluation
1.5.13Developmental Test and Evaluation
1.5.1.14Engineering Development TestsXX
1.5.1.24System Qualification TestXX
1.5.1.34Cybersecurity Test and Evaluation
1.5.1.3.15Cybersecurity Development TestXX
1.5.1.3.25Cybersecurity Operational TestXX
1.5.1.3.35Cybersecurity Other (1...n)XX
1.5.1.44Service/Agency DT&E 1...n (Specify) (GOV ONLY)XX
1.5.1.54Ground DT&E Tests 1...n (Specify)XX
1.5.1.64Flight DT&E Tests 1...n (Specify)XX
1.5.1.74Other DT&E Tests 1...n (Specify)XX
1.5.23Operational Test and Evaluation
1.5.2.14Cybersecurity Test and EvaluationXX
1.5.2.24Ground OT&E Tests 1..n (specify)XX
1.5.2.34Flight OT&E Tests 1…n (specify)XX
1.5.2.44Other OT&E Tests 1...n (Specify)XX
1.5.33Live Fire Test and EvaluationXX
1.5.43Mock-ups/System Integration Labs (SILs) (PT-406 Mock-up/Avionics System Integration Labs (ASIL))
1.5.4.14Integration and AssemblyXX
1.5.4.24Test and CheckoutXX
1.5.4.34Demonstration and Acceptance TestXX
1.5.53Test and Evaluation SupportXX
1.5.63Test FacilitiesXX
1.5.73ATD Contractor Verification Testing (CVT)XX
1.5.83ATD Government Acceptance Testing (GAT)XX
1.5.93Digital Twin
1.5.9.14Twin Software Release 1…n (specify)
1.5.9.1.15Twin Software CSCI 1…n (specify)XX
1.5.9.24Digital Twin Software Integration Assemly, Test and CheckoutXX
1.5.103Temporary Modification (T-2 MOD Package for Engineering Data Collection)
1.5.10.14Integration and AssemblyXX
1.5.10.24Test and CheckoutXX
1.5.10.34Data ReductionXX
1.62Training
1.6.13EquipmentX
1.6.1.14Aircrew Training Device (ATD)X
1.6.1.1.15ATD Kit Integration, Assembly, Test and CheckoutXXX
1.6.1.1.1.16Cockpit HardwareXXX
1.6.1.1.1.26Communication/Identification B-KitX
1.6.1.1.1.2.17Communication/Identification Integration, Assembly, Test, and CheckoutXXX
1.6.1.1.1.2.27Communication/Identification Box 1...n (Specify)X
1.6.1.1.1.2.2.18RadiosX
1.6.1.1.1.2.2.1.19Radio (Voice) 1...n (Specify)XXX
1.6.1.1.1.2.2.1.29Radio (Data) 1...n (Specify)XXX
1.6.1.1.1.2.2.1.39Traffic Advisory System (TAS) 8 LRUXXX
1.6.1.1.1.2.2.28Ancillary EquipmentX
1.6.1.1.1.2.2.2.19Antenna 1...n (Specify)XXX
1.6.1.1.1.2.2.2.29Amplifier 1...n (Specify)XXX
1.6.1.1.1.2.2.2.39Control Head 1..n (Specify)XXX
1.6.1.1.1.2.2.2.49Other Ancillary Equipment Subsystems 1...n (Specify)XXX
1.6.1.1.1.2.2.38Intercom System (Audio System/Intercom)X
1.6.1.1.1.2.2.3.19Audio System LRU 1…n (specify)XXX
1.6.1.1.1.2.2.48Communication Service Provider Contract 1..n (Specify)XXX
1.6.1.1.1.36Navigation/Guidance - B-KitX
1.6.1.1.1.3.17Navigation/Guidance Integration, Assembly, Test, and CheckoutXXX
1.6.1.1.1.3.27Navigation/Guidance Box 1...n (Specify)X
1.6.1.1.1.3.2.18Navigation Subsystem Loader LRUXXX
1.6.1.1.1.3.2.28Database Service Provider Contract 1…n (specify)XXX
1.6.1.1.1.46Mission Computer/Processing (Integrated Computing Subsystem) - B-KitX
1.6.1.1.1.4.17Mission Computer/Processing Integration, Assembly, Test, and CheckoutXXX
1.6.1.1.1.4.27Mission Computer/Processing Box 1...n (Specify)X
1.6.1.1.1.4.2.18Avionics Computer LRU 1XXX
1.6.1.1.1.4.2.28Avionics Computer LRU 2XXX
1.6.1.1.1.4.2.38Control Display Unit (CDU)/flight Management SystemXXX
1.6.1.1.1.4.2.48Air Data ComputerXXX
1.6.1.1.1.4.2.58Data Transfer Unit (DTU) LRUXXX
1.6.1.1.1.4.2.68Remote Input Output Unit LRUXXX
1.6.1.1.1.4.2.78Other Integrated Computing LRU 1..n (specify)XXX
1.6.1.1.1.4.2.88Other Mission Computer/Processing Subsystems 1...n (Specify)XXX
1.6.1.1.1.56Fire ControlXXX
1.6.1.1.1.66Data Display and Control B-KitX
1.6.1.1.1.6.17Data Display and Control Integration, Assembly, Test, and CheckoutXXX
1.6.1.1.1.6.27Data Display and Control Box 1...n (Specify)X
1.6.1.1.1.6.37Display SubsystemX
1.6.1.1.1.6.3.18FWD Primary Flight Display (PFD) LRUXXX
1.6.1.1.1.6.3.28FWD Multi-functional Displays (MFD) LRU 1…n (specify)XXX
1.6.1.1.1.6.3.38Other Data Display or Indicator LRU 1...n (Specify)XXX
1.6.1.1.1.6.47Data Entry and Control SubsystemX
1.6.1.1.1.6.4.18FWD Controllers LRU 1..n (specify)XXX
1.6.1.1.1.6.4.28Other Data Entry & Control LRU 1..n (specify)XXX
1.6.1.1.1.6.57Other Data Display & Control Subsystems 1...n (Specify)XXX
1.6.1.1.1.76SurvivabilityXXX
1.6.1.1.1.86Reconnaissance/SurveillanceXXX
1.6.1.1.1.96Automatic Flight Control - B-KitX
1.6.1.1.1.9.17Automatic Flight Control Integration, Assembly, Test, and CheckoutXXX
1.6.1.1.1.9.27Automatic Flight Control Box 1...n (Specify)X
1.6.1.1.1.9.2.18Electronic DevicesXXX
1.6.1.1.1.9.2.28Flight Control SensorsXXX
1.6.1.1.1.9.2.38Controlled Flight into Terrain - Prevention (CFIT-P)X
1.6.1.1.1.9.2.3.19CFIT-P LRUXXX
1.6.1.1.1.9.2.3.29Terrain Inhibit Switch/Indicator LRUXXX
1.6.1.1.1.9.2.3.39Other CFIT-P LRU 1..n (specify)XXX
1.6.1.1.1.9.2.48Other Automatic Flight Control Subsystems 1...n (Specify)XXX
1.6.1.1.1.106Standby Instrument Subsystem B-KitX
1.6.23Services
1.6.2.14Operator Instructional ServicesXX
1.6.2.1.15Development of Training MaterialsXX
1.6.2.1.25Provide Training (Developmental Test and Evaluation - Contractor Delivered Operations Training)XX
1.6.2.24Maintainer Instructional Services
1.6.2.2.15Development of Training MaterialsXX
1.6.2.2.25Provide Training (Developmental Test and Evaluation - Contractor Delivered Maintenance) Training)XX
1.6.33FacilitiesXX
1.6.43Training Software
1.6.4.14Host SW
1.6.4.1.15Display Software CSCI 1...n (Specify)XX
1.6.4.1.25Data Display and Control Software CSCI 1...n (Specify)XX
1.6.4.1.35Integrated Computing Software CSCI 1...n (Specify)XX
1.6.4.1.45CFIT-P Software CSCI 1...n (Specify)XX
1.6.4.1.55Sensor Software CSCI 1...n (Specify)XX
1.6.4.1.65Navigation/Guidance Software CSCI 1...n (Specify)XX
1.6.4.1.75Communication Software CSCI 1...n (Specify)XX
1.6.4.1.85Standby Instrument Software CSCI 1...n (Specify)XX
1.6.4.24Control Loading, Input/Output, and Sound (CLIOS) SW
1.6.4.2.15Communication Software CSCI 1...n (Specify)XX
1.6.4.34Instructor Operating System (IOS) SW
1.6.4.3.15Training Software CSCI 1...n (Specify)XX
1.6.4.44Virtual Crew Station Software Release 1...n (Specify)
1.6.4.4.15Virtual Crew Station Software CSCI 1...n (Specify)X
1.6.4.4.25Virtual Crew Station Software Integration, Assembly, Test and CheckoutX
1.72DataXX
1.7.13Data Deliverables 1...n (Specify)XX
1.7.1.14Engineering DataXX
1.7.1.24Technical OrdersXX
1.7.23Data RepositoryXX
1.7.33Data Rights 1...n (Specify)
1.7.3.14Group B Hardware DesignXX
1.7.3.24Group B Software DesignXX
1.7.3.34Group A Hardware DesignXX
1.7.3.44ATD Hardware DesignXX
1.7.3.54ATD Software DesignXX
1.7.3.64Software Development KitXX
1.7.3.74Software LicensesXX
1.82Peculiar Support EquipmentX
1.8.13Test and Measurement EquipmentX
1.8.1.14Test and Measurement Equipment (Airframe/Hull/Vehicle)XXX
1.8.1.24Test and Measurement Equipment (Propulsion)XXX
1.8.1.34Test and Measurement Equipment (Electronics/Avionics)XXX
1.8.1.44Test and Measurement Equipment (Other Major Subsystems 1...n (Specify))XXX
1.8.23Support and Handling EquipmentX
1.8.2.14Support and Handling Equipment (Airframe/Hull/Vehicle)XXX
1.8.2.24Support and Handling Equipment (Propulsion)XXX
1.8.2.34Support and Handling Equipment (Electronics/Avionics)XXX
1.8.2.44Support and Handling Equipment (Other Major Subsystems 1...n (Specify))XXX
1.92Common Support EquipmentX
1.9.13Test and Measurement EquipmentX
1.9.1.14Test and Measurement Equipment (Airframe/Hull/Vehicle)XXX
1.9.1.24Test and Measurement Equipment (Propulsion)XXX
1.9.1.34Test and Measurement Equipment (Electronics/Avionics)XXX
1.9.1.44Test and Measurement Equipment (Other Major Subsystems 1...n (Specify))XXX
1.9.23Support and Handling EquipmentX
1.9.2.14Support and Handling Equipment (Other Major Subsystems 1...n (Specify))XXX
1.102Operational/Site Activation by Site 1...n (Specify)
1.10.13System Assembly, Installation, and Checkout on Site
1.10.1.14Deployment HW and SWXX
1.10.1.24Site ActivationXX
1.10.23Contractor Technical SupportXX
1.10.33Site ConstructionXX
1.10.43Site/Ship/Vehicle ConversionXX
1.10.53Interim Contractor Support (ICS)XX
1.112Contractor Logistics Support (CLS)XX
1.122Industrial FacilitiesXX
1.132Initial Spares and Repair PartsX
1.13.13PMP Spare and Repair 1...n (Specify)XXX
1.13.23Support Equipment Spare and Repair PartsXXX
1.13.33Training Equipment Spare and Repair PartsXXX
1.13.43Packaging, Handling, Storage, and Transportation (PHS&T)X
1.13.4.14ContainersXXX
1.13.4.24TransportationXXX

Subtotal Cost X X

Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX

Reporting Contractor Profit/Loss or Fee X X

Total Price X X

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile), Quantity Data ReportContract AwardInitial
2Technical Data ReportContract AwardInitial
3Cost and Hour Report (FlexFile), Quantity Data ReportSystem Requirements Review (SRR)Interim
4Technical Data ReportSystem Requirements Review (SRR)Interim
5Cost and Hour Report (FlexFile), Quantity Data ReportPreliminary Design Review (PDR)Interim
6Technical Data ReportPreliminary Design Review (PDR)Interim
7Cost and Hour Report (FlexFile), Quantity Data ReportCritical Design Review (CDR)Interim
8Technical Data ReportCritical Design Review (CDR)Interim
9Cost and Hour Report (FlexFile), Quantity Data ReportAnnual Report 1...nInterim
10Technical Data ReportAnnual Report 1...nInterim
11Cost and Hour Report (FlexFile), Quantity Data ReportFirst Production Representative Unit DeliveredFinal
12Technical Data ReportFirst Production Representative Unit DeliveredFinal
13Cost and Hour Report (FlexFile), Quantity Data ReportContract Completion (60 days from completion)Final
14Technical Data ReportContract Completion (60 days from completion - Total Contract Actuals)Final
15Cost and Hour Report (FlexFile), Quantity Data ReportOptionalInterim
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS

The contractor must report costs on all CLINs associated with the (Insert contract name) contract including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. Costs should not be omitted based on contract CLIN structure or definition.

INITIAL REPORT

Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR plan.

i. Submission events marked "Initial" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No Actual To Date costs are anticipated to reported on an "Initial" submission except for any certified precontract costs incurred prior to or on the date of contract award.

ii. Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported Actuals To Date, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).

iii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.

COVID-19 Remarks:

The Reporting Entity shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.

Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.

If applicable, the Reporting Entity shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.

If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.

Additional Data Fields #1-#12 (FlexFile): If applicable, the Reporting Entity shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

FAC vs EAC

The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.

NON-RECURRING/RECURRING DEFINITIONS

Recurring and Non-Recurring Costs required for all levels:

Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management.

Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out.

Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.

Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.

Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.

Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.

Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.

Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.

Examples of System Test and Evaluation activities include development of test plans/procedures; subsystem and system level test and integration for developmental articles; test equipment in support of development including for static & fatigue testing, test stands, wind tunnel models, stress analysis, ballistics testing, flight, ground or sea testing of system, redesign from testing, retesting; System/Software Integration Laboratory (SIL) development; and analysis to support verification, validation & certification. Examples of Training activity include initial courseware development and simulator development. Examples of Initial Spares and Repair Parts activity include spare parts and material in support of the nonrecurring subsystem/system level articles.

Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.

IRAD EFFORT

The contractor should list the major relevant IRAD projects leveraged for this development effort, provide a brief description of the cost of the projects, and provide/attach any more detailed actual cost information at the level available.

WBS Index and Dictionary

The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.

For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES

Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

1921-3 CONTRACTOR BUSINESS DATA REPORT

a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA.If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.

END ITEMS/ORDER LOTS SCOPE IDIQ

Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.

UNIT/SUBLOT REPORTING

The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7.

QUANTITY REPORTING

a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

SRDR DEVELOPMENT- RELEASES AND COMPUTER SOFTWARE CONFIGURATION ITEMS (CSCIs)

For Software Release and CSCI WBS Element Names identified in Item 11c. as Subcomponent Release 1..n or Subcomponent CSCI 1..n, the Reporting Entity must specify the specific releases and associated CSCIs at the post award meeting in order to revise the CSDR Plan to reflect the Reporting Entity’s actual releases and associated CSCIs. See the SRDR Implementation Guide for more detail https://cade.osd.mil/policy/srdr

FINAL COST REPORT

Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.

CSDR READINESS REVIEW (CSDR-RR) also known as Post Award Conference (PAC)

The Reporting Entity shall attend and participate in a CSDR Readiness Review meeting (also known as the Post award CSDR conference) which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and standard functional categories in the FlexFile (functional data elements in the 1921 series) codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary.

RESOURCE DISTRIBUTION TABLE (RDT)

The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DODI 5000.73 and DoDM 5000.04-M-1.

PERIOD OF PERFORMANCE (POP)

If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance.

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1TMRR
2EMD
3Production
17. END ITEMS
a. IDb. NAME
1T-6A Test Aircraft
2T-6A Aircraft
3T-6A Operational Flight Trainers (OFT)
4T-6A Instrument Flight Trainers (IFT)
5T-6A Unit Training Devices
6T-6A Egress Procedure Trainers (EPT)
7T-6A Ejection Seat Trainers (EST)
8Common
18. OPTIONAL REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT REPORTING
(X if applicable)d. SEQUENCING

(X if applicable)

11XX
12XX
13XX
14XX
15XX
16XX
17XX
18XX
21XX
22XX
23XX
24XX
25XX
26XX
27XX
28XX
31XX
32XX
33XX
34XX
35XX
36XX
37XX
38XX
DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

DD Form 2794, Pg 6 (SRDR DEV)

COST AND SOFTWARE DATA REPORTING PLAN - SRDR DEVELOPMENT
19. RELEASES
a. IDb. NAMEc. DATE
20. CSCI'S
a. IDb. NAME
21. PRODUCT SIZE REPORTING ELEMENTS
a. CODEb. NAMEc. RELEASE IDd. CSCI ID
22. PRODUCT SIZE SUBMISSIONSc. RELEASE ID:
a. NUMBERb. NAMEIncluded?Included?Included?

DRAFT DD FORM 2794 (PAGE 6), SRDR DEVELOPMENT, JANUARY 2019

DD Form 2794, Pg 8 (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS
26. WBS
ELEMENT CODE27. WBS ELEMENT NAME28. ITEM TYPE29. TECHNICAL PARAMETER
a. PARAMETER NAMEb. UNIT OF MEASUREc. UNIT OF MEASURE QUALIFIERd. REPEATABLEe. REMARKS
1.1Prime Mission Product (PMP) 1...n (Specify)HeritageNew DesignPercent
1.1Prime Mission Product (PMP) 1...n (Specify)HeritagePredecessor SystemDescriptor
1.1.1PMP Integration, Assembly, Test and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.1.1PMP Integration, Assembly, Test and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.1.1PMP Integration, Assembly, Test and CheckoutIAT&CONumber of Interface Control Drawings (ICD)QuantityDrawings
1.1.2Communication/IdentificationHeritageNew DesignPercent
1.1.2Communication/IdentificationHeritagePredecessor SystemDescriptor
1.1.2.1Communication/Identification Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.1.2.1Communication/Identification Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.1.2.1Communication/Identification Integration, Assembly, Test, and CheckoutIAT&CONumber of Interface Control Drawings (ICD)QuantityDrawings
1.1.2.2Communication/Identification Box 1...n (Specify)HeritageNew DesignPercent
1.1.2.2Communication/Identification Box 1...n (Specify)HeritagePredecessor SystemDescriptor
1.1.2.2Communication/Identification Box 1...n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2.2Communication/Identification Box 1...n (Specify)PhysicalElecVolumeCubic Inches
1.1.2.2Communication/Identification Box 1...n (Specify)PhysicalElecWeightPounds
1.1.2.2Communication/Identification Box 1...n (Specify)PhysicalElecWeight - StructuralPounds
1.1.2.2Communication/Identification Box 1...n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.2.2Communication/Identification Box 1...n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.2.2Communication/Identification Box 1...n (Specify)ElecBoxCircuit Cards - Number ofQuantityCards
1.1.2.2Communication/Identification Box 1...n (Specify)ElecBoxApplication Specific Integrated Circuit (ASIC) DesignsQuantityASICs
1.1.2.2Communication/Identification Box 1...n (Specify)ElecBoxField Programmable Gate Array (FPGA) DesignsQuantityFPGAs
1.1.2.2.1.1Radio (Voice) 1...n (Specify)HeritageNew DesignPercent
1.1.2.2.1.1Radio (Voice) 1...n (Specify)HeritagePredecessor SystemDescriptor
1.1.2.2.1.1Radio (Voice) 1...n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2.2.1.1Radio (Voice) 1...n (Specify)PhysicalElecVolumeCubic Inches
1.1.2.2.1.1Radio (Voice) 1...n (Specify)PhysicalElecWeightPounds
1.1.2.2.1.1Radio (Voice) 1...n (Specify)PhysicalElecWeight - StructuralPounds
1.1.2.2.1.1Radio (Voice) 1...n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.2.2.1.1Radio (Voice) 1...n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.2.2.1.1Radio (Voice) 1...n (Specify)ElecBoxCircuit Cards - Number ofQuantityCards
1.1.2.2.1.1Radio (Voice) 1...n (Specify)ElecBoxApplication Specific Integrated Circuit (ASIC) DesignsQuantityASICs
1.1.2.2.1.1Radio (Voice) 1...n (Specify)ElecBoxField Programmable Gate Array (FPGA) DesignsQuantityFPGAs
1.1.2.2.1.1Radio (Voice) 1...n (Specify)TransReceivRFBandwidthMegahertz
1.1.2.2.1.1Radio (Voice) 1...n (Specify)TransReceivRFTransmitter Power Output - PeakWatts
1.1.2.2.1.1Radio (Voice) 1...n (Specify)TransReceivRFTransmitter Power Output - AverageWatts
1.1.2.2.1.2Radio (Data) 1...n (Specify)HeritageNew DesignPercent
1.1.2.2.1.2Radio (Data) 1...n (Specify)HeritagePredecessor SystemDescriptor
1.1.2.2.1.2Radio (Data) 1...n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2.2.1.2Radio (Data) 1...n (Specify)PhysicalElecVolumeCubic Inches
1.1.2.2.1.2Radio (Data) 1...n (Specify)PhysicalElecWeightPounds
1.1.2.2.1.2Radio (Data) 1...n (Specify)PhysicalElecWeight - StructuralPounds
1.1.2.2.1.2Radio (Data) 1...n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.2.2.1.2Radio (Data) 1...n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.2.2.1.2Radio (Data) 1...n (Specify)ElecBoxCircuit Cards - Number ofQuantityCards
1.1.2.2.1.2Radio (Data) 1...n (Specify)ElecBoxApplication Specific Integrated Circuit (ASIC) DesignsQuantityASICs
1.1.2.2.1.2Radio (Data) 1...n (Specify)ElecBoxField Programmable Gate Array (FPGA) DesignsQuantityFPGAs
1.1.2.2.1.2Radio (Data) 1...n (Specify)TransReceivRFBandwidthMegahertz
1.1.2.2.1.2Radio (Data) 1...n (Specify)TransReceivRFTransmitter Power Output - PeakWatts
1.1.2.2.1.2Radio (Data) 1...n (Specify)TransReceivRFTransmitter Power Output - AverageWatts
1.1.2.2.1.2Radio (Data) 1...n (Specify)ComputerSimultaneous Multi-Mode OperationList
1.1.2.2.1.2Radio (Data) 1...n (Specify)ComputerProcessor TypeDescriptor
1.1.2.2.1.2Radio (Data) 1...n (Specify)ComputerComputing PerformanceMillions of Instructions per Second
1.1.2.2.2.1Antenna 1...n (Specify)HeritageNew DesignPercent
1.1.2.2.2.1Antenna 1...n (Specify)HeritagePredecessor SystemDescriptor
1.1.2.2.2.1Antenna 1...n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2.2.2.1Antenna 1...n (Specify)PhysicalElecVolumeCubic Inches
1.1.2.2.2.1Antenna 1...n (Specify)PhysicalElecWeightPounds
1.1.2.2.2.1Antenna 1...n (Specify)PhysicalElecWeight - StructuralPounds
1.1.2.2.2.1Antenna 1...n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.2.2.2.1Antenna 1...n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.2.2.2.1Antenna 1...n (Specify)AntennaFrequency RangeMegahertz