DRAFT CSDR Plan F100 RDN DD Form 2794.xls

DoD Form XLS spreadsheet 84 KB Posted

Attached to
Regional Depot Network (RDN) Re-manufacture of F100-PW-220/-220E/-229/-229EEP Series Engine Modules
Solicitation number
SPRTA1-23-R-0196
Issued by

About this file

This document is a draft Cost and Software Data Reporting (CSDR) Plan for the remanufacture of F100 engine modules for foreign military sales customers.

The plan covers a potential 10-year firm fixed price requirements contract between the Defense Logistics Agency Aviation and a contractor to remanufacture F100-PW-220/-220E/-229/-229EEP engine modules, including the inlet fan, core, fan drive turbine, high pressure turbine, and gearbox. Key details include the work breakdown structure to be used for reporting, definitions of recurring and nonrecurring costs, requirements for interim and final reporting, and schedules and formats for cost and hour reports, quantity data reports, and maintenance and repair parts reports. The plan also provides instructions for mapping costs to the work breakdown structure and segregating recurring and nonrecurring costs. Submission events are identified for contract award, biennial interim reports, and contract completion.

View the file

Other versions and copies of DD Form 2794

File Revision Posted Attached to
9. DD2794_Cost and Software Reporting Plan_AF-24-M-C1_20240510.xls May 10, 2024 Space Development Agency (SDA) Advanced Fire Control Ground Infrastructure (AFCGI)
Attachment_21_DD2794 Avionics CSDR Plan_21 Nov 2022.xlsx Nov 21, 2022 T-6A Avionics Replacement Program
Attachment 0005 DD2794 Sustainment CSDR Standard Plan 23-R-0075 PRID 2022H018.xlsx 2022 Fuel Tank Combo-Pack for the Apache AH-64
Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan.xlsx Revision not stated Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
DHMS Deployment DD2794 CSDR Plan.xlsx Revision not stated Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS) Deployment Solutions
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf Revision not stated KC-135 Center Console Refresh (CCR) Revision 2
Attachment 0004 - DD2794 CSDR.xls Revision not stated Head, Rotary Wing for the Apache AH-64
Attachment 0005 - DD2794 Sustainment CSDR Standard Plan 23-B-0037.cplan.XML_Finalized.pdf Revision not stated Head, Rotary Wing for the Apache AH-64
ATTACHMENT 8 DD 2794 IDIQ CSDR Plan v2.xlsx Revision not stated RFP - Space Test Experiments Platform (STEP) 2. 0
J-16 DD 2794 CSDR Plan for BVY-1 ISIS TI-26-28-30 (2023-08-04) FINALIZED MEMO.pdf Revision not stated BVY-1 ISIS TI-26 TI-28 TI-30 Solicitation
DD2794 COST AND SOFTWARE DATA REPORTING PLAN.xls Revision not stated KC-135 Center Console Refresh (CCR)
TMIP-J Attachment 7 DD2794 CSDR Standard Plan.xls Revision not stated Theater Medical Information Program Joint (TMIP-J) Sustainment
Attachment 15 - DD2794 MK41 VLS Launcher.xls Revision not stated FY 22-27 MK 41 Vertical Launching System (VLS) Production
Attachment_0001_DD2794_CSDR_Plan.xls Revision not stated F-16 Brake Control System Redesign (BCSR)
Exhibit A1 A004 DD Form 2794 DISC_CSDR_Plan.xls Revision not stated Directorate for Test Resources (DTR) Instrumentation Support Contract (DISC) Draft RFP
N0010419RK082 Attach 1 - CSDR Co-Plan, DD Form 2794.pdf Revision not stated JSF C/P Cartridges IDIQ
APPENDIX_C_CSDR__DD2794_Attachment.xlsx Revision not stated KC-135 Aero-I SATCOM Replacement
Attachment_J-5_DD_2794_Co-Plan_for_MMM-_Procurement.xlsx Revision not stated Multifunction Modular Mast
Attachment_J-6_-_DD_2794_Co-Plan_for_MMM-_Development.xlsx Revision not stated Multifunction Modular Mast
ATT 54 CSDR DD 2794.xls Revision not stated T-34/T-44/T-6 Aircraft Maintenance and Contractor Logistics Support
Show all 20

Who attaches DD Form 2794

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 2794, Pg 1 (METADATA)

COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
DLA - Defense Logistics Agency
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
C-FRP
XO&S
1c. PRIME MISSION PRODUCT
Remanufactured Engines Modules (F100 -220/-229) for Foreign Parnter Nations (FMS)
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
XOther
2. COMMODITY TYPE
Engine Subsystems
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20231128
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Germony, Daniel
6b. ADDRESS (Include ZIP Code)
1800 Defense Pentagon

BE828

Washington, DC 20301-1800

6c. TELEPHONE NUMBER (Include Area Code)
(703) 901-8678
6d. E-MAIL ADDRESS
Daniel.R.Germony.civ@mail.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
OSD CAPE
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
TBD
iii. LOCATION
TBD
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD - (D-20-A-C38)
9c. APPROPRIATION (check all that apply)
RDT&E
XPROCUREMENT
O&M
XFMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
D-20-A-C38
10b. APPROVED PLAN REVISION NUMBER
0
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
TECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01F100 FMS Regional Depot Network
1.12Unit-Level ManpowerXX
1.22Unit OperationsXX
1.32MaintenanceX
1.3.13Consumables and Repair PartsXXXX
1.3.23Depot Level Reparables (DLRs) / Repair of Reparables (RORs)XXXX
1.3.33Intermediate MaintenanceXXXX
1.3.43Depot MaintenanceX
1.3.4.14Scheduled OverhaulXXXX
1.3.4.24Unscheduled OverhaulXXXX
1.3.53Other MaintenanceXXXX
1.3.63Packing, Handling, Shipping and Transportation (PHS&T)X
1.3.6.14ContainersXXXX
1.3.6.24TransportationXXXX
1.42Sustaining Support
1.4.13System-Specific TrainingXX
1.4.23Support Equipment Replacement and Repair
1.4.2.14Support Equipment ReplacementXXX
1.4.2.24Support Equipment RepairXXX
1.4.33Sustaining/Systems EngineeringXX
1.4.43Program ManagementXX
1.4.53Data and Technical PublicationsXX
1.4.63Simulator Operations and RepairXX
1.4.73Other Sustaining Support (Specify in Remarks)X
1.52Continuing System ImprovementsX
1.5.13Hardware ModificationsXXX
1.5.23Software SupportXX
Subtotal CostXX
Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX
Reporting Contractor Profit/Loss or FeeXX
Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile), Quantity Data ReportContract AwardInitial2025053120250731
2Cost and Hour Report (FlexFile), Quantity Data ReportBiennial Submission 1Interim2027053120270731
3Maintenance and Repair Parts Data ReportBiennial Submission 1Interim2027053120270731
4Cost and Hour Report (FlexFile), Quantity Data ReportBiennial Submission 2Interim2029053120290731
5Maintenance and Repair Parts Data ReportBiennial Submission 2Interim2029053120290731
6Cost and Hour Report (FlexFile), Quantity Data ReportBiennial Submission 3Interim2031053120310731
7Maintenance and Repair Parts Data ReportBiennial Submission 3Interim2031053120310731
8Cost and Hour Report (FlexFile), Quantity Data ReportBiennial Submission 4Interim2033053120330731
9Maintenance and Repair Parts Data ReportBiennial Submission 4Interim2033053120330731
10Cost and Hour Report (FlexFile), Quantity Data ReportContract CompleteFinal2035053120350731
11Maintenance and Repair Parts Data ReportContract CompleteFinal2035053120350731
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
a. CSDR Planning Approach & Preparation Instructions
1. In addition to the direction provided in the associated CSDR Data Item Descriptions (DIDs) and the CSDR Manual (DoDM 5000.04), the following instructions, requirements, and considerations found on this page/worksheet shall be utilized when collecting data and preparing CSDR submissions.

2. This CSDR Contract plan is intended to capture costs associated with the contract number(s) listed in block 9.b. The contractor shall capture and report any and all costs incurred in order to perform the scopes of work on the Contract irrespective of contract type (e.g., firm-fixed price, cost-plus fixed fee) or funding source (i.e., via contract, via contractor internal research & development funds). The reporting entity is not expected or required to significantly modify its accounting system or technical approach to execution solely to comply with this CSDR Plan’s reporting requirements. The reporting entity is not required to track costs from specific employees, purchase orders, agreements, or subcontracts if it utilizes a standard cost accounting system and may utilize internal standard costs when prepared CSDR deliverables if those standard costs represent the most accurate “actual” cost data available to the reporting entity.

3. Costs reported against this CSDR plan shall be cumulative in nature (i.e., each submission shall report any and all costs incurred on and prior to the submission’s “AS OF DATE” (block 14.e)).

4. Other than the Resource Distribution Table, submission events associated with this CSDR plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR plan.

ii. "Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported ATD, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).

ii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.

5. Regarding the WBS Structure (block 11): This CSDR Plan utilizes the Office of the Secretary of Defense Cost Assessment and Program Evaluation Operating and Support Cost-Estimating Guide's Cost Estimating Structure (available here: https://www.cape.osd.mil/files/OS_Guide_Sept_2020.pdf) as the baseline for its WBS which has been extended to provide additional insight into system(s) or subsystem(s) which the Government believes to be high-risk or high-technical-interest in accordance with DoD Manual 5000.04. The contractor shall utilize the definitions found in the Operating and Support Cost-Estimating Guide when mapping its costs into this CSDR plan’s WBS.

i. The contractor may extend any WBS element to allow the contractor to provide additional insight into its technical solution. Any and all extensions or tailoring of the WBS shall be in accordance with the Office of the Secretary of Defense Cost Assessment and Program Evaluation Operating and Support Cost-Estimating Guide's Cost Estimating Structure, the WBS guidelines included in MIL-STD-881E, and DoD Manual 5000.04.

ii. If changes to the contract scope, hours, or options (as applicable) necessitate the need to revise or add additional WBS elements to remain in compliance with the Operating and Support Cost-Estimating Guide's Cost Estimating Structure, MIL-STD-881E, or DoD Manual 5000.04, any associated contract cost/price changes related to the updated CSDR Plan or submission of revised CSDR deliverables, shall be included within the contract modification that awards the changed scope of work, hours, or options (as applicable).

b. Resource Distribution Table
1. Submissions of the Resource Distribution Table (RDT) are required under the following conditions:

i. An RDT shall be delivered seven calendar days before the “Post-Award Cost and Software Data Reporting Conference”. Prepare this submission of the RDT at FAC/EAC value and utilizing the instructions at Block15.a.4.i.This copy of the RDT will be used during the “Post-Award Cost and Software Data Reporting Conference” in order to finalize which subcontractors will be required to provide CSDR reporting via electronic submission of deliverables directly to the Defense Cost and Resource Center (DCARC) and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

ii. An RDT shall be delivered within thirty calendar days of the contractor identifying that a subcontractor who, at the time of initial subcontractor award, was not anticipated to qualify for direct subcontractor CSDR reporting via electronic submission of deliverables directly to the DCARC but is subsequently anticipated to meet the CSDR direct reporting subcontractor threshold value due to changes to scopes of work, end-item design, subcontractor/supplier, or subcontract price changes since initial contract award (unless the newly identified subcontractor has already been issued a subcontractor reporting waiver associated with this contract).

c. Submission Dates
1. All CSDR deliverable “AS OF DATES” and “DUE DATES” listed in blocks 14.e and 14.f are identified for planning purposes only. Submission dates are subject to change and are determined in accordance with the event drivers as identified below:

i. Interim Submission(s): Submission events marked as an "Interim" submission in block 14.d shall have an "AS OF DATE" based on the submission event name in block 14.c. For example, if the submission event name was "Contract Award Plus 24 Months" then the submission's "AS OF DATE" is the contract award date plus 24 calendar months. If the submission event name was "Complete Delivery of First Article Test Assets" then the submission's "AS OF DATE" would be the date the final First Article Test Asset was delivered.

ii. Final Submission(s): Submission events marked as "Final" submission in block 14.d shall have an "AS OF DATE" when the following conditions have been met:

1. Condition 1: All end items anticipated to be procured on the contract have been delivered and accepted by the government (e.g., as evidenced by a completed DD Form 250) or higher tier contractor in the case of a subcontractor.

2. Condition 2: 95% or more of all ATD total costs have been incurred relative to all costs the reporting entity expects to incur for each and every Order/Lot (defined in Data Group B, Item 4 of the approved FlexFile DID).

d. Cost and Hour Report (FlexFile) & Quantity Data Report
1. FAC vs. EAC: Block 12.e of this CSDR plan indicate that a "Forecast at Completion" (FAC) is required to be reported in CSDR deliverables. The FAC required is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.

2. Nonrecurring/Recurring Segregation: The contractor shall utilize the specific definitions and requirements in the CSDR Manual (DoDM 5000.04) and the definitions in the DID for the Cost and Hour Report (FlexFile) report (DI-FNCL-82162) to segregate Recurring and Nonrecurring costs discretely and not as an aggregate.

3. Order Lot Scope: Block 16 of this CSDR Plan is meant to capture the discrete Delivery Orders/Task Orders (as applicable) exercised on the contract. If a Delivery Order/Task Order (as applicable) is exercised on the contract but is not listed in block 16, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the Delivery Order/Task Order (as applicable) utilized on the contract. The CSDR Plan will be updated to include the appropriate Delivery Order/Task Order (as applicable) name in block 16, after report submission, if required.

i. If a Delivery Order/Task Order (as applicable) is exercised on the contract but is not listed in block 16, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the Delivery Order/Task Order (as applicable) utilized on the contract. The CSDR Plan will be updated to include the appropriate Delivery Order/Task Order (as applicable) name in block 16, after report submission, if required.

4. End Item Scope: Block 17 of this CSDR Plan is meant to capture the discrete hardware end items that are DD-250'ed, ordered, procured, or exercised (as applicable) on the contract to the greatest degree possible given the reporting entity’s accounting system capabilities and technical approach to contract execution. If an End Item is DD-250'ed, ordered, procured, or exercised (as applicable) on the contract but is not listed in block 17, the contractor shall submit the dollars and hours in the Cost and Hour Report (FlexFile) and the quantity information in the Quantity Report tagged using the name of the End Item utilized on the contract. The CSDR Plan will be updated to include the appropriate End Item name in block 17, after report submission, if required. If the reporting entity’s accounting system and technical approach to contract execution does not allow for the segregation and reporting of data at the level indicated in block 17, it shall seek Government approval on an alternate set of end item IDs or revisions to the WBS that provide insight into actual contractual costs at a time no later than the completion of the CSDR Readiness Review. The reporting entity may utilize internal standard costs when reporting hardware or material costs when its accounting system cannot associate specific purchase orders or subcontractor agreements to the contract number(s) listed in block 9.b.

e. Period Of Performance & Additional Scope Of Work
1. If the Contract period of performance is extended by more than six months, or if the scope of work is modified to include work not otherwise covered by the CSDR Plan, the government may modify the CSDR Plan to require additional submission events and add additional WBS elements in order to ensure the accurate and complete collection of cost data associated with the modified contract. Depending on the scope and complexity of the contract modification, the contractor may be required to host or attend an additional Post-Award Cost and Software Data Reporting Conference to review the CSDR Plan changes and the contractor’s plan to collect and report costs associated with the additional scope of work.
f. FAC vs EAC
1. The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.
g. 1921-3 CONTRACTOR BUSINESS DATA REPORT
1. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

2. Reports are submitted annually at the end of the contractor's fiscal year.

3. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

4. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.

h. Cost Accounting Standards (CAS) Disclosure Statement Differences
1. The contractor shall follow the accounting procedures specified in its latest approved CAS Disclosure Statement and with any clauses or requirements included in the contract. As part of the Post-Award Cost and Software Data Reporting Conference, the contractor shall identify any aspect(s) of its latest approved CAS Disclosure Statement which preclude or inhibit compliance with this CSDR Plan and DoD 5000.04 (CSDR Manual). The contractor shall identify any deviations from its CAS disclosure statement it intends to utilize to prepare CSDR submissions.
i. Nonrecurring/Recurring Segregation
1. The contractor shall utilize the specific definitions and requirements in the CSDR Manual (DoDM 5000.04) and the definitions in the DID for the Cost and Hour Report (FlexFile) report (DI-FNCL-82162) to segregate Recurring and Nonrecurring costs discretely and not as an aggregate.
j. Common
i. End Item ID Common: The "Common" end item tag shall be used to report costs and hours which are not incurred or directly attributable to an individual end item. For example, overarching program management costs and hours that are required, independent of the type or quantity of end items on contract would be tagged against the “Common” end item. Common hardware (i.e., identical/homogeneous part numbers) procured and integrated into multiple end items shall utilize the end item tag for the prime product they were integrated onto and shall not be tagged with the “Common” end item.
k. CSDR Readiness Review
1. The contractor shall host a CSDR Readiness Review (CSDR-RR) at the contractor’s facility where CSDRs are prepared with the Government’s Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoD Manual 5000.04 (CSDR Manual). The purpose of the CSDR-RR is to review the contract’s CSDR requirements and assess how the Contractor’s accounting system satisfies the CSDR requirements found in DoD 5000.04 (CSDR Manual) and this CSDR Plan. In a briefing presented by the Contractor in its own format, the Contractor shall:

i. Demonstrate how it collects cost data in its accounting system and how that data will be utilized to provide actual cost transactions and minimize cost allocations when preparing CSDR data deliverables.

ii. Describe how recurring vs. nonrecurring costs are segregated in its accounting system and for the purpose of CSDR reporting.

iii. Demonstrate how the data from its accounting system will be mapped into the CSDR reports required by this CSDR Plan and associated CDRLs.

iv. Present the methodologies used for mapping internal cost accounts to the WBS, specifically showing how individual WBS elements and functional element codes will be populated.

v. Propose any changes to this CSDR Plan in order to tailor the plan to the contractor's accounting system to include any contractor recommended changes or additions to the WBS elements or end item IDs. These changes may include adjustments to the submission events and/or submission timelines, particularly in the case of a direct-reporting subcontractor performing against a different delivery schedule than the associated prime contractor.

vi. The contractor and CWIPT will also review the initial submission of the "Resource Distribution Table (RDT)", in order to finalize which subcontractors will be required to provide CSDR reporting and electronic submission of deliverables directly to the Defense Cost and Resource Center (DCARC) and which subcontractors may qualify for a CSDR direct reporting subcontractor waiver.

vii. The CSDR-RR shall be held within 60 days of contract award or the start of work meeting on a date mutually agreed to by the CWIPT and the contractor. This meeting has an anticipated duration of one business day.

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1..nDelivery Order 1…nO&S
17. END ITEMS
a. IDb. NAME
1..NNIINs..n
18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT/SUBLOT REPORTING
(X if applicable)d. UNIT SEQUENCING

(X if applicable)

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

File details come from the government source that posted it. Updated .